A direct time study was taken on a manual work cycle using the snapback timing method. The regular work cycle consisted of three elements, identified as a, b, and c in the following table. Element d is an irregular element performed every 5 cycles. Observed times and performance ratings of the elements given. Determine the standard time for the work cycle using an allowance factor of 15%. Work Element a b 0.25min Observed Time 0.56min 0.50min 110% d 1.10min 100% Performance Rating 100% 80% Select one: a. None of the Above O b. 1.63 minutes O c. 1.53 minutes d. 1.95 minutes e. 1.76 minutes

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
A direct time study was taken on a manual
work cycle using the snapback timing
method. The regular work cycle consisted of
three elements, identified as a, b, and c in the
following table. Element d is an irregular
element performed every 5 cycles. Observed
times and performance ratings of the
elements given. Determine the standard time
for the work cycle using an allowance factor
of 15%.
Work Element
a
с
b
0.25min
Observed Time
0.50min
0.56min
100%
d
1.10min
100%
Performance Rating
80%
110%
Select one:
a. None of the Above
O b. 1.63 minutes
c. 1.53 minutes
O d. 1.95 minutes
e. 1.76 minutes
Transcribed Image Text:A direct time study was taken on a manual work cycle using the snapback timing method. The regular work cycle consisted of three elements, identified as a, b, and c in the following table. Element d is an irregular element performed every 5 cycles. Observed times and performance ratings of the elements given. Determine the standard time for the work cycle using an allowance factor of 15%. Work Element a с b 0.25min Observed Time 0.50min 0.56min 100% d 1.10min 100% Performance Rating 80% 110% Select one: a. None of the Above O b. 1.63 minutes c. 1.53 minutes O d. 1.95 minutes e. 1.76 minutes
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.