Determine the design capacity of the pile group shown below. The pile cap thickness is 1.5 meters, and groundwater table is located 2.8 meters below the ground surface. Piles are 350-mm in diameter and 12 meters in length. Use a critical depth equal to 18*dpile (starting from ground level), K = 3, ac (adhesion factor for clay) = 0.5, as (wall friction angle for sand)= 25°, and FS = 3. Only consider single-pile action and neglect the capacity of the pile cap. Ground Level 1.5 m - Firm Clay c - 35 kPa Yary - 14.6 kN/m³ Y =17.9 kN/m³ - 3.5 m Medium Dense Sand 9-31° - 6.2 m Ydry- 16.8 kN/m³ Yat = 19.4 kN/m³ Layout of Pile Group Dense Sand 9=420 Ydy= 18.2 kN/m³ Yut- 20.1 kN/m³ N - 200 %3D

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter18: Pile Foundation
Section: Chapter Questions
Problem 18.18P
icon
Related questions
Question
Determine the design capacity of the pile group shown below. The pile cap thickness is 1.5 meters, and
groundwater table is located 2.8 meters below the ground surface. Piles are 350-mm in diameter and 12
meters in length. Use a critical depth equal to 18*dpile (starting from ground level), K = 3, ac (adhesion
factor for clay) = 0.5, a, (wall friction angle for sand)= 25°, and FS = 3. Only consider single-pile action
and neglect the capacity of the pile cap.
Ground Level
1.5 m-
Firm Clay
c = 35 kPa
Yary = 14.6 kN/m³
Yaut = 17.9 kN/m³
3.5 m
Medium Dense Sand
31°
- 6.2 m
Yary = 16.8 kN/m³
Yaat = 19.4 kN/m³
Layout of Pile Group
Dense Sand
9 = 42°
Yary = 18.2 kN/m³
Yu- 20.1 kN/m³
N - 200
Transcribed Image Text:Determine the design capacity of the pile group shown below. The pile cap thickness is 1.5 meters, and groundwater table is located 2.8 meters below the ground surface. Piles are 350-mm in diameter and 12 meters in length. Use a critical depth equal to 18*dpile (starting from ground level), K = 3, ac (adhesion factor for clay) = 0.5, a, (wall friction angle for sand)= 25°, and FS = 3. Only consider single-pile action and neglect the capacity of the pile cap. Ground Level 1.5 m- Firm Clay c = 35 kPa Yary = 14.6 kN/m³ Yaut = 17.9 kN/m³ 3.5 m Medium Dense Sand 31° - 6.2 m Yary = 16.8 kN/m³ Yaat = 19.4 kN/m³ Layout of Pile Group Dense Sand 9 = 42° Yary = 18.2 kN/m³ Yu- 20.1 kN/m³ N - 200
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning