3. An equipment installation job in the completion stage can be completed in 50 days of 8 houriday work, with 50 men working. With the contract expiring in 40 days, the AB engineer contractor decided to add 15 men on the job, overtime not being permitted. If the liquidated damages is P5000 per day of delay, and the men are paid P150 per day, how much money would he save with the additional workers? (P44,750.00) 4. A fixed capital investment of P10,000,000 is required for a proposed manufacturing plant and an estimated working capital of P2,000,000. Annual depreciation is estimated to be 10% of the fixed capital investment. Determine the rate of return on the total investment if the annual profit is P2,500,000. (28.33%) 5. An 8-meter wide concrete road pavement 500 meters long is desired to be constructed over a well- compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order to put the subgrade on an even level grade. a 500 cubic meters of sand filing is necessary, over which

Algebra for College Students
10th Edition
ISBN:9781285195780
Author:Jerome E. Kaufmann, Karen L. Schwitters
Publisher:Jerome E. Kaufmann, Karen L. Schwitters
Chapter14: Sequences And Mathematical Induction
Section14.3: Another Look At Problem Solving
Problem 30PS
icon
Related questions
Question
3. An equipment installation job in the completion stage can be completed in 50 days of 8 hour/day work,
with 50 men working. With the contract expiring in 40 days, the AB engineer contractor decided to add
15 men on the job, overtime not being permitted. If the liquidated damages is P5000 per day of delay,
and the men are paid P150 per day, how much money would he save with the additional workers?
(P44,750.00)
4. A fixed capital investment of P10,000,000 is required for a proposed manufacturing plant and an
estimated working capital of P2,000,000. Annual depreciation is estimated to be 10% of the fixed
capital investment. Determine the rate of return on the total investment if the annual profit is
P2,500,000. (28.33%)
5. An 8-meter wide concrete road pavement 500 meters long is desired to be constructed over a well-
compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order
to put the subgrade on an even level grade, a 500 cubic meters of sand filing is necessary, over which
Transcribed Image Text:3. An equipment installation job in the completion stage can be completed in 50 days of 8 hour/day work, with 50 men working. With the contract expiring in 40 days, the AB engineer contractor decided to add 15 men on the job, overtime not being permitted. If the liquidated damages is P5000 per day of delay, and the men are paid P150 per day, how much money would he save with the additional workers? (P44,750.00) 4. A fixed capital investment of P10,000,000 is required for a proposed manufacturing plant and an estimated working capital of P2,000,000. Annual depreciation is estimated to be 10% of the fixed capital investment. Determine the rate of return on the total investment if the annual profit is P2,500,000. (28.33%) 5. An 8-meter wide concrete road pavement 500 meters long is desired to be constructed over a well- compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order to put the subgrade on an even level grade, a 500 cubic meters of sand filing is necessary, over which
5. An 8-meter wide concrete road pavement 500 meters long is desired to be constructed over a well-
compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order
to put the subgrade on an even level grade, a 500 cubic meters of sand filing is necessary, over which
the 10-inch concrete pavement will be placed.
Assume the following data:
A. Sand fill, including rolling and watering = P100 per cubic meter
B. Concrete pavement, 10 inches thick (labor and materials) including curing = P 220 per sq. meter
c. Curbs and gutters = P120 per linear meter
How much will the project cost allowing 15% for contingency? (P1,207,500)
Transcribed Image Text:5. An 8-meter wide concrete road pavement 500 meters long is desired to be constructed over a well- compacted gravel road, together with the necessary concrete curbs and gutters on both sides. In order to put the subgrade on an even level grade, a 500 cubic meters of sand filing is necessary, over which the 10-inch concrete pavement will be placed. Assume the following data: A. Sand fill, including rolling and watering = P100 per cubic meter B. Concrete pavement, 10 inches thick (labor and materials) including curing = P 220 per sq. meter c. Curbs and gutters = P120 per linear meter How much will the project cost allowing 15% for contingency? (P1,207,500)
Expert Solution
steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Recommended textbooks for you
Algebra for College Students
Algebra for College Students
Algebra
ISBN:
9781285195780
Author:
Jerome E. Kaufmann, Karen L. Schwitters
Publisher:
Cengage Learning
Intermediate Algebra
Intermediate Algebra
Algebra
ISBN:
9780998625720
Author:
Lynn Marecek
Publisher:
OpenStax College
Intermediate Algebra
Intermediate Algebra
Algebra
ISBN:
9781285195728
Author:
Jerome E. Kaufmann, Karen L. Schwitters
Publisher:
Cengage Learning