Baby World Inc. has 31 operators and work 7 hours a day, 5 days a week. They specialize in making organic cotton baby onesies. The standard minute value to finish one onesie = 10 minutes. Assume that their actual capacity = max capacity. They just received an order for 6300 of these onesies. How many days will it take to complete this order? Round your answer to the nearest whole number, but do not round until your final answer. Group of answer choices 5 days 6 days 7 days 4 days
Q: A Managment instutute can operate for a maxium 12 hours .lectures are the outout of the institute…
A: Production function means the output that can be achieved with particular determined set of inputs.…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: The concept used here is cycle times and bottleneck resource identification.
Q: In a service process such as the checkout counter in a discount store, a good target for capacity…
A: Answer given below:
Q: A company makes two products X and Y, using a single resource pool. The resource is available for 8…
A: Availability of resources for production of X and Y = 8 hrs. (480 minutes) Unit load of X = 15…
Q: The Academic Computing Center has five trainers available in its computer labs to provide training…
A: Efficiency refers to the working capacity of an input. It is a measure that helps in determining the…
Q: The school cafeteria can make pizza for approximately $0.30 per slice. The cost of the kitchen use…
A: school cafeteria can make pizza for approximately $0.30 per slice. cost of the kitchen use and…
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For…
A: Given data: Average number of customer per day = 70 Current utilization rate = 65% Demand is…
Q: The staff training centre at a large regional hospital provides training sessions in CPR to all…
A: Given Information: The design capacity of the training system = 2100 employees per year Effective…
Q: What cycle time would match capacity and demand if demand is 120 units a day, there are twoshifts of…
A:
Q: production
A: Capacity planning is a method through which the ability of an organization is evaluated in order to…
Q: Under ideal conditions, a service bay at a Fast Lube can serve 7 cars per hour The effective…
A: Production is the process of developing finished products using the raw resources and materials for…
Q: Money Laundry has 22 washers and 34 dryers. All orders are first sent to wash and then to dry. It…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three subparts…
Q: capacity is determined by the amount of raw materials available. True or False?
A: Capacity refers to the total number of units a firm is able to produce during a given period of time…
Q: When the units of demand are at its peak, the capacity will exceed the demand. * O False O True
A: Excess capacity is a situation where the demand for a product is less as compared to the amount of…
Q: An airline company must plan its fleet capacity and its longterm schedule of aircraft usage. For one…
A: Formula:
Q: Under ideal conditions, a service bay at a Fast Lube can serve 6 cars per hour. The effective…
A: Due to regulations that include quality issues, delays, as well as handling of materials, an…
Q: Knott’s Industries manufactures standard and super premium backyard swing sets. Currently it has…
A: Gross machine available time = 4 machines x 8 hours/ day x 250 days/ year Gross machine available…
Q: A company makes two products X and Y, using a single resource pool. The resource is available for 8…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: Compute the takt time for a system where the total time per shift is 420 minutes, there is one…
A: The answer is as below:
Q: A toy firm produces drums sequentially on three machines—A, B, and C—with cycle times of 3, 4, and 6…
A: SOLUTION: A) Optimum efficiency r= p/s WHERE, p - actual output s - standard output Supposing the…
Q: capacity is determined by the number of machine used? True or False?
A: Capacity refers to the total number of units a firm is able to produce during a given period of time…
Q: The school cafeteria can make pizza for approximately $0.30 per slice. The cost of the kitchen use…
A: Pizza's rate = $9 No. Of slices = 8 Per slice rate = 9/8 = $ 1.125 However the fixed cost per day is…
Q: In an 11-week period, a work center produces 1000 standard hours of work. What is the measured…
A: Measured Capacity The term measured capacity is used to determine the actual capabilities of the…
Q: Under ideal conditions, a service bay at a Fast Lube can serve 8 cars per hour. The effective…
A: Given data; Effective capacity 5.5 cars Efficiency 0.9 Servicing cars 200 cars…
Q: If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily…
A: Bottleneck cycle time is the longest time in the entire process. In the given question there are two…
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 0.33 loans…
A: In the above question the following information is given: First resource capacity is 0.33. Second…
Q: Effective capacity is:a) the capacity a firm expects to achieve, given the currentoperating…
A: Introduction: Effective capacity can be defined as the maximum amount of work that can be done by an…
Q: Capacity cushion is to segment larger operations into smaller operating units with focused…
A: The capacity cushion is that the amount of spare capacity a business has expressed as a percentage…
Q: An average of 50 customers a day are currently served through a method. Observations made in recent…
A: Queuing theory is a mathematical model that determines the capacity of a system based on customer…
Q: Under ideal conditions, a picture frame manufacturing facility can produce 480 frames per day. Under…
A: Given data Under the ideal scenario, a firm manufactures 480 frames in a day Under a normal…
Q: Capacity computations a. St. Patrick's Mercy Care Center has 100 beds, but has an effective capacity…
A: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: A work cell at Chris Ellis Commercial Laundryhas a workstation with two machines, and each unit…
A: Given Number of machines = 2 Production capacity of machine = 4 units/hour.
Q: Calculate Capacity utilization whereas: Design Capacity…
A: The term "utilisation" can be defined as the ratio of actual output to capacity.
Q: Knot's Industries manufactures standard and super premium backyard swing sets. Currently it has four…
A: Operating days(N) = 300 days Hour(H) = 8 Capacity(C) = 25% Number of machine(M) = 4 Number of hour…
Q: Party Apparel Inc. has 20 operators and work 8 hours a day, 5 days a week. They specialize in making…
A: Answer = 5
Q: The number of workstations that will be needed is a function of both the desired output rate and our…
A: It is rightly said that the number of workstations that will be needed is a function of both the…
Q: The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each…
A: The capacity of the process is determined by the capacity of the bottleneck worker. In this case,…
Q: RideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods…
A: “Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: A plant runs in two shifts, one shift of 8 hours and during each shift there is 2 hours of planned…
A: efficiency is the ratio of output to the input
Q: FOR THIS QUESTION, WOULD STORAGE TIME BE INCLUDED IN THE SUM FOR THROUGHPUT TIME? ALSO COULD YOU…
A: For the above question throughout put time is calculated as below:
Q: Chase capacity strategy is a reactive strategy in which a company tries to alter its capacity using…
A: Capacity planning includes the company's computer network, storage, workforce maintenance, and…
Q: Ken estimates a startup cost of $2,000 for his hot dog store. His monthly fixed costs are $200, and…
A: The question is related to determination of Profit/loss for six months.
Q: A company operates 8 hours per shift, two shifts per day, five days a week with 12 hours maintenance…
A: Operating hour(h) = 8 Number of per day shift(s) = 2 Days per week (d) = 5 Maintenance hour(M) = 12…
Q: The process of establishing the output rate that can be achieved at a facility is capacity planning.…
A: Limit planning is the way toward deciding the production capacity needed by an association to…
Q: Determine the utilization and the efficiency for each of these situations: a. A loan processing…
A: Utilization and Efficiency are calculated by the following formula. Ans 1: Given data, Actual…
Q: At Susie's Dress Manufacturing, the company's garment production lines produces 600 dresses in a…
A: There is really a limit to how much can be produced in a given day and in industrial and…
Baby World Inc. has 31 operators and work 7 hours a day, 5 days a week. They specialize in making organic cotton baby onesies. The standard minute value to finish one onesie = 10 minutes. Assume that their actual capacity = max capacity.
They just received an order for 6300 of these onesies. How many days will it take to complete this order?
Round your answer to the nearest whole number, but do not round until your final answer.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Party Apparel Inc. has 20 operators and work 8 hours a day, 5 days a week. They specialize in making formal party attire. The standard minute value to finish one of their lace formal gowns = 48 minutes. Assume that their actual capacity = max capacity. They just received an order for 1000 of these lace gowns. How many days will it take to complete this order? Round your answer to the nearest whole number, but do not round until your final answer. Group of answer choices 5 7 9 3Under ideal conditions, a picture frame manufacturing facility can produce 480 frames per day. Under normal conditions, the company schedules 434 frames per day. If the production manager sets the output rate to 382 frames per day, what is the resulting capacity cushion?Suppose a chef ices and decorates cupcakes in batches of 100. Each batch requires 30 minutes to setup the equipment, and each cupcake in the batch takes 2 minutes to process. What is the throughput capacity (in cupcakes and/or minutes)? Pick the closest answer. Group of answer choices a .5 b 1 c 1.5 d 2 e 2.5 f 3
- A business company has the following capacity per month based on the following: 30 working days per month; 1 shift operation at 8 hours per shift; 30 minutes break per shift per employee ABC company produces bicycles and has the following Capacities per process. Frame Welding: 60 bikes per hour per machine Painting: 20 bikes per hour per worker Assembly: 50 bikes per hour per worker Inspection: 100 bikes per hour per worker What can be observed from the system if the demand for the month is 5,000 bikes?In order to produce 1000 units of X in a week? units X is scheduled weekly for Operation B (due to 5% scrap ratio)? units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000units of X per week.? The total time required to perform Operation B = ? minutes per week? The total time required to perform Operation A = ? minutes per weekH= Available Time in a week = minutes /weekThusFA = ?FB = ?Since both of the operations A and B are performed on the same machine? machines are requiredA company makes two products X and Y, using a single resource pool. The resource is available for 8 hours a day. The unit loads for X and Y are 15 and 30 minutes per unit, respectively. If the company decides to produce X only, calculate the hourly, and the daily capacity. Repeat the hourly and daily capacity calculation for product Y only, similarly (meaning that if this company was about to only produce Y, how many units per hour and per day it could produce? The company wishes to produce both products, but not at equal portions. 60% X’s and 40% Y’s is desired for production. At the indicated percentages, what is the daily capacity of this company? Hint 1: find the weighted unit load based on the given portions and apply that in the effective capacity formula. Hint 2: It will be a mistake to allocate 60% of the available time to produce X. Rather, apply hint 1 to make sure the resulting production will be 60% from X units and 40% from Y’s.
- An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For one flight segment, the average number of customers per day is 70, which represents a 65 percent utilization rate of the equipment assigned to the flight segment. If demand is expected to increase to 80 customers for this flight segment in three years, what capacity requirement should be planned? Assume that management deems that a capacity cushion of 20 percent is appropriate. what the needed capacity requirement is ----------- customers per day. (Enter your response rounded up to the next whole number.)An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For one flight segment, the average number of customers per day is 70, which represents a 65 percent utilization rate of the equipment assigned to the flight segment. If demand is expected to increase to 80 customers for this flight segment in three years, what capacity requirement should be planned? Assume that management deems that a capacity cushion of 15 percent is appropriate. The needed capacity requirement is enter your response here customers per day. (Enter your response rounded up to the next whole number.)A company makes two products X and Y, using a single resource pool. The resource is available for 8 hours a day. The unit loads for X and Y are 15 and 30 minutes per unit, respectively. If the company decide to produce X only, calculate the hourly, and the daily capacity. Repeat the hourly and daily capacity calculation for product Y only, similarly (meaning that if this company was about to only produce Y, how many units per hour and per day it could produce?) The company wishes to produce both products, but not at equal portions. 60% X’s and 40% Y’s is desired for production. At the indicated percentages, what is the daily capacity of this company? Hint 1: find the weighted unit load based on the given portions and apply that in the effective capacity formula. Hint 2: It will be a mistake to allocate 60% of the available time to produce X. Rather, apply hint 1 to make sure the resulting production will be 60% from X units and 40% from Y’s.
- In order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are requiredThe first station can process a unit in 10 minutes First Station capacity = 60/10 = 6 units per hour As the second station has 2 identical machines in parallel, each of which can process a unit in 12 minutes. Each unit needs to be processed on one of the two machines. Second Station Capacity = 60 x 2/12 = 10 units per hour The third station can process a unit in 8 minutes Third Station capacity = 60/8 = 7.5 units per hour What is the hourly capacity of this production line?A train company runs trains every 15 minutes, however during peak time, they run at every 7.5minutes. Is this an example of capacity leading or lagging?