A factory manufactures two types of screws, A and B. Each type of screw requires theuse of two machines, an automatic and a hand operated. It takes 4 minutes on theautomatic and 6 minutes on hand operated machines to manufacture a package of screwsA, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines tomanufacture a package of screws B. Each machine is available for at the most 4 hours onany day. The manufacturer can sell a package of screws A at a profit of $7 and screwsB at a profit of $10. Assuming that he can sell all the screws he manufactures, howmany packages of each type should the factory owner produce in a day in order tomaximize his profit? Determine the maximum profit.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter8: Evolutionary Solver: An Alternative Optimization Procedure
Section: Chapter Questions
Problem 33P
icon
Related questions
Question

A factory manufactures two types of screws, A and B. Each type of screw requires theuse of two machines, an automatic and a hand operated. It takes 4 minutes on theautomatic and 6 minutes on hand operated machines to manufacture a package of screwsA, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines tomanufacture a package of screws B. Each machine is available for at the most 4 hours onany day. The manufacturer can sell a package of screws A at a profit of $7 and screwsB at a profit of $10. Assuming that he can sell all the screws he manufactures, howmany packages of each type should the factory owner produce in a day in order tomaximize his profit? Determine the maximum profit.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,