Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (OPE) 200,000 200,000 Annual contracted units Annual fixed cost Per unit variable cost $125,000 $16.00 $200,000 $14.00 If the contract for the second and third years is pending, for demand below 37,500 units, option FMS is the best alternative for Luis is the best alternative for Luis. For demand above 280,000 units, option Flexible Manufacturing System (FMS) Dedicated Machine (DM) 200,000 $480,000 $13.00
Q: What is the difference between an Inspection / Formal Review / Walkthrough?
A: Walkthrough is a type of companion review in which a developer drives the review cycle and the other…
Q: A definition for the abbreviation "FMS option" would be appreciated.
A: The abbreviation "FMS option" can have different meanings depending on the context in which it is…
Q: Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An…
A: Formulae used: Dollar Volume=Annual Demand × Cost per unit % of total Dollar Volume=Item Dollar…
Q: Table 6-2. Time Actual Period Sales 1 230 238 260 275 300 285 270 290 305 320 335 2 3 4 5 6789 10 11…
A: Find the given details below: Time Period Actual Sales (y) 1 230 2 238 3 260 4 275 5…
Q: Level of success in the management of the triple constraints of time, cost, and scope
A: The triple constraint of project management can be defined as a triangle which gives you the thought…
Q: Heather Adams, production manager for a Colorado exercise equipment manufacturer, needs to…
A: Item Lead Time On-Hand Inventory Components Stepper 2 20 A2, B2, C2 A 1 10 D1, F2 B 2 20 E2,…
Q: Companies nowadays are taking into account concerns about the environment and the benefits of…
A: When considering outsourcing MagicBands versus other options, there are several benefits to…
Q: AABCDE ZABCD Activity Predecessor None FGHI-KL EOFICIN Н J к с H с H J,I,K Draft PDS Identify team…
A: As per the given data, create the Network Diagram.
Q: What is Supplier relationship management with practical examples?
A: Supplier Relationship Management Supplier Relationship Management (SRM) is a strategic approach…
Q: Suppose the production manager is asked to reduce the safety stock of this item by 60 percent. If…
A: In inventory management, the term "safety stock" refers to the additional inventory that a business…
Q: After listening to the video on Leadership and Change Management, consider your readings across the…
A: Leadership is an interaction by which a chief can direct, guide and impact the way of behaving and…
Q: Why organization should explain to employees and publics when the organization is doing about a…
A: When an organization is facing a crisis, it is important to communicate transparently with both…
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For…
A: Given data Average number of customers per day = 70 Utilization rate of the equipment assigned =…
Q: 5. For the below scenario: a) Identify the single factor (labour) productivity ratios (per employee)…
A: productivity = output/input labor productivity = output/labor hours multifactor productivity =…
Q: Justify the need for a skilled project manager on challenging projects.
A: A skilled project manager is essential for managing challenging projects because of multiple…
Q: Learning Organization What is a "learning organization" and what kinds of organization strategies…
A: A learning organization is an organization that prioritizes continuous learning and development at…
Q: How do transaction processing, customer relationship management, and supply chain management systems…
A: A project management life cycle is a process with different stages like initiating, planning,…
Q: When should the CAE report to the management if the preliminary risk assessment finds control…
A: Preliminary risk assessment is a process of identifying potential risks and assessing their…
Q: 5 project management issues faced in executing, monitoring, and controlling when rebuilding the…
A: A significant development project involving replacing an old seawall along Seattle's waterfront is…
Q: Ray's Satellite Emporium wishes to determine the best order size for its best-selling satellite dish…
A: It's crucial to place orders in the quantities that most closely match your requirements for any…
Q: How much time would you expect a customer to wait in line, pay with a debit card, and leave?
A: Given that the arrival rate is 300 per hour and the service rate to verify the debit card is to be…
Q: The table above provides the aggregate plan of production by a firm. It is known that the firm uses…
A: Stockout is a situation when the inventory stock of a company is less than the demand for the…
Q: KFC need to determine weather they should set up a new location. Develop a mini proposal. Providing…
A: This proposal outlines the factors to consider while determining whether to set up another location…
Q: Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The…
A: Annual demand(D) = 45,360 Daily demand(d) = 168 Holding cost(H) = $12 Daily production rate(p) = 960…
Q: What hinders m-commerce? How to beat them?
A: The mobile commerce revolution has changed the game for how businesses interact with and sell to…
Q: Could you briefly discuss any two quality regulatory process results to increase project quality
A: As per the Q, I would describe two quality regulatory processes along with expected benefits or…
Q: A supplier of instrument gauge clusters uses a Kanban system to control material flow. The gauge…
A: Demand (D) = 18 gauges per hour Lead Time (L) = 2 hours Safety Stock (S) = 35% Container Size (C) =…
Q: 28 please help me all info is there Owners of a local restaurant are concerned about their ability…
A: To be determined: Service capacity to increase to stay out of critical zone Introduction: The term…
Q: Here are the data for the past 21 months for actual sales of a particular product: January February…
A: Most Recent Quarter = 0.50 Second most recent Quarter = 0.25 Third most recent Quarter = 0.25
Q: atients walk in to a doctor’s office every 63 minutes with a standard deviation of 32 minutes on the…
A: To find: The average time spends by patient in doctor office. Given: The patient arrival time to…
Q: Design specifications require that a key dimension on a product measure 106 ‡ 11 units. A process…
A: Process capability is characterized as a factual proportion of the innate process changeability of a…
Q: Milford Lumber Company ships construction materials from three wood-processing plants to three…
A: Min 5.5 X11 + 3.3 X12 + 1.2 X13 + 5.8 X21 + 2.4 X22 + 2.5 X23 + 2.9 X31 + 1.7 X32 + 4.6 X33…
Q: a. Perform a regression analysis based on these data using Excel. Note: Negative values should be…
A: A strong statistical technique that enables you to analyze the connection between two or more…
Q: The product development group at Landon Corporation has been working on a new computer software…
A: Formulas used- For Expected time and variance-Expected time = (a+4m+b)6Variance =b-a62 For Project…
Q: The table below provides the aggregate plan of messanger bags produced by Timbuk2. It is known that…
A: Given aggregate plan-
Q: Gibson Appliances wants to establish an assembly line to manufacture its new product, the Micro…
A: To find: The theoretical minimum number of workstations. Given: Activity Duration Immediate…
Q: Suppose a coffee shop order and fulfillment process is configured simply as a single queue with two…
A: EXPLANATION : To see why, we can use Little's Law, which states that the average number of customers…
Q: In some cases, companies want to design supply chain networks in which a market is supplied from…
A: This is a case of transportation wherein we need to decide which of the plausible warehouses can be…
Q: U.S. Airfilter has hired you as a supply chain consultant. The company makes air filters for…
A: Given-
Q: These answers are incorrect.
A: Objective Function: Minimum no. of police officers = Min X1+X2+X3+X4+X5+X6 Constraints: Subject to−…
Q: SunOil, the vice president of supply chain, decides to view the worldwide demand in terms of five…
A: This is a case of transportation whereing we need to decide which of the plausible warehouses can be…
Q: Is "risk management" different from "risk assessment?"
A: To explain: Whether the risk management is different from risk assessment. Concept used: Risk…
Q: In the past, Alpha Corporation has not performed incoming quality control inspections but has taken…
A: Given- Acceptable Quality Level, (AQL) = 13% = 0.13Lot Tolerance Percent Defective (LTPD) = 38% =…
Q: Home-Style Cookies wants to evaluate the potential profitability of the new retail shop. Fixed costs…
A: Breakeven = Fixed cost / (selling price per unit - Variable cost per unit) Revennue = Units sold X…
Q: Organizations can gain a competitive advantage simply by selling products and services at a lower…
A: A corporation has a competitive edge if it can make or provide its products or services more…
Q: What exactly are Project Scheduling Models, and how do we describe them exactly?
A: To Explain: The project scheduling models. Concept used: Project scheduling models. A project…
Q: b. What would the utilization of the bed capacity become if the new beds were added and the hospital…
A: Given bed occupancy plan-
Q: Identify at least four (4) critical issues that the project management team faced in executing,…
A: 39 condos make up the Grand Cayman residential development project known as AURA. The project…
Q: AlwaysRain Irrigation, Incorporated would like to determine capacity requirements for the next four…
A: Given data: For Plastic sprinklersMachine available = 1Capacity to produce sprinklers =280,000No.…
Q: Note: Enter your answer in dollars, not in millions. Round your answer to the nearest whole dollar…
A: Payoff is paid for satisfying the condition of the amount of the mortgage loan. It is used for full…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Borges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 225,000 225,000 225,000 Annual fixed cost $100,000 $225,000 $480,000 Per unit variable cost $16.00 $14.00 $13.00 Part 2 The option GPE is best when the contracted volume is below…Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $250,000 $500,000 Per unit variable cost $18.00 $14.00 $13.00 If the contract for the second and third years is pending, for…Borges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM)Annual contracted units 225,000 225,000 225,000 Annual fixed cost $125,000 $250,000 $480,000 Per unit variable cost $18.00 $14.00 $13.00 a.The option GPE is best when the contracted volume is below ------ units (enter your response as a whole number).…
- Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $200,000 $525,000 Per unit variable cost $16.00 $14.00 $13.00 The option GPE is best when the contracted volume is below…Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 75,000 75,000 75,000 Annual fixed cost $150,000 $250,000 $500,000 Per unit variable cost $16.00 $14.75 $13.00 Part 2 Based on the total cost, the process that is best suited for…Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 75,000 75,000 75,000 Annual fixed cost $100,000 $200,000 $525,000 Per unit variable cost $15.00 $14.00 $13.75 Part 2 Based on the total cost, the process that is best suited for…
- Break-even analysis is an important tool for managing any business, including colleges and universities. Identify 3 areas where break-even analysis might be used at a university. For each area, identify the revenues, fixed costs, and variable costs.Based on this discussion of topic like chnical, economic, legal, operational and schedule feasibility, perform an elaborate cost-benefit analysis on the economic feasibility.The Vera Molding company has two alternatives for meeting a customer requirement for 9,500 units of a specialty molding. If done in-house, fixed cost would be $300,000 with variable cost at $40 per unit. Alternative two is to outsource for a total cost of $80 per unit. What is the break-even quantity? Round your answer to the nearest whole number. units Should the firm make the 9,500 units in-house or outsource? Firm should produce the molding .
- Break-Even Analysis Jesaki Publishing is planning for a new novel, and figures fixed costs (overhead, advances, promotion, copy editing, typesetting) at $65,000, and variable costs (printing, paper, binding, shipping) at $1.60 for each book produced. The book will be sold to distributors for $12 each. Answer the following questions about this venture. What is the total cost if Jesaki Publishing breaks even? $ . Round to the nearest dollar.Walton, Inc. is unsure whether to sell its product assembled or unassembled. The unit cost of the unassembled product is $32, while the cost of assembling each unit is estimated at $34. Unassembled units can be sold for $110, while assembled units could be sold for $142 per unit. What decision should Walton make?The Vera Molding company has two alternatives for meeting a customer requirement for 7,500 units of a specialty molding. If done in-house, fixed cost would be $200,000 with variable cost at $32 per unit. Alternative two is to outsource for a total cost of $78 per unit. What is the break-even quantity? Round your answer to the nearest whole number. _________ units Should the firm make-in-house or outsource? Round your answers to the nearest dollar. Total cost if done in-house: $ ________________ Total cost if outsourced: $ ________________ So, the firm can save $ ____________ by producing in- house. A company has two alternatives for meeting a customer requirement for 8,000 units of a specialty molding. If done in-house, fixed cost would be $345,000 with variable cost at $35 per unit. Alternative two is to outsource for a total cost of $80 per unit. Determine the break-even point. Round your answer to the nearest whole number. ______________ units Determine if they should…