Determine the concrete proportion of 2 slabs of the same size of the slab shown using class "C" mixture 40 kg/bag of cement. Instruction: For your answer, rounding of decimal places: 0.1-0.4 round up to 0.5 and 0.5-0.9 round up to nearest whole number - for sand and gravel; |always round up to nearest whole # for cement. .10 4.00m 6.00m cement: 18 bags, sand: 1.5 cu. m, gravet: 2.5 cu. m cement: 36 bags, sand: 2.5 cu. m, gravet: 5 cu. m O cement: 22 bags, sand: 1.5 cu. m, gravet: 2.5 cu. m cement: 29 bags, sand: 2.5 cu m gravet: 5 cu. m cement: 12 bags, sand: 1.5 cu. m, gravet: 25 cu. m None of the choices

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Determine the concrete proportion of 2 slabs of the same size of the slab shown using class
"C" mixture 40 kg/bag of cement. Instruction: For your answer, rounding of decimal places:
0.1-0.4 round up to 0.5 and 0.5-0.9 round up to nearest whole number - for sand and gravel;
|always round up to nearest whole for cement.
O10
4.00m
6.00m
cement: 18 bags, sand: 1.5 cu. m, gravet: 2.5 cu, m
cement: 36 bags, sand: 2.5 cu. m, gravet: 5 cu. m
cement: 22 bags, sand: 1.5 cu. m. gravet: 2.5 cu. m
cement: 29 bags, sand: 2.5 cu m gravet: 5 cu. m
cement: 12 bags, sand: 1.5 cu. m, gravet: 25 cu m
None of the choices
SHOW COMPLETE SOLUTION WITH FBD
Transcribed Image Text:Determine the concrete proportion of 2 slabs of the same size of the slab shown using class "C" mixture 40 kg/bag of cement. Instruction: For your answer, rounding of decimal places: 0.1-0.4 round up to 0.5 and 0.5-0.9 round up to nearest whole number - for sand and gravel; |always round up to nearest whole for cement. O10 4.00m 6.00m cement: 18 bags, sand: 1.5 cu. m, gravet: 2.5 cu, m cement: 36 bags, sand: 2.5 cu. m, gravet: 5 cu. m cement: 22 bags, sand: 1.5 cu. m. gravet: 2.5 cu. m cement: 29 bags, sand: 2.5 cu m gravet: 5 cu. m cement: 12 bags, sand: 1.5 cu. m, gravet: 25 cu m None of the choices SHOW COMPLETE SOLUTION WITH FBD
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Bars
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning