Central Construction Company moves materials between three plants and three projects. Project A requires 140 truckloads each week, project B requires 200, and project C requires 80. Plant W can supply 120 loads, plant X can supply 160 , and plant Y can supply 140. Using the cost information given in the following table, compute the optimal transportation cost using the stepping-stone method. Cost Information From To project A To project B To project C Plant W $10 $4 $9 Plant X 4 6 5 Plant Y 7 4
Q: The plant engineer for the Bitco manufacturing plant is designing an overhead conveyor system that…
A: The distribution/inventory center is at node 1 and we have to find out the shortest route to each of…
Q: The Midlands Field Produce Company contracts with potato farmers in Colorado, Minnesota, North…
A: From\To Ohio Missouri Iowa Supply Colorado 1000000 1.09 1.26 1600 Minnesota 0.89 1.32 1.17…
Q: A sports apparel company has received an order for a college basketball team's national championship…
A: Transportation model is formulated to move items at a minimum cost from different sources to their…
Q: Solve the following transportation model by: a- North -West Corner (NWC) Method. b- Vogel…
A: The North West corner rule is a method for computing a basic feasible solution of a transportation…
Q: The travelling salesman problem involves finding the shortest route between cities given that each…
A: From a computational intricacy position, intractable problems will be problems for which there exist…
Q: A manufacturer produces sport wheels at three plants located in towns A, B and C. The wheels are…
A: Northwest corner method is a transportation problem solving method.
Q: A steel mill in Gary supplies steel to manufacturers in eight other midwestern cities by truck, as…
A: Solution The network above shows the connecting distance of various cities. In order to know the…
Q: Find an initial feasible solution to this transportation problem by following the North-West corner…
A: The North-West corner Rule is a method for calculating the initial possible solution to a…
Q: How does linear equations can help to find a solution to the transportation, assignment and…
A: Transportation System of Linear programming : Description The Transportation System of direct…
Q: The distribution of goods from the source (factory) to the target (warehouse) will cause problems…
A: Given, G1 G2 G3 P1 60 45 40 P2 40 58 47 P3 45 57 42
Q: In Myanmar, five laborers, each making the equivalent of $3.50 per day, can produce 40 units per…
A: Given data Total labor costs =5×3.50=17.5 Total shipping cost =40×1.75=70 Total labor cost and…
Q: In the orginal Western set covering model in Figure 6.22, we assumed that each city must be covered…
A: Given the subtleties of the distance to and from urban communities inside miles and expected to plan…
Q: 2.The GOODBABY Company has three plants producing child push chairs that are to be shipped to four…
A: Formula:
Q: An initial solution to a transportation problem is given below. a. Use Northwest, MCM and VAM to…
A: Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: Companies A, B, and C supply components to three plants (F, G, and H) via two crossdocking…
A: It costs $4 to ship from D regardless of final destination and $3 to ship to E regardless of…
Q: Built-4-U is an online furniture company that caters to those customers. Built-4-U buys build…
A: Given, Cost ≥ 35000 Labor hours ≤ 4 employees * 5 days * 10 hours *60 minutes = 12000 Weight ≥ 6000
Q: The Thor International Company operates four factories that ship products to five warehouses. The…
A:
Q: 3. Transportation Model (Solve using Excel Solver) BOM Manufacturing has four plants P1, P2, P2, and…
A: Find the given details below: Given details: B1 B2 B3 B4 Capacity P1 3 5 7 6 1000 1100…
Q: A grocery company owns three warehouses in different parts of the country. You want to distribute a…
A:
Q: Consider a supply chain network with three potential sites for warehouses and eight retailer…
A:
Q: A fertilizer manufacturer has to fulfill supply contracts to its two main customers (650 tons to…
A: VA1 = tons shipped to customer A from warehouse 1VA2 = tons shipped to customer A from warehouse…
Q: Jason Company manufactures plastic products at three locations in Malaysia: Skudai, Taiping, and…
A:
Q: Companies A, B, and C supply components to three plants (F, G, and H) via two crossdocking…
A: Let Xij be the number of units shipped from i to j where i is a,b,c,d,e and j is d,e ,f,g,h…
Q: A company currently ships products from 5 plants to 4 warehouses. The company is considering the…
A: Find the Given details below: Given details: Plant 1 Plant 2 Plant 3 Plant 4 Plant 5 Demand…
Q: The basic feasible solution to the transportation problem with the costs as shown below are x11,…
A: Find the Given details below: Given details: 1 2 3 4 Supply 1 9 7 12 8 18 2 15 12 12 15…
Q: 4. The plant engineer for the Bitco manufacturing plant is designing an overhead conveyor system…
A:
Q: Problem 1 The following network describes a transportation scenario in which there are four sources…
A: a) Min cost = 7AP + 8 AQ + 9 AR + 4BP + 6BQ + 7BR + 8 CP + 9 CQ + 9 CR + 12 DP + 9 DQ + 8 DR…
Q: a. set up the transportation tableau for this problem, determine the initial solution using VAM and…
A: Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: Given the following cost information, solve for the optimal transportation cost: Use MODI Method…
A: solution using VAM
Q: (b)Consider a transportation model with m sources and n destinations. Describe briefly how you can…
A: The question is related to Transportation Problem. In a transportation problem the demand must be…
Q: (a) Use the Northwest-Corner Method, the Least-Cost Method and the VAM to get the starting feasible…
A: The transportation model is used to calculate the minimum cost of the route by selecting different…
Q: I. Solve the following transportation problems using Stepping Stone Method: 1. Santos Printing Press…
A: Find the Given details below: Given details: A B C Supply D 25 18 22 120 E 22 25 20 205…
Q: 2.The GOODBABY Company has three plants producing child push chairs that are to be shipped to four…
A: Formula:
Q: Central Construction Company moves materials between three plants and three projects. Project A…
A: The Stepping Stone Method is utilized to check the optimality of the underlying achievable…
Q: 100 1 6 A 250 4 200 3. B 250 150 3 6. 9. 50 2.
A: In the figure shown in the question we have the transportation network displayed for us from which…
Q: Solve the following problem. Show COMPLETE solution. The Childfair Company has three plants…
A: Plant/DC A B C D 1 8 13 4 7 2 11 14 6 10 3 6 12 8 9
Q: Given the following transportation matrix where the numbers in the cells represent cost of…
A: Find the Given details below: Given details: From/To 3 4 5 6 Dummy Supply 1 40 35 M M 0 100…
Q: Given the following transportation tableau-where the numbers in each cell represent transportation…
A: Note: - Since we can answer only up to three subparts, we will answer the first three subparts(A, B,…
Q: For the following transportation problem find the optimal Solution by using :Multipliers method :…
A: Given data is
Q: Determine the optimal daily demand at each terminal that matches the maximum capacity of the…
A:
Q: Finnish Furniture manufactures tables in facilities located in three cities-Reno, Denver, and…
A: Decision Variables: Suppose-x11 be the no. of tables shipped from Reno to Phoenixx12 be the no. of…
Q: The MidLands Trucking Company based in Louisvillehas eight trucks located throughout the Mideast…
A: Given data is shown below.
Q: 3. Transportation Model (Solve using Excel Solver) BOM Manufacturing has four plants P1, P2, P2, and…
A: Find the Given details below: Given details: B1 B2 B3 B4 Capacity P1 3 5 7 6 1000 1100…
Q: Problern 1 The following network describes a transportation scenario in which there are four sources…
A: “Since you have asked multiple question, we will solve the first question for you. If you want any…
Q: City City City City SUPPLY 1 2 3 4 Plant 1 $ 8 $6 $ 10 $9 35 Plant 2 12 13 7 50 Plant 3 14 16 40…
A:
Q: A freight forwarder has to arrange a truck shipment for his dient's two products from Niagara Falls,…
A: From the given data, Number of skids= 2 Dimensions of the skid= 48in *40in *60in Weight of the each…
Q: A fertilizer manufacturer has to fulfill supply contracts to its two main customers (650 tons to…
A: Shipping costs to be minimized and, Demand and supplying capacity Vij = tons shipped to customer i…
Q: The prices for traveling between five cities in Colorado by bus are given in the table below. Use…
A: Find the Given details below: Given details: From To Boulder Denver Colorado Springs Grand…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- ASAP PLEASE.. The distribution of goods from the source (factory) to the target (warehouse) will cause problems regarding TRANSPORT, namely how the goods are sent from the factory to the warehouse which produces minimum costs. If it is known that - the capacity of 3 factories is 40000, 30000 and 20000, - the need for 3 warehouses is 20000, 50000 and 30000 respectively. The cost of shipping goods from the factory to the warehouse is shown in the following table Solve the above TRANSPORTATION problems with VAM and MODITRANSPORTATION METHOD: INSTRUCTIONS: Solve for the optimal distribution and cost of transportation using the given problem below. Show all solution. GIR Company received a contract to supply unleaded gasolne to four different locations Project A needs 60,000 iters, Project Bneeds 90,000 liters, Project Oneeds 20,000 liters, and Product D needs 30,000 liters. The company has two depot located in two different places, Depot 1 har 220.000 liters available and Depot 2 has 80,000 sters wal sole. Cost to Transport Project Project B Project C Proxecto 5 7 13 Depot 1 Depot 2 8 6 B B SIMPLEX METHOD: Instruction Detamine the optimal solution Mimiz 50XL -20 X2 Subject to X1 420 X1 X2 248A travelling salesman, named Magan Shah plans to visit five cities 1, 2, 3, 4 and 5. The travel time (in hours) between these cities is shown below. To city 1 2 3 4 5 From city 1 x 5 8 4 5 2 5 x 7 4 5 3 8 7 x 8 6 4 4 4 8 x 8 5 5 5 6 8 x How should he schedule his touring plan in order to minimize the total travel time, if he visits each city once a week?
- 1. Transportation Problem: The Navy has 9,000 pounds of material in Albany, Georgia that it wishes to ship to three installations: San Diego, Norfolk, and Pensacola. They require 4,000, 2,500, and 2,500 pounds, respectively (Destination or Demand amounts). Government regulations require equal distribution of shipping among the three carriers (Supply nodes). Note: This means the supply is the same for each type of transportation. The shipping costs per pound for truck, railroad, and airplane transit are shown below. Formulate and solve a linear program to determine the shipping arrangements (mode, destination, and quantity) that will minimize the total shipping cost.DestinationMode San Diego Norfolk PensacolaTruck $12 $ 6 $ 5Railroad 20 11 9Airplane 30 26 28 2. Transshipment Problem The Northside and Southside facilities of Zeron Industries supply three…The following table presents cost, capacity, and demand data for a transportation problem in Stephanie Robbin’s furniture company. Set up the appropriate transportation table and find the optimal solution using Excel's solver. From/To 1 2 3 Supply A 30 10 5 20 B 10 10 10 30 C 20 10 25 75 Demand 40 60 55 a. Is the problem balanced? [ Select ] ["Yes", "it is balanced", "No", "cannot determine"] , If not, where? [ Select ] ["Neither", "Supply", "Demand"] , and by how much? [ Select ] ["0", "40", "30", "25"] b. What is the optimal cost? $ [ Select ] ["2,500", "1,100", "1,275", "1,300"] c. Were you able to meet all demand requirement? [ Select ] ["no", "cannot determine based on the information given", "yes"] If not, which destination (s) was/were not met? [ Select ] ["none, all destinations were met based on supply and demand being equal", "destination 3 by 30 units", "destination 2 by 30 units", "destination 1 by 25 units…9-7 The management of the Executive Furniture Corporation decided to expand the production capacity at its Des Moines factory and to cut back the production capacities at its other two factories. It also recognizes a shifting market for its desks and revises the requirements at its three warehouses. The table on this page provides the requirement at each of the warehouses, the capacity at each of the factories, and the shipping cost per unit to ship from each factory to each warehouse. Find the least-cost way to meet the requirements given the capacity at each factory.
- The Thor International Company operates four factories that ship products to five warehouses. The shipping costs, requirements, and capacities are shown in the tableau below. Use the transportation method to find the shipping schedule that minimizes shipping cost. Factory Shipping Cost per Case to each Warehouse Capacity W1 W2 W3 W4 W5 Dummy F1 $4 $5 $4 $3 $6 $0 50,000 F2 $3 $4 $4 $5 $7 $0 80,000 F3 $3 $4 $5 $3 $5 $0 90,000 F4 $4 $6 $5 $6 $3 $0 40,000…Explain how to determine the number of variables and constraints that would be in a transportation problem simplyby knowing the number of sources and the number of destinations.Consider the following transportation problem: Destination company A B C Supply 1 5 1 7 10 2 6 4 6 80 3 3 2 5 15 Demand 75 20 50 Since there is not enough supply, some of the demands at these destinations may not be satisfied. Suppose these are penalty costs for every unsatisfied demand unit which are given by 5, 3, and 2 for destination A, B, and C respectively. 1. Determine how many units and from which source needs to be shipped using the following methods: A) NWCB) LCMC) VAM2. Find the minimum distribution cost
- Distribution Network Planning. The distribution system for the Herman Company consists of three plants, two warehouses, and four customers. Plant capacities and shipping costs per unit (in $) from each plant to each warehouse are as follows: Warehouse Plant 1 2 Capacity 1 4 7 450 2 8 5 600 3 5 6 380 Customer demand and shipping costs per unit (in $) from each warehouse to each customer are as follows. MLO 3 Customer Warehouse 1 2 3 4 1 6 4 8 4 2 3 6 7 7 Demand 300 300 300 400 Formulate a linear programming model of the problem. Solve the linear program to determine the optimal shipping plan.2. Unbalanced. Provide the transportation model for the calculation of cost given the following data: Use the Stepping Stone Method to solve the following. Use degeneracy method or dummy method if necessary.allons of deionized water from each wholesaler to each distribution center is shown in the following table: Question Viewer a. Which of the following statements regarding setting up the tableau for the optimal solution for this problem is true? B. The sum of supply capacities is greater than the sum of demands, so a dummy distribution center is needed. C. The sum of supply capacities is less than the sum of demands, so a dummy wholesaler is needed. b. What is the total cost of the solution? The optimal cost is $ ((Enter your response rounded to the nearest dollar.)