A surface water treatment plant operates round the clock with a flaw rate of 35 m3/min. The water temperature is 15°C and Jar testing indicated and alum dosage of 25 mg/l with flocculation at a Gt value of 4 x 104 producing optimal results. The alum quantity required for 30 days (in kg) of operation of the plant is

Aquaculture Science
3rd Edition
ISBN:9781133558347
Author:Parker
Publisher:Parker
Chapter12: Water Requirements For Aquaculture
Section: Chapter Questions
Problem 27SA
icon
Related questions
Question
A surface water treatment plant operates round the clock with a flaw rate of 35 m3/min.
The water temperature is 15°C and Jar testing indicated and alum dosage of 25 mg/l with
flocculation at a Gt value of 4 x 104 producing optimal results. The alum quantity required
for 30 days (in kg) of operation of the plant is
Transcribed Image Text:A surface water treatment plant operates round the clock with a flaw rate of 35 m3/min. The water temperature is 15°C and Jar testing indicated and alum dosage of 25 mg/l with flocculation at a Gt value of 4 x 104 producing optimal results. The alum quantity required for 30 days (in kg) of operation of the plant is
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Aquaculture Science
Aquaculture Science
Biology
ISBN:
9781133558347
Author:
Parker
Publisher:
Cengage
Biomedical Instrumentation Systems
Biomedical Instrumentation Systems
Chemistry
ISBN:
9781133478294
Author:
Chatterjee
Publisher:
Cengage