A proposed concrete pavement has a general dimension of 10 cm thick, 3 m wide, and 10 m long. a. Determine the quantity of cement in bags (40kg), sand, and gravel in cubic meters required using a class “B” mixture. b. If it cost P259.00 per bag (40kg) of cement, P1,300.00/m3 of sand, and P1,500.00/m3 of gravel, what is the total cost?
A proposed concrete pavement has a general dimension of 10 cm thick, 3 m wide, and 10 m long. a. Determine the quantity of cement in bags (40kg), sand, and gravel in cubic meters required using a class “B” mixture. b. If it cost P259.00 per bag (40kg) of cement, P1,300.00/m3 of sand, and P1,500.00/m3 of gravel, what is the total cost?
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter21: Pavement Management
Section: Chapter Questions
Problem 4P
Related questions
Question
A proposed concrete pavement has a general dimension of 10 cm thick, 3 m wide, and 10 m long.
a. Determine the quantity of cement in bags (40kg), sand, and gravel in cubic meters required
using a class “B” mixture.
b. If it cost P259.00 per bag (40kg) of cement, P1,300.00/m3 of sand, and P1,500.00/m3 of gravel,
what is the total cost?
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning