Consider the following network representation of a transportation problem: 20 30 Jefferson City Demand Omaha Jefferson City Omaha Total Cost: 16 Jefferson City Omaha 10 $ Supplies Demands The supplies, demands, and transportation costs per unit are shown on the network. The optimal (cost minimizing) distribution plan is given below. 0 25 25 Des Moines 25 10 Kansas City 5 15 Louis Des Moines Kansas City St.Louis Supply 10 20 0 10 15 10 Total Cost: $480. Find an alternative optimal solution for the above problem. If required, round your answer to nearest whole number and if your answer is zero enter "0". Des Moines Kansas City St.Louis 8 30
Q: Companies A, B, C were evaluated as prospective suppliers of timber to a furniture manufacturing…
A:
Q: How many PPM defects is Six Sigma level?
A: Six sigma can be defined as a data driven methodology that would reduce the number defects in any…
Q: Myrtle Air Express decided to offer direct service from Cleveland to Myrtle Beach. Management must…
A: a. pessimistic: Decision = discount service minimax regret: decision = Discount service
Q: Terminator, Inc., manufactures a motorcycle part in lots of 300 units. The raw materials cost for…
A: Given data: Lot size(Q) = 300 units Raw material cost = $170 Value added in manufacturing per unit…
Q: Howard Weiss, Inc., is considering building a sensitive new radiation scanning device. His managers…
A: Given data: Alternative Scenario Probability Possibleprofit/loss(Impact) Build New Plant ATR…
Q: The LP model and output below represent a problem whose solution will tell a specialty retailer how…
A: In the question, I have been given the LP formulation data, here, the objective function would be…
Q: Joe is an active 26-year-old male who lifts weights six days a week. He is looking to minimize the…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: Senior executives at an oil company are trying to decide whether to drill for oil in a particular…
A:
Q: a) The reorder point = enter your response here breads (round your response to the nearest whole…
A: Inventory management is the management in which company stores and holds the raw materials as well…
Q: Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the…
A: Number of days(N) = 305 Setup labor cost = 60 Annual holding cost(H) = 19 Production(p) = 1040…
Q: A part is demanded at the rate of 430 per week. The part is purchased from a supplier in Asia, and…
A: Given data Service level = 90% The z value of 90% service level will be calculated by the…
Q: Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary" is a…
A: The precedence diagram method often called PDM can be stated as the tool for scheduling the tasks in…
Q: olve the following problem with Excel Solver: (Leave no cells blank be certain to enter "0" wherever…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: RVW (Restored Volkswagens) buys 30 used VW's at each of two car auctions each week held at different…
A: As per the information given, RVW buys 30 used VWs at each of two car auctions each week held at…
Q: 2. Sugarco can manufacture three types of candy bar. Each candy bar consists totally of sugar and…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: Tamara is considering venturing into the public transport system although she is unsure on whether…
A: Estimated monthly collection: Costs of vehicles: Cost of minim bus = 2.5 Million Cost of Matatu = 2…
Q: 0 Lila Battle has determined that the annual demand for number 6 screws is 100,000 screws. Lila, who…
A:
Q: Draw a network diagram for this process. What is the total expected time in hours for this recipe to…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: d. Use the longest work element decision rule to balance the line and calculate the efficiency of…
A: Line balancing is the process of allocating the right tasks to the right station based on the…
Q: how did you get the answers to the optimal production schedule.
A: Here I have provided the same answer in a different format for your better understanding. Given…
Q: As manager of the St. Cloud Theatre Company, you have decided that concession sales will support…
A: Find the given details below: Given details: Item Selling Price Variable cost % of revenue…
Q: The economic purchase lot is an important tool for companies that want to minimize the total cost of…
A: Economic purchase lot or economic order quantity is a mathematical concept used in operations to…
Q: The Eastern Solutions Company Limited (ESCL) has tendered for, and won a contract to design and…
A: Find the Given details below: Activity Immediate predecessor Optimistic Time(To) a(Weeks)…
Q: In the 360 degrees performance management compare and contrast the peers and clients’ possible…
A: Performance occurs when there is a task. Doing a task to reflect standard quality output is termed…
Q: 1
A:
Q: 1. Suppose we are considering the question of how much capacity to build in the face of uncertain…
A: Find the Given details below: Given details: Demand X Units Probability of X 0 0.05 1 0.1…
Q: Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 <BUDE" 2 A 3 4…
A: Given data: Job Operation - 1 Operation - 2 A 12 4 B 8 11 C 5 14 D 6 2 E 9 10 F 3 1…
Q: eric strategies that are enabled by information technology to effectively deal with the competitive…
A: Gaining Competitive Advantage via the Use of Information SystemsTo gain an advantage over the…
Q: Drivers are trained in a process with two resources. A worker in the first resource trains 0.028…
A: Given data For the first resource Total number of workers = 4 workers A worker trains a driver in…
Q: What is JIT (Just in time) in logistic managemet & its pre-requisite explain with examples?
A: There are two different questions, as per the guideline, the first question is taken to answer,…
Q: Using examples, describe the differences between backward and forward integration.
A: Definitions Forward integration: - When a company intends to or acquires control over the process…
Q: The Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A: The precedence diagram process (PDM) is a tool based on scheduling activities in the project plan.…
Q: Question 3 Use a weighted score model to choose between three methods (A, B, C,D) of financing the…
A: The weighted Score Model is a method used in business where different types of decisions and…
Q: Problem 13-8 (Algo) A shirt manufacturer buys cloth by the 100-yard roll from a supplier. For…
A: From the given information, Average irregularities, c bar =Total irregularities ÷sample size…
Q: A manufacturer must choose between locating in Atlanta (fixed cost of $60,000/year and variable cost…
A: There are two different questions, as per the guideline, the first question is taken to answer. The…
Q: Tesla is launching a new model of their cars. It is known as the Tesla-model X. Their production…
A: Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: What kinds of sources should you examine, as you read for a research project
A: A research project indicating a coordination work which helps to improve or shape the knowledge. A…
Q: Out of ten (10), name five (5) critical decision areas of Operations Management and discuss them…
A: Operations management focuses on addressing the design, planning, and the operational control of…
Q: The company has four excavators, located one each, at each of its four facilities. The excavators…
A: This is an assignment problem wherein we need to assign 1 excavator to each site and keep the…
Q: mon forecasting techniques.
A: It is possible to describe forecasting as a method of making predictions about the future based on…
Q: Max 7x+3y s.t. 2x+2y ≤ 8 A 3x+2y ≤ 12 B 1x+0.5y ≤ 3 C x,y 20 What is the maximum profit for this LP…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: The applicant's signature is required on a life insurance application for which of the following…
A: Answer = Option B To represent that the statements on the application are true to the best of the…
Q: A shop that makes candles offers a scented candle, which has a monthly demand of 360 boxes. Candles…
A: Monthly demand =360 boxes Annual demand, D =360×12 =4320 boxes Daily production rate, p =36 boxes…
Q: Medaas Electronics is a fictional producer of laser printers. The company's production planner,…
A:
Q: is the bottleneck. b) The bottleneck time is c) The throughput time of the overall system is minutes…
A: First, I will determine the time required (in minutes) to process a unit for each of the…
Q: What is the expected time for activity B? What is the variance for activity B? Based on the…
A: The Program Evaluation Review Technique (PERT) is a project management planning method that…
Q: Given the following forecast and cost information, Regular time cost $ 40.00 per unit determine the…
A: Given data is Month Forecast 1 570 2 600 3 630 4 650 5 670 6 690 Regular…
Q: Howard Weiss, Inc., is considering building a sensitive new radiation scanning device. His managers…
A:
Q: supply chain management systems
A: The possible five Demerits of a joint venture are: 1. Building the appropriate partnerships takes…
Q: Senior executives at an oil company are trying to decide whether to drill for oil in a particular…
A:
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 7 images
- This problem is based on Motorolas online method for choosing suppliers. Suppose Motorola solicits bids from five suppliers for eight products. The list price for each product and the quantity of each product that Motorola needs to purchase during the next year are listed in the file P06_93.xlsx. Each supplier has submitted the percentage discount it will offer on each product. These percentages are also listed in the file. For example, supplier 1 offers a 7% discount on product 1 and a 30% discount on product 2. The following considerations also apply: There is an administrative cost of 5000 associated with setting up a suppliers account. For example, if Motorola uses three suppliers, it incurs an administrative cost of 15,000. To ensure reliability, no supplier can supply more than 80% of Motorolas demand for any product. A supplier must supply an integer amount of each product it supplies. Develop a linear integer model to help Motorola minimize the sum of its purchase and administrative costs.Consider the following primal LP problem:Maximize X1 + 2X2 – 9X3 + 8X4 – 36X5Subject to 2X2 – X3 + X4 – 3X5 ≤ 40 X1 – X2 + 2X4 – 2X5 ≤ 10 X1 ≥ 0, X2 ≤ 0, X3 ≥ 0, X4 ≥ 0, X5 ≥ 0 (a) Write the dual of the LP above, using variables Y1, Y2, etc.(b) Sketch the feasible region of the dual LP in 2 dimensions, and use the graphical method to find the dual optimalsolution (Plot an isovalue line corresponding to the feasible solution, move the line in improving direction, findthe last one touching the feasible region, and any point(s) on the intersection of the last isovalue line andfeasible region are optimal solutions)(c) Using complementary slackness conditions, - write equations which must be satisfied by the optimal primal solution X* - which primal variables must be zero?(d) Using the information in (c), determine the optimal primal solution X* (e) Compare the optimal objective values of the primal and dual solutionsConsider the following linear programming model with 4 regular constraints:Maximize 3X + 5Y (a) Draw your graph in the space below:subject to: 4X + 4Y ≤ 48 (constraint #1) 4X + 3Y ≤ 50 (constraint #2) 2X + 1Y ≤ 20 (constraint #3) X ≥ 2 (constraint #4) X, Y ≥ 0 (non-negativity constraints)(a) Which of the constraints is redundant? Constraint #______.Justify by drawing a graph similar to Figure 7.14 on p.263.(b) Is point (9,3) a feasible solution? _____. Explain your answer (by analyzing each of the constraints).Constraint #1: _______________________________________________________________Constraint #2: _______________________________________________________________Constraint #3: _______________________________________________________________Constraint #4: ______________________________________________________________
- Consider the following linear programming problem: MIN Z = 3x1 + 2x2 Subject to: 2x1 + 3x2 ≥ 12 5x1 + 8x2 ≥ 37 x1, x2 ≥ 0 What is minimum cost and the value of x1 and x2 at the optimal solution?Mad Max wants to travel from New York to Dallas bythe shortest possible route. He may travel over the routesshown in Table 8. Unfortunately, the Wicked Witch canblock one road leading out of Atlanta and one road leadingout of Nashville. Mad Max will not know which roads havebeen blocked until he arrives at Atlanta or Nashville. ShouldMad Max start toward Atlanta or Nashville? Which routesshould the Wicked Witch block? Route (Miles)New York–Atlanta 800New York–Nashville 900Nashville–St. Louis 400Nashville–New Orleans 200Atlanta–St. Louis 300Atlanta–New Orleans 600St. Louis–Dallas 500New Orleans–Dallas 300Jefferson Distributing is analyzing distribution networks with either 4, 5, 6 or 7 warehouses to serve 200 major customers in Europe. Relevant costs include transportation cost from the warehouses to customers, fixed facility costs, and inventory costs in the warehouses. The table below shows the annual transportation cost produced by a facility location software tool for locating 4, 5, 6 or 7 warehouses for this company. Suppose that annual inventory cost for the network can be modeled as $800,000 times the square root of the number of warehouses. Thus, if the network has 4 warehouses, then the annual inventory cost would be $800,000 x √4= $1,600,000. Number of Warehouses Transportation Cost 4 8,000,000 5 6,500,000 6 5,000,000 7 4,400,000 a) If the annual fixed cost per warehouse is $1,000,000, how many warehouses should there be to minimize the total (transportation + warehouse + inventory) cost? b) Now suppose the…
- A refinery manufactures two grades of jet fuel, Fl and F2, by blending four types of gasoline, A. B, C, and D. Fuel Fl uses gasolines A. B. C, and D in the ratio 1:1:2:4, and fucl F2 uses the ratio 2:2:1:3. The supply limits for A, B.C, and D are 1000, 1200, 900, and 1500 bbl/day, respectively. The costs per bbl for gasolines A, B, C, and D are $120, $90, $100, and $150, respectively. Fucls Fl and F2 sell for $200 and $250 per bbl, respectively. The minimum demand for F1 and F2 is 200 and 400 bbl/day, respectively. Develop an LP model to determine the optimal production mix for F1 and F2, and find the solution using SolverA refinery manufactures two grades of jet fuel, Fl and F2, by blending four types of gasoline, A. B, C, and D. Fuel Fl uses gasolines A. B. C, and D in the ratio 1:1:2:4, and fucl F2 uses the ratio 2:2:1:3. The supply limits for A, B.C, and D are 1000, 1200, 900, and 1500 bbl/day, respectively. The costs per bbl for gasolines A, B, C, and D are $120, $90, $100, and $150, respectively. Fucls Fl and F2 sell for $200 and $250 per bbl, respectively. The minimum demand for F1 and F2 is 200 and 400 bbl/day, respectively. Develop an LP model to determine the optimal production mix for F1 and F2,Fred Block Company has orders for 90 tons of concrete blocks at three suburban locations as follows: Northwood -- 25 tons, Westwood -- 45 tons, and Eastwood -- 20 tons. Fred has two plants, each of which can produce 50 tons per week. Delivery cost per ton from each plant to each suburban location is shown as follows Delivery Cost Per Ton Northwood Westwood Eastwood Plant1 20 30 40 Plant 2 30 40 45 a. Develop a network representation of this distribution problem. b. Develop a linear program model that can be used to determine the plan that will minimize total distribution costs. c. Solve the problem to describe the distribution plan and show total distribution cost.(Submit Excel files).