A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant II gives similar $10 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants, How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?

Linear Algebra: A Modern Introduction
4th Edition
ISBN:9781285463247
Author:David Poole
Publisher:David Poole
Chapter2: Systems Of Linear Equations
Section2.4: Applications
Problem 3EQ: A florist offers three sizes of flower arrangements containing roses, daisies, and chrysanthemums....
icon
Related questions
Question
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It
costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $10 rebates. The
manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?
How
many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints?
The number of engines to send to plant Lis
The number of engines to send to plant II is
www
Transcribed Image Text:A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $10 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost? How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints? The number of engines to send to plant Lis The number of engines to send to plant II is www
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps with 3 images

Blurred answer
Recommended textbooks for you
Linear Algebra: A Modern Introduction
Linear Algebra: A Modern Introduction
Algebra
ISBN:
9781285463247
Author:
David Poole
Publisher:
Cengage Learning
College Algebra (MindTap Course List)
College Algebra (MindTap Course List)
Algebra
ISBN:
9781305652231
Author:
R. David Gustafson, Jeff Hughes
Publisher:
Cengage Learning
Algebra: Structure And Method, Book 1
Algebra: Structure And Method, Book 1
Algebra
ISBN:
9780395977224
Author:
Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:
McDougal Littell