Describe the two methods of computing retainage?
Q: Do you think that LEED™ is a realistic standard for commercial real estate?
A: The much more frequently used green construction grading system on the planet is LEED (Leadership in…
Q: Discuss the difference between “Equipment for Lease” and Equipment for Rental”
A: Difference between “Equipment for Lease” and Equipment for Rental” can be explained as-
Q: Most real estate agents/professionals do not use the term 'situs,' rather they ask... What is your…
A: Situs is term that generally not used by many agents in real estate Situs means physical location…
Q: man bought an equipment which cost P524,000.00 Freight and installation expenses cost him…
A:
Q: Hi! Please indicate the given, diagram, FBD, and the solution with no shortcuts, Thanks!! 7) Two…
A: Question is based on the dispute of land between two neighbours. Area of land claimed by both the…
Q: The maximally productive use of a property is
A: The test of maximal productivity is used to determine the first three successful tests. The property…
Q: Que 20. The covered area of a proposed building is 150 m? and it includes a rear courtyard of 5m x…
A:
Q: a) Briefly outline any five factors that would guide the process of plant acquisition.
A: Five factors that would guide the process of plant acquisition are: Communication: Have direct…
Q: What exactly is a subprocedure?
A: Subprocedure- A small process is a process that is part of a larger task or the process described…
Q: How is it possible to grant limited authority to an agent.in the Resident Project?
A: It is possible to grant limited authority to an agent in the Residential Project in the following…
Q: Explain the difference between analogous estimating and reserve malaysia ?
A: Analogous estimating is a method in which previous projects are studied and analysed. All the…
Q: Discuss at least 5 different types of Logistic infrastructures Compare between India with Canada…
A: Logistic Infrastructures in India include : Transportation of Goods (Multimodal) Carriage of goods…
Q: Based from the example, what is the number of uses for which purchase and rental costs become even?
A:
Q: Will commercial projects require a detailed estimate with a full quantity takeoff?
A: Clarifying what a quantity takeoff is in construction is relatively straightforward. Basically, a…
Q: What payments are typically linked to Substantial Completion? And to Final Completion?
A: In any construction project, the owner must make monthly or regular payments to the general…
Q: What are the roles of a Quantity Surveyor in the contractual arrangements of a construction project?
A: The person who has adequate knowledge and in charge of the construction cost from the start of the…
Q: what are the classification of property according to mobility
A: The classification of property according to mobility is as follows. Immovable or real property…
Q: Explain the indirect design approach FOR SETTLEMENT ESTIMATES ?
A: The indirect design approach is highly dependent upon the conclusions which have been calculated…
Q: Discuss the group settlement ratio?
A: Group settlement ratio- For defining the settlement in case of a pile group, this term is widely…
Q: What do you mean by pennitmty of free space? What is its value?
A: Brief concept introduction- Permittivity of free space- It is a constant value and it has its…
Q: A project's total costs curve: a. Combines direct costs and indirect costs b. Always has a negative…
A: Answer:- Total cost curve:- A total cost curve is that curve which graphically represents the…
Q: What is the partial utilization?
A: Partial utilization is usage of a significantly completed part of the work by owner for the purpose…
Q: Define the Method of Accelerating the Rate of Consolidation Settlement ?
A: Consolidation is the process of compression of saturated soil under static pressure. It is used to…
Q: What is the purpose of retainage?
A: Retainage is the withholding of a portion of the funds that are due to a contractor or subcontractor…
Q: What do large and small misclosures mean?
A: Answer Misclosure is used in the field of the survey to find the error in the measurement or in…
Q: determine the consolidation settlement
A:
Q: What is meant by reclamation of a water logged land;
A:
Q: Define the term schedule of values?
A: A Schedule of Values is a listing of each item of work on a project, as well as the value or expense…
Q: Define the Berardi et al. (1991) an elastic approach CPT to estimate settlements ?
A: The cone penetration test (CPT) has been widely used to estimate shallow foundations settlement on…
Q: The amount that the property would bring if sold or junk. Scrap value Depreciation Earning value…
A: Asked: To choose the correct option corresponding to the given statement. Given statement: The…
Q: Why is the “straight-line method” not a satisfactory way to calculate depreciation?
A: Answer Straight-line methodThe straight-line method is generally used for calculating depreciation.…
Q: What factors affect the irriqation scheduling? q.
A: Irrigation scheduling means scheduling the amount of watering and frequency of watering to be…
Q: Explain about the corrections to be made for the Settlement due toConsolidation ?
A: When a saturated soil is loaded externally, the water is squeezed out of the soil, and the soil…
Q: Why is it important for the estimator to carefully examine the site of the work before the estimate…
A: Brief concept- The main function of the estimator is to prepare a detailed estimate for the projects…
Q: Valuation of real properties may be done in many ways. We expect that on a per-square-foot basis, a…
A: Answer - False Valuation of real properties may be done in many ways. We expect that on a…
Q: Q5: Explain difference between “Escalation and Liquidated Damages”. Write how site conditions…
A: Liquidated Damages The two sorts of delay damages that an owner can suffer are liquidated damages…
Q: Name the types of Bailers and desctibe about them.
A: Bailers are used for collection of samples from distinct levels or flow points in order to carry out…
Q: Describe the tern Retainage?
A: Retainage is a form of retaining money so that there will be no obstruction in construction of…
Q: Surcharging.
A: In soil engineering, Surcharging is one of the method or technique of ground improvement of cohesive…
Q: What are the standard contract provisions for the measurement and the payment for a project?
A: - Types of contract on the basis of measurement and payment are 1- Lump sum project - It is also…
Q: The owner of the lot (details given below) has decided to subdivide his lot into 3 parts. The first…
A:
Q: 1. What is the maximum value for the a f repose?
A: The plane of contact between two bodies making it with horizontal when the upper body is just on the…
Q: How do government policies of land ownership/leasing affect the rebuilding of an area. Give an…
A: Brief concept introduction- Land lease policy- It stipulates that the landlord can legally lease the…
Q: Capitalized cost of any property is equal to:
A: Capitalized cost: -It is defined as the cost that the company makes to acquire an asset that is…
Q: What should be included within interim valuations?
A: Interim valuation are defined as the detailed breakdown which prepared by the contractor and it is…
Q: How MaNy JNKNOWNS RESTRONTS MF THERE
A: Number of restraints are different for different support reactions In the given beam there are two…
Q: 3. Discuss the Consolidation and Settlement. You may draw/show illustrations and drawings if deemed…
A: If a saturated clay water system is subjected to external loading, then initially whole pressure…
Describe the two methods of computing retainage?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps