A river bed consists of a layer of sand 8.25 m thick overlying impermeable rock; the depth of water is 2.50 m. A long cofferdam 5.50 m wide is formed by driving two lines of sheet piling to a depth of 6.00 m below the level of the river bed, and excavation to a depth of 2.00 m below bed level is carried out within the cofferdam. The water level within the cofferdam is kept at excavation level by pumping. If the flow of water into the cofferdam is 10.25 m'/h per unit length, a. Draw the flow net for the seepage flow -5.50m b. what is the coefficient of permeability of the sand? Sheet piling c. what is the hydraulic gradient immediately below the excavated surface? d. What is the lateral earth pressure at points A, B,. 2.50m Evi 2.00m vel Datum y=115 pcf =30° 6.00m 2.25m Natteale

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter11: Ground Improvement
Section: Chapter Questions
Problem 11.10CTP
icon
Related questions
Question

Geotechnical problem

A river bed consists of a layer of sand 8.25 m thick overlying impermeable rock; the depth of water is 2.50 m. A long cofferdam 5.50 m
wide is formed by driving two lines of sheet piling to a depth of 6.00 m below the level of the river bed, and excavation to a depth of
2.00 m below bed level is carried out within the cofferdam. The water level within the cofferdam is kept at excavation level by pumping. If
the flow of water into the cofferdam is 10.25 m/h per unit length,
a. Draw the flow net for the seepage flow
5.50m
b. what is the coefficient of permeability of the sand?
Sheet
piling
c. what is the hydraulic gradient immediately below the excavated surface?
d. What is the lateral earth pressure at points A, B, .
2.50m
Escavtin
2.00m
vel
Datum
y=115 pcf
p=30°
6.00m
2.25m
Transcribed Image Text:A river bed consists of a layer of sand 8.25 m thick overlying impermeable rock; the depth of water is 2.50 m. A long cofferdam 5.50 m wide is formed by driving two lines of sheet piling to a depth of 6.00 m below the level of the river bed, and excavation to a depth of 2.00 m below bed level is carried out within the cofferdam. The water level within the cofferdam is kept at excavation level by pumping. If the flow of water into the cofferdam is 10.25 m/h per unit length, a. Draw the flow net for the seepage flow 5.50m b. what is the coefficient of permeability of the sand? Sheet piling c. what is the hydraulic gradient immediately below the excavated surface? d. What is the lateral earth pressure at points A, B, . 2.50m Escavtin 2.00m vel Datum y=115 pcf p=30° 6.00m 2.25m
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Landfills
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning