A proposed embankment fill requires 3500 m' of compacted soil. The void ratio of the compacted fill is specified as 0.65. Four borrow pits are available, as described in the following table, which lists the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed construction site. Make the necessary calculations to select the

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 3RQ: What is the purpose of a soils report, and how can the information it contains assist the estimator?
icon
Related questions
Question
the excavated soil?
5.9
A proposed embankment fill requires 3500 m' of compacted soil. The
void ratio of the compacted fill is specified as 0.65. Four borrow pits are
available, as described in the following table, which lists the respective void
ratios of the soil and the cost per cubic meter for moving the soil to the
proposed construction site. Make the necessary calculations to select the
y not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
I materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
ction
from which the soil should be bought to minimize the cost. Assume G,
pe the same at all pits.
Borrow pit
Void ratio
Cost (S/m)
0.85
1.2
0.95
10
0.75
ABCD
Transcribed Image Text:the excavated soil? 5.9 A proposed embankment fill requires 3500 m' of compacted soil. The void ratio of the compacted fill is specified as 0.65. Four borrow pits are available, as described in the following table, which lists the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed construction site. Make the necessary calculations to select the y not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s). I materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it. ction from which the soil should be bought to minimize the cost. Assume G, pe the same at all pits. Borrow pit Void ratio Cost (S/m) 0.85 1.2 0.95 10 0.75 ABCD
Expert Solution
Step 1

Introduction-

The roadway, railway track, or canal is often elevated onto an embankment consisting of compaction (generally clay as well as rock-based) to prevent a variation in level necessitated by the topography, with the options being an unpleasant change in level or a diversion to follow a contour. When the land is initially higher than necessary, a cutting is utilised for the same reason.
Embankments are frequently built with material taken from a cutting. To offer enough stability to the formations and a long-term level covering with stability, embankments must be built with non-aerated & water resistant, compacted (or fully non-porous) material. The desert mixture is an illustration of a material for road construction purposes that is frequently used as a protective coating to safeguard underground utility wires and pipes.

trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,