Calculate the unit cycle time for a 190 t mining truck loaded by an excavator with a nominal bucket volume of 30m requiring 4 passes with the following operational time- duration data: Excavator loading time = 36 seconds per loading pass Truck travelling time = 351 seconds per truck Truck dumping time = 22 seconds per truck Unloaded truck Travelling back time = 181 seconds per truck Truck queuing or waiting time = 75 seconds/truck Excavator-truck spotting time = 14 seconds/truck

Principles of Heat Transfer (Activate Learning with these NEW titles from Engineering!)
8th Edition
ISBN:9781305387102
Author:Kreith, Frank; Manglik, Raj M.
Publisher:Kreith, Frank; Manglik, Raj M.
Chapter4: Numerical Analysis Of Heat Conduction
Section: Chapter Questions
Problem 4.4P
icon
Related questions
Question
Calculate the unit cycle time for a 190 t mining truck loaded by an excavator with a nominal bucket volume of 30m requiring 4 passes with the following operational time- duration data: Excavator loading time = 36 seconds per loading pass Truck travelling time = 351 seconds per truck Truck dumping time = 22 seconds per truck Unloaded truck Travelling back time = 181 seconds per truck Truck queuing or waiting time = 75 seconds/truck Excavator-truck spotting time = 14 seconds/truck
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Heat Transfer (Activate Learning wi…
Principles of Heat Transfer (Activate Learning wi…
Mechanical Engineering
ISBN:
9781305387102
Author:
Kreith, Frank; Manglik, Raj M.
Publisher:
Cengage Learning