A small assembly line for the assembly of power steering pumps needs to be balanced. Precedence diagram is shown below. 0.4 0.8 Station 1 What is the assembly-line efficiency? Round your answer to one decimal place The cycle time is determined to be 2.0 minutes. How would the line be balanced by choosing the assignable task having the longest task time first? Fill in the table below. If your answer is zer, enter "0". Round your answers to one decimal place. 2 3 Tasks RAC.O 0.8 EF GHI Total E 0.9 0.2 Total Time Idle Time
Q: 2. Consider the following project network, where the number over each node is the time required for…
A: To find: (a) The number of stages and states for each stage. (b) Use dynamic programming to solve…
Q: (a) A fruit grower has 150 acres of land available to raise two crops, A and B. It takes one day to…
A: To find: The number of acres of each fruit should be planted to maximize profit. Given: The amount…
Q: D. Explain the advantages of digital radiology in terms of: I. image quality ii. time saving iii.…
A: Advantages of Digital Radiology: Image Quality: Digital radiography systems provide improved…
Q: e. Compute the percent efficiency and percent idle time for the assignment in part d. Note: if the…
A: Project schedule helps in calculating different values related to the production cycle like the…
Q: The Global Treps Project need to have no less than five primary objectives. Using the SMART…
A: Milestones are important events in project planning. It mostly includes a few exercises. It is a…
Q: 1. Formulate the optimization model for this problem: define the decision variables, objective…
A: As per Bartleby guidelines, we can only solve the first three subparts of one question at a…
Q: (b) Two dietary drinks are used to supply protein and carbohydrates. The first drink provides 1 unit…
A: To find: The amount of drink athlete consumed to minimize the cost. Given: The athlete requires 3…
Q: A project to build a new bridge seems to be going very well since the project is well ahead of…
A: Given, First activity expected cost = $1418500 Second activity expected cost = $10498500 Third…
Q: a. What LP model is the best describe from the given problem? b. How many pairs of downhill skis…
A: Linear programming is one of the mathematical techniques that is widely used by companies. This…
Q: How do the two fields differ from one another? What are the similarities and differences between,…
A: Project management and software development are the two different fields that are related to each…
Q: The five modes of entry are exporting, licensing arrangements, partnering and strategic alliances,…
A: A green-field venture is said to be a kind of business investment in which a parent organization…
Q: What arguments does quality control make in favor of e-commerce-focused native Android and iOS apps?
A: Native applications for Android and iOS that are designed specifically for e-commerce can offer more…
Q: How do we arrive at the " Net Delivered Cost of Purchases?" What is an "allowance" and why would a…
A: "Net purchases" can be defined as the value of all purchases after deducting all costs. A sales…
Q: Explain the significant of Citations and the APA 7th Edition Style in academic writing
A: Meaning of Academic Writing. Academic writing implies a style of articulation that scientists use to…
Q: Project viability criteria must be compiled and discussed. Is there a determining factor? Why?
A: The determining factor for project viability criteria can vary depending on the project and its…
Q: On page 32, Alex and his team learn some things about robot efficiencies. Rogo notes, "To give the…
A: Given data: Capacity per hour=25 parts Cost per hour=$20
Q: How much is Z in the solution of this Assignment problem? A B 1 38 54 2 48 60 3 50 60 4 44 68
A: An assignment problem is a technique to find the combinations of the optimal solution to the…
Q: Mini-Case Study: The Back to School Crunch at Global Green Books Publishing Global Green Books…
A: SUMMARY OF THE CASE STUDY- Global Green Books ltd has an incredible new client, a local university…
Q: You've just completed a pilot run of 10 units of a major product and found the processing time for…
A: A learning rate illustrates how a process improves over time as a result of learning and growing…
Q: b) Describe the importance of quality and the importance of 4M man, machine materials and methods in…
A: Quality is a critical factor in the success of any product, including motor vehicles. It refers to…
Q: Learn the differences between functional, matrix, and project structures. Specify the effects of…
A: The three typical organizational structures that a business could employ are functional, matrix, and…
Q: Explain how you would go about fabricating a high-performing machine at a low cost
A: Maximizing quality while maintaining low cost is the principal objective of any product…
Q: What is the imortance of workplace training? What are the benefits and downfall of training…
A: Workplace training is important in light of multiple factors: Enhances Employee Skills: Workplace…
Q: The following tabulations are actual sales and forecasts for 6 months. What is ME (Mean Error) at…
A: To find: The Mean error at the end of the June. Formula used: The expression for the mean error is,…
Q: Describe the many ways in which putting an ERM plan into action will result in a rise in the amount…
A: The query focuses on Enterprise Risk Management (ERM) and how it could affect how well a business is…
Q: Kelle Carpet and Trim installs carpet in commercial offices. Peter Kelle has been very concerned…
A: Formulae used: To determine the expected Time duration : Te =(a+4m+b)6Where,a= Optimistic timem=…
Q: How crucial is it to include management-employee conflicts in your company's business plan's…
A: Your business's objectives, goals, processes, and timetable are all explained in great depth in the…
Q: George Kyparisis makes bowling balls in his Miami plant. With recent increases in his costs, he has…
A: Given that: Last year Now Cost per Input Unit Units Produced 1000 1000 Labor 300 275 12…
Q: The following table represents a plan for a project TIMES (DAYS) an b 23 4 1 2 3 45 12 34 11 13 5 3…
A: Forward Pass:Early Start (ES) = Max EF value from immediate Predecessor(s)Early Finish (EF)= ES +…
Q: What are the 3 main areas of Operations and Supply Chain Management?
A: Operations Management: This area of OSCM is concerned with the design, planning, and control of the…
Q: What is the feasibility range for constraint 1?
A: Linear programming is one of the mathematical techniques that is widely used by companies. This…
Q: Draw a network diagram showing the linkage between these activities from start to finish. For the…
A: A network diagram shows the sequence of the task that is done to complete a project. It usually…
Q: What are the 6 Strategic HR Issues in Global Assignments?
A: There are following six Strategic HR Issues in Global Assignments
Q: Are supply chain KPIs related to data-generating activities?
A: A company's supply chain activities are measured and evaluated using supply chain KPIs, or Key…
Q: A partial relative frequency distribution is given. Class A B C D (a) What is the relative frequency…
A: (a) Calculate relative frequency of class D Sample size = 400 Class Relative frequency A 0.22…
Q: How can CRM, ERP, and EAI help businesses?
A: Customers continued patronage is crucial to any company's ability to keep its profit margins stable…
Q: What is the crossover point in miles between the hybrid vehicle and the alternative vehicle from a…
A: For Hybrid vehicle, Purchase Cost = 18000 Operating Cost = Operating Cost per mile*No. of miles =…
Q: As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material…
A: Given Product structure-
Q: make an structured learning experience (SLE) activity that will have a learning experience outcome
A: Structured Learning Experience (SLE) Activity: Developing Effective Communication Skills Objective:…
Q: The five techniques for risk management should be identified and communicated concisely.
A: Risk management refers to the process of recognizing, evaluating, and managing potential risks that…
Q: Explain how the Spiral Model and the V Model work in managing the completion of projects.
A: From planning to testing and deployment, software development models offer a systematic method of…
Q: If factory workers are paid based on time and/or productivity, there is likely high inherent risk…
A: Accuracy = This is correct option because it has a highest risk of error and irregularities in the…
Q: You own a wheat warehouse with a capacity of 20 bushelsAt the beginning of month 1, you have 6…
A: Constraint formation: The constraint will be to sell only up to initial stock this means quantity…
Q: For small business startups, why should new entrepreneurs lease major equipment and premises instead…
A: New entrepreneurs should consider leasing major equipment and premises instead of purchasing them is…
Q: Learn the differences between functional, matrix, and project structures. Specify the effects of…
A: Functional Structure = It makes group of employee according to their respective functions including…
Q: Please calculate the Ls and Lf for K-A
A: A network diagram shows the sequence of the task that is done to complete a project. It usually…
Q: What is the relationship to strategic planning and quality management?
A: Strategic planning and the quality management are closely related in that they both focused on the…
Q: You are the owner of Orion Project Services Ltd (OPS). Your company has won the bid to execute a…
A: Customer relationship management (CRM) systems have developed into a crucial tool for managing…
Q: Determine the lot sizing technique that has the minimum cost given the following gross requirements…
A: Minimum cost solution is obtained by Economic Order Quantity method. Here six weeks data is given,…
Q: The management of a drinking water refill station is planning to estimate the average cost of paying…
A: Given data is Element Observations RF 1 2 3 4 1 0.24 0.32 0.26 0.22 1.2 2 0.18…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- Balance the assembly line shown below for (a) a shift output of 60 pieces and (b) a shift output of 40 pieces. Assume an 8-hour shift, and use the rule: choose the assignable task with the longest processing time. Compute the line efficiency for each case. Fill in the table below for a shift output of 60 pieces. Break ties by choosing the lowest task number. If your answer is zero, enter "0". Round your answers to the nearest whole number. Workstation Tasks Total Time Idle Time 1 2 3 4 Total What is the assembly-line efficiency? Round your answer to one decimal place. % Fill in the table below for a shift output of 40 pieces. Break ties by choosing the lowest task number. If your answer is zero, enter "0". Round your answers to the nearest whole number. Workstation Tasks Total Time Idle Time 1 2 3 Total What is the assembly-line efficiency? Round your answer to one decimal place. %An assembly line is to operate eight hours per day with a desired output of 250 units per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 50 — B 20 A C 25 A D 35 A E 60 B, C F 60 C, D G 50 E, F H 90 G What is the required workstation cycle time to meet the desired output rate? Note: Round your answer to the nearest whole number. Balance this line using the longest task time. Note: Leave no cells blank - be certain to enter "0" wherever required. What is the efficiency of your line balance, assuming it is running at the cycle time determined in part b? Note: Round your answer to 1 decimal place.An assembly line is to operate eight hours per day with a desired output of 240 units perday. The following table contains information on this product’s task times and precedencerelationships: Task Task Time (Seconds) Immediate Predecessor A 60 — B 80 A C 20 A D 50 A E 90…
- The desired daily output for an assembly line is 540 units. This assembly line will operate 720 minutes per day. The following table contains information on this product's task times and precedence relationships: TASK TASK TIME(SECONDS) IMMEDIATEPREDECESSOR A 35 — B 25 A C 35 A D 55 B E 5 B F 15 C G 30 E-D H 5 F-G b. What is the workstation cycle time? c. Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. (Leave no cells blank - be certain to enter "0" wherever required.)Francis Johnson’s plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only four workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TASK TIME (MINUTES) IMMEDIATE PREDECESSOR A 1 — B 2 — C 3 — D 1 A, B, C E 3 C F 2 E G 3 E What is the workstation cycle time required to produce 15 units per hour? Note: Round your answer to 1 decimal place. Balance the line to use the fewest possible workstations to meet the cycle time found in part (b). Use whatever method you feel is appropriate. What is the efficiency of your line balance, assuming the line operates at the cycle time from part (b)? Note: Round your answer to 1 decimal place.The desired daily output for an assembly line is 360 units. This assembly line will operate 450 minutes per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 30 — B 35 A C 30 A D 35 B E 15 C F 65 C G 40 E, F H 25 D, G What is the required workstation cycle time to meet the desired output rate? Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. Note: Leave no cells blank - be certain to enter "0" wherever required.
- The following tasks are to be performed on an assembly line: TASK SECONDS TASKS THAT MUST PRECEDE A 20 — B 7 A C 20 B D 22 B E 15 C F 10 D G 16 E, F H 8 G The workday is seven hours long. The demand for completed product is 750 per day. Find the cycle time required to meet the desired output rate. Note: Round your answer to 1 decimal place. What is the theoretical number of workstations required to meet the desired output rate? Note: Round up your answer to the next whole number. Balance the line using sequential restrictions and the longest-operating-time rule. Determine the task under each workstation and the idle time for each such task. Note: Round your answers to 1 decimal place. What is the efficiency of the line balanced as in part (d) assuming it is running at the cycle time determined in part (a)? Note: Round your answer to 1 decimal place. Suppose that demand rose from 750 to 800 units per day. Determine the cycle time. (Use the…Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: A B C D A − 4 10 8 B − − 5 9 C − − − 9 D − − − − Workpieces moved per week between work areas are: A B C D A − 900 700 600 B − − 400 300 C − − − 600 D − − − − It costs Gordon $3 to move 1 work piece 1 foot. The weekly total material handling cost of the layout =....... $nothing (enter your response as a whole number). The weekly total material handling cost of the layout =....... nothing dollars (enter your response as a whole number).An assembly plant for the Blood Pressure RX, a portable blood pressure device, has 400 minutes available daily in the plant for the device, and the average demand is 80 units per day. Final assembly requires 6 separate tasks. Information concerning these tasks is given in the following table. Task Performance Time (minutes) Task Must Follow Task Listed Below A 4 - B 1 - C 1 A, B D 3 C E 4 D F 2 E b) Given the demand, what is the cycle time for this operation? The cycle time for this operation is enter your response here minutes/unit (enter your response as a whole number). c) What is the theoretical minimum number of workstations? The theoretical minimum number of workstations is enter your response here stations (enter your response as a whole number and, if your unrounded answer includes decimal values,…
- The desired daily ouput for an assembly line is 420 units. This assembly line will operate 595 minutes per day. The following table contains information on the products task times and precedence relationships Task. Task time-seconds Immediate predecessor A. 35 - B. 40 A C 30 A D 40 B E 20 C F 70 C G 45 E-F H 30 D-G The required workstation cycle time to meet the desired output time is 85 seconds Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion The answer gives only 4 workstations as option Have to fill out following Workstation. Task Idle time 1 ?? ?? 2 ?? ?? 3…Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below. A B C D − 480 500 50 350 − 175 0 0 0 − 750 0 0 0 − Figure 2. Existing Layout A B C D |——30'——|——30'——|——30'——| Part 2 a) For the existing layout, the cumulative "load×distance" or "movement cost"=enter your response here feet (enter your response as a whole number).An assembly line with 17 tasks is to be balanced. The longest task is 2.2 minutes and the total time for all tasks is 19 minutes. The line will operate for 460 minutes per day. A) What is the minimum number of workstations needed if the output rate is to be 186 units per day? B)- What cycle time will provide an output rate of 142 units per day? C) What output will result if the cycle time is (I) 9 minutes and (II) 14 minutes?