A 3.5m wide basin at a water treatment plant discharges flow through a 2.5m long singly contracted weir with a height of 1.6m. If the discharge exiting the basin peaks at a depth of 0.95m above the crest, what is the peak flow rate (m3/s)? Assume cw = 1.82 and consider the velocity of approach.
A 3.5m wide basin at a water treatment plant discharges flow through a 2.5m long singly contracted weir with a height of 1.6m. If the discharge exiting the basin peaks at a depth of 0.95m above the crest, what is the peak flow rate (m3/s)? Assume cw = 1.82 and consider the velocity of approach.
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter16: Highway Drainage
Section: Chapter Questions
Problem 13P
Related questions
Question
A 3.5m wide basin at a water treatment plant discharges flow through a 2.5m long singly contracted weir with a height of 1.6m. If the discharge exiting the basin peaks at a depth of 0.95m above the crest, what is the peak flow rate (m3/s)? Assume cw = 1.82 and consider the velocity of approach.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning