An excavation company has been contracted to supply 10 million cubic feet (cu. ft.) of dirt to a construction site. The company uses a bulldozer to collect dirt, which is then moved by a dump truck to the construction site. It costs the company $100 per hour to use the bulldozer, and it rents dump trucks at a rate of $40 per hour per truck. Each dump truck can hold 1,000 cu. ft. of dirt, and it takes an average of 12 minutes for the bulldozer to load a dump truck with dirt. It takes an average of five minutes for a fully loaded dump truck to deliver the dirt to the construction site and returns to the bulldozer for another load. Assume that the time to load a dump truck and the time for a dump truck to deliver the dirt to the construction site and return to the bulldozer follow exponential distributions. Moreover, a usual trip of the truck involves load with dirt, deliver the dirt, return to the bulldozer where it joins a queue for another load of dirt. Then, determine the most appropriate queuing model for the dirt-moving process and then use that model to determine how many dump trucks to rent in order to minimize the expected cost of fulfilling the contract.

Elementary Geometry For College Students, 7e
7th Edition
ISBN:9781337614085
Author:Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:Alexander, Daniel C.; Koeberlein, Geralyn M.
Chapter9: Surfaces And Solids
Section9.1: Prisms, Area And Volume
Problem 37E: Zaidah plans a raised flower bed 2 ft high by 12 ft wide by 15 ft long. The mulch, soil, and peat...
icon
Related questions
Question

An excavation company has been contracted to supply 10 million cubic feet (cu. ft.) of dirt
to a construction site. The company uses a bulldozer to collect dirt, which is then moved by a
dump truck to the construction site. It costs the company $100 per hour to use the bulldozer,
and it rents dump trucks at a rate of $40 per hour per truck. Each dump truck can hold 1,000
cu. ft. of dirt, and it takes an average of 12 minutes for the bulldozer to load a dump truck
with dirt. It takes an average of five minutes for a fully loaded dump truck to deliver the dirt
to the construction site and returns to the bulldozer for another load.
Assume that the time to load a dump truck and the time for a dump truck to deliver the dirt
to the construction site and return to the bulldozer follow exponential distributions. Moreover,
a usual trip of the truck involves load with dirt, deliver the dirt, return to the bulldozer where
it joins a queue for another load of dirt.
Then, determine the most appropriate queuing model for the dirt-moving process and then
use that model to determine how many dump trucks to rent in order to minimize the expected
cost of fulfilling the contract.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
Elementary Geometry For College Students, 7e
Elementary Geometry For College Students, 7e
Geometry
ISBN:
9781337614085
Author:
Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:
Cengage,
Algebra: Structure And Method, Book 1
Algebra: Structure And Method, Book 1
Algebra
ISBN:
9780395977224
Author:
Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:
McDougal Littell
Elementary Geometry for College Students
Elementary Geometry for College Students
Geometry
ISBN:
9781285195698
Author:
Daniel C. Alexander, Geralyn M. Koeberlein
Publisher:
Cengage Learning