A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot, liquid silicon on a lake of molten tin. The liquid silicon spreads out evenly on the tin and then cools into glass. It is a process that must continue uninterrupted 24 hours a day, so adjustments to equipment and materials are ongoing. Assume that inspectors work eight-hour shifts, watching the glass ribbon as it flows from the lake of tin, marking and counting the number of defects on the new glass. The number of defects identified by the inspectors for one 24-hour period is shown below. Hour 1 3 4 6. 8. 9. 10 11 12 Defects 43 40 42 40 38 39 36 38 44 41 45 42 Hour 13 14 15 16 17 18 19 20 21 22 23 24 Defects 40 37 39 39 43 40 42 42 38 41 38 37 a. Create an x-bar process control chart with a UCL of 45 and an LCL of 35

Linear Algebra: A Modern Introduction
4th Edition
ISBN:9781285463247
Author:David Poole
Publisher:David Poole
Chapter2: Systems Of Linear Equations
Section2.4: Applications
Problem 27EQ
icon
Related questions
Question
Only do letter a please
2.
A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot, liquid silicon on a lake of molten tin. The liquid silicon spreads out evenly on
the tin and then cools into glass. It is a process that must continue uninterrupted 24 hours a day, so adjustments to equipment and materials are ongoing. Assume that
inspectors work eight-hour shifts, watching the glass ribbon as it flows from the lake of tin, marking and counting the number of defects on the new glass. The number of
defects identified by the inspectors for one 24-hour period is shown below.
Hour
1
2
3
4
8
10
11
12
Defects
43
40
42
40
38
39
36
38
44
41
45
42
Hour
13
14
15
16
17
18
19
20
21
22
23
24
Defects
40
37
39
39
43
40
42
42
38
41
38
37
a. Create an x-bar process control chart with a UCL of 45 and an LCL of 35
OHint (a):
b. What do you notice about the process control chart that might concern you as a quality control engineer?
S OHint (b):
US V
acer
%6
6
7
8
కోఆ
Transcribed Image Text:2. A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot, liquid silicon on a lake of molten tin. The liquid silicon spreads out evenly on the tin and then cools into glass. It is a process that must continue uninterrupted 24 hours a day, so adjustments to equipment and materials are ongoing. Assume that inspectors work eight-hour shifts, watching the glass ribbon as it flows from the lake of tin, marking and counting the number of defects on the new glass. The number of defects identified by the inspectors for one 24-hour period is shown below. Hour 1 2 3 4 8 10 11 12 Defects 43 40 42 40 38 39 36 38 44 41 45 42 Hour 13 14 15 16 17 18 19 20 21 22 23 24 Defects 40 37 39 39 43 40 42 42 38 41 38 37 a. Create an x-bar process control chart with a UCL of 45 and an LCL of 35 OHint (a): b. What do you notice about the process control chart that might concern you as a quality control engineer? S OHint (b): US V acer %6 6 7 8 కోఆ
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Recommended textbooks for you
Linear Algebra: A Modern Introduction
Linear Algebra: A Modern Introduction
Algebra
ISBN:
9781285463247
Author:
David Poole
Publisher:
Cengage Learning
Algebra for College Students
Algebra for College Students
Algebra
ISBN:
9781285195780
Author:
Jerome E. Kaufmann, Karen L. Schwitters
Publisher:
Cengage Learning
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
Intermediate Algebra
Intermediate Algebra
Algebra
ISBN:
9780998625720
Author:
Lynn Marecek
Publisher:
OpenStax College