2 20.00 STORAGE TANK 30.00 C TIIVI 13.00 100 300 FILL 300. 300 PLAN SCALE 1:300 1.00' 20.0원 143.001 300 12M ORIGINAL SURFACE FILL 110M 300 5M 300 SECTION SCALE 1:200 DRAWING No.Q STORAGE TANK A contract for an office building includes the provision of a storage tank. Drawing No Q₁ shows the plan and Section of the proposed storage Tank. Take off quantities for the following work Topsoil excauation b) Basement excavation Filling to basement excauation and replacement of topsoil around the structure Specifications 1 lapsoil to be excavated over the area of the structure for a width of 4m all around same and deposited 15m away for re use 2 Top soil to be excavated to a depth of 150mm 3 Excavate for basement including filling around the structure 4 and remove surplus soil from site Filling is to be of selected excavated material 5) Filling around the structure with topsoil 150mm depth NB use CES MM4

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter8: Landfills
Section: Chapter Questions
Problem 8.9P
icon
Related questions
Question
2
20.00
STORAGE TANK
30.00
C
TIIVI
13.00
100
300
FILL
300.
300
PLAN
SCALE 1:300
1.00'
20.0원
143.001
300
12M
ORIGINAL SURFACE
FILL
110M
300
5M
300
SECTION SCALE 1:200
DRAWING No.Q STORAGE TANK
Transcribed Image Text:2 20.00 STORAGE TANK 30.00 C TIIVI 13.00 100 300 FILL 300. 300 PLAN SCALE 1:300 1.00' 20.0원 143.001 300 12M ORIGINAL SURFACE FILL 110M 300 5M 300 SECTION SCALE 1:200 DRAWING No.Q STORAGE TANK
A
contract for an office building includes the provision
of a storage tank. Drawing No Q₁ shows the plan and
Section of the proposed storage Tank. Take off quantities for
the following work
Topsoil excauation
b) Basement excavation
Filling to basement excauation and replacement of topsoil around
the structure
Specifications
1 lapsoil to be excavated over the area of the structure
for a width of 4m all around same and deposited 15m away
for re use
2 Top soil to be
excavated to a
depth of
150mm
3 Excavate for basement including filling around the structure
4
and remove surplus soil from site
Filling
is to be of selected excavated material
5) Filling around the structure with topsoil 150mm depth
NB use CES MM4
Transcribed Image Text:A contract for an office building includes the provision of a storage tank. Drawing No Q₁ shows the plan and Section of the proposed storage Tank. Take off quantities for the following work Topsoil excauation b) Basement excavation Filling to basement excauation and replacement of topsoil around the structure Specifications 1 lapsoil to be excavated over the area of the structure for a width of 4m all around same and deposited 15m away for re use 2 Top soil to be excavated to a depth of 150mm 3 Excavate for basement including filling around the structure 4 and remove surplus soil from site Filling is to be of selected excavated material 5) Filling around the structure with topsoil 150mm depth NB use CES MM4
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,