After routing cable from an existing device box through a wall and pulling the cable into a new box, your next step is to A. replace the existing receptacle with a higher-capacity device. B. apply power to the circuit. C. strip and connect the wires to the existing receptacle. D. tighten the internal cable clamps in the new box.

EBK ELECTRICAL WIRING RESIDENTIAL
19th Edition
ISBN:9781337516549
Author:Simmons
Publisher:Simmons
Chapter12: Lighting Branch Circuit And Small-appliance Circuits For The Kitchen
Section: Chapter Questions
Problem 19R: a. The Code requires a minimum of two small-appliance circuits in a kitchen. Is it permitted to...
icon
Related questions
Question
100%

20. After routing cable from an existing device box through a wall and pulling the cable into a new box, your next step is to

A. replace the existing receptacle with a higher-capacity device.

B. apply power to the circuit.

C. strip and connect the wires to the existing receptacle.

D. tighten the internal cable clamps in the new box. 

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Latches and Flip-Flops
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
EBK ELECTRICAL WIRING RESIDENTIAL
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:
9781337516549
Author:
Simmons
Publisher:
CENGAGE LEARNING - CONSIGNMENT
Electricity for Refrigeration, Heating, and Air C…
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning