A heavily reinforced retaining wall is to be constructed and you are asked to design a concrete mix following the ACI methodology. The concrete mix specifications are: o Characteristic compressive strength of 30 N/mm 2 at 28 days. o Failure rate of 1% o Previous control data yielded a standard deviation of 2 N/mm 2 o Air-entraining is required for extreme exposure o Minimum cement content 450 kg/m 3 o Required slump 160 mm o Maximum aggregate size 10 mm o Fineness modulus of aggregates is 2.90 o Dry rodded mass of coarse aggregates is 1650 kg/m 3 o Relative density of aggregates: 2.5 o Coarse aggregate has 3% moisture. o Fine aggregate has 4% moisture. o Volume of the required trial mix: 18 m 3  Following the ACI step-by-step process estimate the cement content of the mix, the total mix quantities required for this project and Using the ACI volumetric approach, provide the estimated mix quantities for the above specifications and comment on any differences between the mass approached followed in the steps. You do not have to do any moisture adjustments for this answer

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

A heavily reinforced retaining wall is to be constructed and you are asked to design a concrete mix
following the ACI methodology. The concrete mix specifications are:
o Characteristic compressive strength of 30 N/mm 2 at 28 days.
o Failure rate of 1%
o Previous control data yielded a standard deviation of 2 N/mm 2
o Air-entraining is required for extreme exposure
o Minimum cement content 450 kg/m 3
o Required slump 160 mm
o Maximum aggregate size 10 mm
o Fineness modulus of aggregates is 2.90
o Dry rodded mass of coarse aggregates is 1650 kg/m 3
o Relative density of aggregates: 2.5
o Coarse aggregate has 3% moisture.
o Fine aggregate has 4% moisture.
o Volume of the required trial mix: 18 m 3

 Following the ACI step-by-step process estimate the cement content of the mix, the total mix quantities required for this project and Using the ACI volumetric approach, provide the estimated mix quantities for the above specifications and comment on any differences between the mass approached followed in the steps. You do not have to do any moisture adjustments for this answer

Expert Solution
steps

Step by step

Solved in 7 steps with 2 images

Blurred answer
Knowledge Booster
Types of Concrete
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning