Consider the following production process making an electronic component for a navigation system. The process consists of 20 steps and operate at a cycle time of 1 minute/unit. Their most error prone operation is step 9 of 20. If each worker inspects the work of the previous steps and about 50 units of inventory are between step 9 and the end of the process, roughly

Algebra & Trigonometry with Analytic Geometry
13th Edition
ISBN:9781133382119
Author:Swokowski
Publisher:Swokowski
Chapter7: Analytic Trigonometry
Section7.6: The Inverse Trigonometric Functions
Problem 94E
icon
Related questions
Question
Question 9
9
Consider the following production
process making an electronic
component for a navigation system.
The process consists of 20 steps and
operate at a cycle time of 1
minute/unit. Their most error prone
operation is step 9 of 20.
O 20
If each worker inspects the work of
the previous steps and about 50 units
of inventory are between step 9 and
the end of the process, roughly
equally spaced across the remainder
of the process.
O 10
What would be the information
turnaround time for a defect made at
station 9?
O 11
O about 50 minutes
Question 10
O about 300 minutes
Consider the following production
process making an electronic
component for a navigation system.
The process consists of 20 steps
(stations) and operate at a cycle time
of 1 minute/unit. Their most error
prone operation is step 9 of 20.
O about 20 minutes
If each worker inspects the work of
the previous steps and about 50 units
of inventory are between step
(station) 9 and the end of the process,
roughly equally spaced across the
remainder of the process.
O about 5 minutes
At which station would the defect
made at station 9 would be detected?
Transcribed Image Text:Question 9 9 Consider the following production process making an electronic component for a navigation system. The process consists of 20 steps and operate at a cycle time of 1 minute/unit. Their most error prone operation is step 9 of 20. O 20 If each worker inspects the work of the previous steps and about 50 units of inventory are between step 9 and the end of the process, roughly equally spaced across the remainder of the process. O 10 What would be the information turnaround time for a defect made at station 9? O 11 O about 50 minutes Question 10 O about 300 minutes Consider the following production process making an electronic component for a navigation system. The process consists of 20 steps (stations) and operate at a cycle time of 1 minute/unit. Their most error prone operation is step 9 of 20. O about 20 minutes If each worker inspects the work of the previous steps and about 50 units of inventory are between step (station) 9 and the end of the process, roughly equally spaced across the remainder of the process. O about 5 minutes At which station would the defect made at station 9 would be detected?
Question 11
In the Toyota Production System,
Jidoka refers to
The aggressive reduction of
changeover and setup times.
The inventory retrieval system where
parts are replenished only when they
are needed
Continuous line-balancing to
maximize utilization
It means Control quality when and
where problems occur
Transcribed Image Text:Question 11 In the Toyota Production System, Jidoka refers to The aggressive reduction of changeover and setup times. The inventory retrieval system where parts are replenished only when they are needed Continuous line-balancing to maximize utilization It means Control quality when and where problems occur
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
Algebra and Trigonometry (MindTap Course List)
Algebra and Trigonometry (MindTap Course List)
Algebra
ISBN:
9781305071742
Author:
James Stewart, Lothar Redlin, Saleem Watson
Publisher:
Cengage Learning
Calculus For The Life Sciences
Calculus For The Life Sciences
Calculus
ISBN:
9780321964038
Author:
GREENWELL, Raymond N., RITCHEY, Nathan P., Lial, Margaret L.
Publisher:
Pearson Addison Wesley,
Trigonometry (MindTap Course List)
Trigonometry (MindTap Course List)
Trigonometry
ISBN:
9781337278461
Author:
Ron Larson
Publisher:
Cengage Learning
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,