A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table Observations (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 90% 0.49 0.54 0.44 0.44 0.44 0.44 2 85 1.49 1.49 1.44 1.44 1.44 1.49 3 110 0.84 0.84 0.74 0.79 0.84 0.79 4 95 1.09 1.14 1.09 1.14 1.14 1.19 a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) Element Average cycle 1 ________ 2 ________ 3 ________ 4 __________ b. Find the normal time for each element. (Round your answers to 3 decimal places.) Element Normal Time 1 ____________ 2 ___________ 3 _______________ 4 _______________ c. Assuming an allowance factor of 19 percent of job time, compute the standard time for this job. Element Standard Time 1 ___________ 2 ______________ 3 ______________ 4 ________________
A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table
Observations (minutes per cycle)
Element Performance Rating 1 2 3 4 5 6
1 90% 0.49 0.54 0.44 0.44 0.44 0.44
2 85 1.49 1.49 1.44 1.44 1.44 1.49
3 110 0.84 0.84 0.74 0.79 0.84 0.79
4 95 1.09 1.14 1.09 1.14 1.14 1.19
a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.)
Element Average cycle
1 ________
2 ________
3 ________
4 __________
b. Find the normal time for each element. (Round your answers to 3 decimal places.)
Element Normal Time
1 ____________
2 ___________
3 _______________
4 _______________
c. Assuming an allowance factor of 19 percent of job time, compute the standard time for this job.
Element Standard Time
1 ___________
2 ______________
3 ______________
4 ________________