A permeability test was run on a soil sample with 8cm in radius and 10cm long. The level of water at point A and B from the datum is 18cm and 10cm, respectively. Determine the flow of water in cubic centimeter per hour that passes through the soil sample if the coefficient of permeability is 0.1383cm/sec. Point A Point B Soil Sample

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter6: Hydraulic Conductivity
Section: Chapter Questions
Problem 6.7P
icon
Related questions
Question
100%
Determine the flow of water in cubic centimeters. Asap 10 mins
A permeability test was run on a soil sample with 8cm in radius and 10cm long. The level of water at point A
and B from the datum is 18cm and 10cm, respectively. Determine the flow of water in cubic centimeter
per
hour that passes through the soil sample if the coefficient of permeability is 0.1383cm/sec.
Point A
Point B
Soil Sample
Transcribed Image Text:A permeability test was run on a soil sample with 8cm in radius and 10cm long. The level of water at point A and B from the datum is 18cm and 10cm, respectively. Determine the flow of water in cubic centimeter per hour that passes through the soil sample if the coefficient of permeability is 0.1383cm/sec. Point A Point B Soil Sample
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Storm sewers and detention
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning