Consider the following product structure: Each A consists of one B and three Cs. Each B consists of one D, two Es, and five Fs. Each C consists of one E and one F. How many Fs are necessary to produce a single finished good A?
Q: nformation concerning the product structure, lead times, and quantities on hand for an electric golf…
A:
Q: The product structure tree for end item E follows: The manager wants to know the material…
A: Every business draws the material requirement planning to maintain the production process and…
Q: What does process planning entail? How would processplanning differ for batch and continuous…
A: The product-flow process is vital in any operations and production system. It is the prime duty of…
Q: Montague Composite makes a unit A, which consists of two units of B, three units of C, and four…
A: Net requirements = Gross requirements - (Beginnning inventory + current period Scheduled receipts)…
Q: Assume you are the manager of Assembly Inc., you have just received an order for 40 units of an…
A: Net requirements = Gross requirements - (Beginnning inventory + current period Scheduled receipts)…
Q: Consider the bill of material for a product, A, and the data given in the table that follows. The…
A: To be determined: solve the last 2 MCQ's with the help of given infomation. Answer to last 2 parts:…
Q: Assembly of End Item A requires 3 units of B and 2 Units of C. The scrap allowance for part B is…
A: Given details , Assembly of end item A requires 3 units of B and 2 units of C. Also The scarp…
Q: Product A consists of subassemblies B and C. Subassembly B requires two parts of D and one part of…
A: Product Structure Tree In manufacturing, a hierarchical grouping of the objects that form a product…
Q: A firm has the following gross requirements for Item F. If ordering costs are $60 per order and…
A: Find the Given details below: Given details Period 1 2 3 4 Gross Requirements 60 40 80 60…
Q: Assume that Product Z is made of two units of A and four units of B. A is made of three units of C…
A: Formula to be used ; Units needed = Requirements * Usage rate
Q: Given the table below, select the statement that best fits the box with the Asterix (*) Project…
A: Batch production is a method of production is manufacturing facility which facilitate the group…
Q: A table is assembled using three components, as shown in the accompanying product structure tree.The…
A:
Q: snip
A: In production, the product structure tree gives a hierarchical classification of the items which…
Q: What are the sources of demand in an MRP system? Are these dependent or independent, and how are…
A:
Q: The product structure tree for end item E follows: The manager wants to know the material…
A: The material requirements planning (MRP) is an effective inventory planning system that helps in…
Q: Ajay wanted to produce 20 percent of one product (A), 50 percent of another (B), and 30 percent of a…
A: The development of different versions (variants) of a product in batches, one after the other in a…
Q: One area to which aggregate planning decisions relate is: O a. layout O b. customer order quantities…
A: Aggregate planning can be defined as the concept of matching the demand and supply output over 12…
Q: Given the following Product Structure Diagram The number of E’s required for each A is…
A: Gross requirements can be defined as the total requirements of a product to manufacture the final…
Q: Prepare a master production schedule for industrial pumps in the manner of the following table. Use…
A: Criteria: If POH becomes less than 10 then MPS of lot size 70 is scheduled. Calculate the…
Q: product structure tree. Determine the quantities of the required components
A: A product structure tree indicating the work break down based on the component requirements of each…
Q: The BOM for product A is given below:Assume the master schedule calls for 200 units of product A in…
A: The cumulative requirements for each cycle are called the Gross Requirements. Scheduled receipts are…
Q: One unit of Part C is used in item A and in item B. Currently, we have 10 As, 20 Bs, and 100 Cs in…
A: Supply chain management is managing the flow of goods and services, involving the storage of raw…
Q: The bill of materials (BOM) for product A is shown in the figure below. The lotsizing rule and other…
A: SOLUTION: MRP for the components B,C AND D.
Q: Determine the gross quantities needed of each item if you are to assemble 75 brackets compute…
A: no. of base required for 1 bracket = 1no. of base required for 75 brackets = 75
Q: Given the following MRP matrix for Item D: The planned order release for period 3 is
A:
Q: When making a production plan, why is it necessary to select a common unit or to establish product…
A: Let’s first understand the meaning of what is Production plan. Production plan can be simply defined…
Q: Product A consists of two units of Subassembly B, three units of C, and one unit of D. B is composed…
A: Product Structure Tree In production, the hierarchical classification of the items that make up the…
Q: As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material…
A: PART B number of base required for 1 bracket = 1number of base required for 75 brackets = 751)Base =…
Q: What term is used to identify the difference between the number of units of an item listed on the…
A: Lean manufacturing is described as a process through which wastes can be minimized and the…
Q: Using the information in(You need to schedule I0 units of product Alpha fordelivery in 6 weeks.…
A: A Small Introduction about Product Structure Product structure is a progressive disintegration of a…
Q: The following table lists the components needed to assemble an end item, the manufacturing or…
A: Operation manager must make sure that the inventory is up to date. An updated inventory helps to…
Q: snip
A: Given that: Product A consist of 1B and 3C B consist of 1D, 2E, and 5F C consist of 1E and 1F
Q: snip
A: If a product structure diagram has five levels, Level 4 is the lowest.
Q: The following product structure tree indicates the components needed to assemble one unit of product…
A:
Q: Product A consists of subassemblies B and C. Subassembly B requires two parts of D and one part of…
A: Solution a) The product structure tree (BOM) is as shown in the figure-
Q: The following product structure tree indicates the components needed to assemble one unit of product…
A: To build a single unit of Product W, A=1, B=2, and C=4 are required. Therefore, for 100 units of W,…
Q: You need to schedule I 0 units of product Alpha fordelivery in 6 weeks. Three units of D and 2 units…
A: A Small Introduction about Product Structure Product structure is a progressive disintegration of a…
Q: In a make-to-order setting, what is the general procedure for creating a level development plan?
A: Produced to order is a production strategy in which a manufacturer does not begin producing a…
Q: When visiting the kitchen of King Mclolly Burger restaurant you noticed that there is a wall poster…
A: Assembly drawing shows the structure or product along with the components that are linked all…
Q: The SAP ERP production planning process consists of eight stages, as seen in the figure below. a)…
A: SALES FORECASTING It is a technique that includes forecasting future sales. The sales prediction…
Q: Given the following Product Structure Record, the number of G's required for each A is A B D E (2)…
A: A product structure record is described as the classification of items in a hierarchical manner,…
Q: What is the process used to ensure that all of the needs for a particular item are calculated at the…
A: Master Production Schedule (MPS) is the process, which helps to make sure that all of the needs for…
Q: Each A (finished product) requires 1 of component B and 2 of component C. Each B requires 2 of part…
A: Following is the Product A BOM:
Q: Which of the following are the inputs for the material requirements planning? Master production…
A: 1. Master production scheduling, bill of materials and inventory records.
Q: Each A (finished good) requires 1 of component B and 2 of component C. Each B requires 2 of part D…
A: Given information, A = 1B + 2C B = 2D + 1E C = 1D + 1F
Q: Given the following Product Structure Diagram The number of G’s required for each A is…
A: The gross requirements of a product is the total requirements of different sub-products to make one…
snip
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- Given the following Product Structure Diagram The number of E’s required for each A is _________.Given the following Product Structure Diagram The number of G’s required for each A is _________.Product A consists of subassemblies B and C. Subassembly B requires two parts of D and one part of E.Subassembly C requires one part of D and one part of F. a. Draw a product structure tree (BOM) for this product. b. How many parts are needed to make 300 units of finished product?
- Product A is assembled from two units of S1 and threeunits of S2. S1 is made of one unit of C1, four units of C2,and one unit of C3. S2 is made of three units of C2 and twounits of C3.a. Draw a product structure diagram for product A.b. How many C3’s are needed to fill an order for 100 A’s?c. Assume no inventory on hand, products take one day to assemble, subassemblies take two days and compo-nents take three days. When should an order be re-leased for C3 if the 100 A’s are needed by day 7?Product A consists of subassemblies B and C. Subassembly B requires two parts of D and one part of E. Subassembly C requires one part of D and one part of F.a. Draw a product structure tree (BOM) for this product.b. How many parts are needed to make 300 units of finishedproduct?Product A consists of two units of Subassembly B, three units of C, and one unit of D. B is composed of four units of E and three units of F. C is made of two units of H and three units of D. H is made of five units of E and two units of G.a. Construct a simple bill-of-materials (product structure tree).b. Construct a product structure tree using low-level coding.c. Construct an indented parts list.d. To produce 100 units of A, determine the number of units of B, C, D, E, F, G, and H required.
- As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 1 housing. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. This exercise contains only parts b and c. Part 2 The product structure is as follows: Bracket Base(1) Clamp(1) Handle(1) Casting(1) Spring(2) Housing(1) Shaft(1) Clamp(4) Bearing(2) Handle(1) Casting(1) Part 3 b) Determine the gross quantities needed of each item if you are to assemble 100 brackets. Base: enter your response here units (enter your response as a whole number). Spring: enter your response here units (enter your response as a whole number). Clamp: enter your response here units (enter your response as a whole number). Housing: enter your response here units (enter your…As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 3 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 2 shafts. There is no inventory on hand. This exercise contains only parts b and c. Part 2 The product structure is as follows: Bracket Base(1) Clamp(1) Handle(1) Casting(1) Spring(2) Housing(2) Shaft(2) Clamp(3) Bearing(2) Handle(1) Casting(1) Part 3 b) Determine the gross quantities needed of each item if you are to assemble 125 brackets. Base: 33 units (enter your response as a whole number). Spring: enter your response here units (enter your response as a whole number). Clamp: enter your response here units (enter your response as a whole number). Housing: enter your response here units (enter your response as a whole…Product W requires components A, B, C, D, E and F. A unit of W requires 1 unit of A, 2 units of B and 4 units of C. A requires 2 units of D and 1 unit of E. B requires 2 units of E and 1 unit of F. C requires 3 units of D and 2 units of F. Draw the product structure tree. Determine the quantities of the required components for manufacturing 150 units of W.
- As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand. This exercise contains only parts b and c. The product structure is as follows: Bracket Base(1) Clamp(2) Handle(1) Casting(2) Spring(1) Housing(2) Shaft(2) Clamp(3) Bearing(1) Handle(1) Casting(2) b) Determine the gross quantities needed of each item if you are to assemble 50 brackets. Base: ? Spring: ? Clamp: ? Housing: ? Handle: ? Casting: ? Bearing: ? Shaft: ?Product A is assembled from two units of S1 and threeunits of S2. S1 is made of one unit of C1, four units of C2,and one unit of C3. S2 is made of three units of C2 and twounits of C3.a. Draw a product structure diagram for product A.b. How many C3’s are needed to fill an order for 100 A’s?c. Assume no inventory on hand, products take one day toassemble, subassemblies take two days and components take three days. When should an order be released for C3 if the 100 A’s are needed by day 7?Product A is made from components B, C, and D. Item B is asubassembly that requires two units of C and one unit of E.Item D also is an intermediate item, made from two unitsof F. All other usage quantities are two. Draw the BOM forproduct A.