Draw manually a WBS for your assumed building project. Mention duration for each activity of your project and total completion time.
Q: What are the four main types of schedule methods?
A:
Q: Explain the term CPM Scheduling for Construction?
A: The Critical Path Method ( CPM) is the most commonly used scheduling method and is also called the…
Q: A new building is to be constructed on an uncrowded area. It consists of four floors, as shown…
A:
Q: Hope your help foundation question (CEE430) thanks
A: Effective stress at the center of the clay layer, σ = ϒd × 2.8 + (ϒsat- ϒw)×4.2 + (ϒsat clay –…
Q: a What is the probability that path A-B-D-F-G will take from 100 to 120 days to complete? Answer =…
A: Note: As per the Bartleby guideline the solution of the first 3 subparts are only provided Project…
Q: Q6: schedule the information of a project shown below by using: 1. Bar-chart method. 2. Time- grid…
A:
Q: What are the issues that can be resolved in this staging project? Explain 6 main issues with…
A: Time, scope and budget are the main 3 criteria's to be considered for a project management. We are…
Q: : Draw the network diagram by using AON technique for the following activities, define the located…
A: First we will draw the network using AON type. Then we will find the critical path for the network.…
Q: Discuss about stakeholders of construction project. Also enlist all stakeholders of BRT project.
A: Answer Definition of stakeholder and list of stakeholder briefly explain in the second step
Q: (c) a project engineer assisting one project manager in all of his or her capacities in the trailer…
A: Project manager is very responsible person on the construction site. He plans, organise and divides…
Q: Work Breakdown Structure should be developed by Select one. OA Project Manager O B individuals…
A:
Q: t. Determine temporary works needed for a construction site
A:
Q: Homework I: Draw the network diagram by using AOA lechnique for the following activities, define the…
A: Solution Given Data Draw the network diagram AOA Technique
Q: Show in calculation the project status if it is behind, ahead, or on schedule: 10K A AA 11K 12K 10K
A:
Q: Homework2: Draw the network diagram by using AON technique for the following activities, define the…
A: Given:- The time duration of the following activities are given:- Activity Preceding Activity…
Q: b. Identify and develop a comprehensive work break down structure for the project. c. The WBS…
A: Solution Given data network diagram is given
Q: • Plot the Gantt Chart for the following activities DURATION START АCTIVITY (in weeks) (WEEK)…
A: The gantt chart shows the activities in project management, where the bar represents activity and…
Q: ratio
A: PERT uses three estimated times for activity duration optimistic time The estimate is determined…
Q: Using CESMM3, A. Provide the activity Description for the underlisted work activities ( a - e)…
A: the civil engineering method of the measurement commonly know as the CESMM3. the objective of the…
Q: Find the critical path , time of executed of the projects and draw the activity by arrows Activity…
A:
Q: The analysis of every schedule-related problem is unique and what does these analysis include?
A: The scheduling of a construction is the graphical representation showing the process of completion…
Q: How is the CPM scheduling program helpful to the Engineers?
A: The Critical Path Method (CPM) scheduling program is an activity-oriented network program used for…
Q: 22, 26 Q3) A project involving the renovation of a parking underway. In a weekly progress meeting,…
A:
Q: Describe the steps taken for the development of inspection plan?
A: Inspection of any sort of work is an important parameter for ensuring its safety, performance and…
Q: Activity Duration (day) Predecessor (s) Act. A 2 Act. B 3 А Act. C 7 A Act. D 4 A Act. E 9. B,C Act.…
A:
Q: When does a Notice of Project need to be completed?
A: Beginning of the work When labor and material cost exceeds $50,000 When the trench is more than…
Q: request an extension or further information from the owner plan the assignment of resources and…
A: The purpose of a narrative is to provide a summary of the work, explain the plan for construction…
Q: What preparations can be made for close out project?
A: Project closure activities make sure the recording project documents, archiving in structure method…
Q: What are excuseable delays?
A: Excusable Delays are defined as the delays which are beyond the control of the contractor and cannot…
Q: Homework2: Answer all of the following points by using PERT technique? 1- Draw the network diagram…
A: To determine: The network diagram and the critical path. The probability of completing the project…
Q: What are the advantages of CPM scheduling technique?
A: The critical path method (CPM) is the most commonly accepted scheduling technique and it is also…
Q: B. Provide the correct code or numbering for the following work items in accordance with CESMM3. S/…
A: CESMM3 is abbreviated as CivilEngineering Standard Method of Measurement. This method used to…
Q: Write the five basic project planning steps when setting up a CPM Schedule?
A: Critical path is defined as the path when the duration of activities along this paths adds up to…
Q: Schedule the information of a project shown below by using: 1. Bar-chart method. 2. Time- grid…
A:
Q: 6: A project schedule has the following characteristics as shown in Table: (14) I, Construct PERT…
A: 1)
Q: Homework2: Draw the network diagram by using AOA technique for the following activities, define the…
A: NOTE - Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the…
Q: Drainage project is being implemented for installing 100 pipes. The duration of this project is one…
A: NOTE - Hi! Thank you for the question As per the honor code we’ll answer the first 3. Please…
Q: In preparing a construction estimate, the project team uses the construction cost indexes as given…
A: Given Similar project at city D Project cost = 3598987 ,. 3 years ago Index is given for 3 year…
Q: 2. CarpetPlus sells and installs floor covering for commercial buildings. Brad Sweeney, CarpetPlus…
A: In order to employ this strategy, simply the costs of all feasible tasks must be understood. A…
Q: Draw the network diagram of the following information: a. At the start of the project, each of 3…
A: From the given information, there is no activity following C, which indicates a dummy activity and…
Q: Wetax L(2) ひ S(2) R(2) F18) A(3) I (3) B) DM) KU) O(6) G3) TA) NG)
A: Solution There are the solution of remaining part
Q: Question 48 schedule is a schedule in which the resources for a project are assigned to activities…
A: Resource loaded
Q: 4-5 4-6 5-7 6-7| 6-8 6-9 7-9 8-9 6. Activity 1-2 1-3 2-4 3-4 3-6 3-8 Duration 10 14 11 5 15 20 8 12…
A: critical path is the path which consumes maximum time.path-1;1-2-4-5-7-9time…
Q: NORMAL CRASH COST PER ES LS EF LF TF FF REMARKS ACTIVITY TIME TIME DAY TO CRASH 9,700 8,000 A 3 1 7…
A:
Q: Question 1: a) Draw the Activity-on-Arrow (A-o-A) network using the activity dependency table given…
A:
Q: H.W(1):- Draw Gantt chart for the following project and determine the duration of the project…
A:
Step by step
Solved in 2 steps with 1 images
- develop a WBS for your assumed building project. Mention duration for each activity of your project and total completion time. Explain with examplesA contract to build a 2-storey residential building is awarded to you. A Notice to Proceed (NTP) is given to you in 7 days. List down at least 10 activities you are going to do to start the project on time and explain each relevant activity.build the sequence to be followed for preparing estimate of project work for 3 ph load
- A. Create the Network Diagram for the project . B . Identify the critical path and the minimum duration to complete the whole project ? C . Assume that it took 5 weeks to choose an architect , what is the effect on project completion date ? D. Draw Gantt chart .,4 A fence 18 feet by 18 feet is being built for $72,000.00 in 4 weeks. During week 2, 30’ feet has been completed and & $36,000.00 has been spent. Calculate the following:• Estimate to Completion (ETC) • Variance at Completion (VAC)• To Complete Performance Index (TCPI).What preparations can be made for close out project?
- Develop a programming budget estimate for a 100,000 square-foot warehouse, assuming a square-foot cost factor of $60 per square foot. The site will be about 200,000 square feet with a site development cost of $3 per square foot. Use the following allowances to prepare your budget estimate: - Owner-furnished FFE: $1,000,000 - Owner soft costs: $800,000 - Programming fees: $50,000 - Geotechnical Investigation: $390,000Draw the activity-on-node (AON) project network associated with the following activities for Habib and Sons construction project. How long should it take Habib and his teamto complete this project? What are the critical path activities? Activity Duration PredecessorsA 3 -B 4 AC 6 AD 6 BE 4 BG 4 CH 6 DI 8 E, FRequired: Draw the Network Diagram Calculate the total project duration Identify the critical pathPrepare a typical bay estimate based on the following information: a. Bay size of 350 feet and a building perimeter of 1,100 feet. b. There are 50 bays in the building. c. Unit prices: • Concrete piles: $950.00 each • Concrete pile caps: $725.00 each • Slab-on-grade: $12.50 per sq. ft. • Structural steel frame: $4.90 per sq. ft. • Roof structure: $10.75 per sq. ft. • Roofing: $8.20 per sq. ft. • Plumbing & HVAC: $9.80 per sq. ft. • Electrical: $6.10 per sq. ft. • Exterior foundations: $100.00 per linear ft. • Exterior walls: 728.00 per linear ft.
- Prepare a primavera schedule any project of your choice and show A) Lag B) Start To Start Relationship (S.S) C)Finish To Finish Relationship (F.F) Any where In the projectDetermine the probability that the project will take longer than 50 weeksWrite the five basic project planning steps when setting up a CPM Schedule?