During the early morning hours, customers arrive at a branch post office at an average rate of 45 per hour (Poisson), while clerks can handle transactions in an average time (exponential) of 4 minutes each. If clerk cost is $30 per hour and customer waiting time represents a "cost" of $20 per hour, how many clerks can be justified on a cost basis? Select one: O a. 3 O b. 6 O c. 4 O d. 5
Q: Prepare a list of selection criteria arranged in order of priority with reference to customer…
A: Selection criteria include all those essential pointers that are required and will help in the…
Q: The following Table 1 (below) contains a list of activities, with precedence requirements and crash…
A: Find the Given details below: Activity Predecessors Normal Time (NT) (Days) Normal cost (NC) ($)…
Q: locations while accounting for small local variations. Which strategy is your organization following…
A: Nowadays, globalization in combination with a greater degree of interconnections between persons…
Q: benefit of ultilising indoors space management
A: Space management is the practise of controlling & managing the various physical workspaces a…
Q: b. Forward Thinking Limited (FTL) has used a fixed-time period inventory system that involved taking…
A: Find the given details below: Given details: Item Number Annual Usage 1 10700 2 14100 3…
Q: Which of the following is not a fixed order cost? ( ) Administrative costs incurred to place an…
A: Fixed costs are the portion of the total cost that does not depend on the total volume of production…
Q: olve the following problem with Excel Solver: (Leave no cells blank be certain to enter "0" wherever…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Texas Petroleum Company is a producer of crude oil that is considering two drilling projects with…
A: There are two projects, and one project needs to be chosen. Apart from this, the utility indexes…
Q: What are 3/6 reasons listed for failure in Six Sigma?
A: Six Sigma is the quality tool that used by the organisations to improve the capability of the…
Q: What went wrong with the business?
A: When an enterprise started by 2 persons is incorporated into a company, the founders usually split…
Q: Explain in your own words at least 3 important reasons why need to study Productions and Operations…
A: Operations management can be broadly defined as an approach the involves the understanding of nature…
Q: Explain the statement. Manufacturers locate near their resources, retailers locate near their…
A: Proximity to the market stay as an important criterion in selecting a particular location for the…
Q: Define project management and with examples, explain why it is claimed that project management is…
A: The objective of project management is to manage and organize a project such that its stated goals…
Q: Which of the following is an outcome of keeping a constant level of production capacity while…
A: Which of the following is an outcome of keeping a constant level of production capacity while…
Q: Determine two (2) consequences of poor labour forecasting to the organization.
A: Forecasting: This is a scientific process of providing an estimate of a data value in the future…
Q: De Law Construction has a gotten some construction jobs to build some starter housing units in a few…
A: Simplify the given data to determine the due dates as shown below:
Q: 2. Sugarco can manufacture three types of candy bar. Each candy bar consists totally of sugar and…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: In time series analysis, how do the mean absolute percentage error, the mean squared error, and the…
A: Time series analysis can be defined as an analysis of a sequence of observations or data points that…
Q: Draw a network diagram for this process. What is the total expected time in hours for this recipe to…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: Valencia Products make automobile radar detectors and assembles two models: LaserStop and…
A: Given data is Objective function: Max Z=123L+138S Subject to constraints: 1.) 18L+11S≤30002.)…
Q: A Quality Analyst wants to construct a control chart for determining whether three machines, all…
A: Given data
Q: has the global economy affected the importance of cost estimation and cost cont
A: Economic, social, commercial, financial and communication interconnection across the world's bonders…
Q: In a management of technology framework list a set of KPIs (a minimum of six) for an implementation…
A: KPIs or Key Performance Indicators are certain metrics that are used to measure the performance of…
Q: d. What is XY Manufacturing Company optimal decision strategy? e. What is the expected value of the…
A: d. Optimal decision strategy if : Favourable - Manufacture as EV is higher Unfavorable -…
Q: Find the equation of a simple linear regression line using Excel, in the format of Y=a+bX. Keep two…
A: The regression equation is of the form Y=a+bx where: Y= dependent variable that is the quantity x=…
Q: mpetative advantage using Porter's Generic Strategy and Value Chain Analysis . Designate Appropriate…
A: The value chain model, developed by Harvard Business School professor Michael Porter in 1985,…
Q: What is resource capacity planning used to accomplish?
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: Complete the master productin schedule based on the following information: Week 1 2 3 4 5 6 7 8 9…
A: Find the Given details below: Given details Week 1 2 3 4 5 6 7 8 9 Forecast 320 100 30 110 40…
Q: Is there any value in having the option of using an FMS?
A: A manufacturing system that is adaptable to any changes or modifications made in the production…
Q: A company has a total of 3 factories to produce steel and iron. Every month, the company must meet…
A: Cost is in pounds
Q: Given the following forecast and cost information, determine Production Costs the total cost of a…
A: Total cost = regular cost+overtime cost+subcontracting cost Given regular cost 50 overtime…
Q: The moving average forecast method should only be used with time series data demonstrating a linear…
A: A moving average, which is indeed the average of any subset of values, is a method for gaining a…
Q: Problem 13-8 (Algo) A shirt manufacturer buys cloth by the 100-yard roll from a supplier. For…
A: From the given information, Average irregularities, c bar =Total irregularities ÷sample size…
Q: The LP model and output below represent a problem whose solution will tell a specialty retailer how…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: Howard Weiss, Inc., is considering building a sensitive new radiation scanning device. His managers…
A: Probability = 0.40 Expected profit without suit = $40000 Expected profit with suit =$ 20000…
Q: Describe briefly the steps taken for a Competition for Market Shareand Profits?
A: Market share is the total product sold by the company(total sales) in comparison to the total sales…
Q: C. Calculate the slack for each activity. (Enter your responses as integers.) Activity ABCDE Slack…
A: Slack time is the available free time for adjust the starting and ending of an activity which does…
Q: 15) Research clearly indicates that when team members have experienced positive psychosocial…
A: Research results or outcomes can be stated as the outcomes and conclusions arrived at as the outcome…
Q: The prices for traveling between five cities in Colorado by bus are given in the table below. Use…
A: Find the Given details below: Given details: From To Boulder Denver Colorado Springs Grand…
Q: What is resource capacity planning used to accomplish?
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: The LP model and output below represent a problem whose solution will tell a specialty retailer how…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: The company has four excavators, located one each, at each of its four facilities. The excavators…
A: This is an assignment problem wherein we need to assign 1 excavator to each site and keep the…
Q: The following table contains the demand from the last 10 months. Calculate the exponential smoothing…
A: Given: An initial trend forecast (T1) = 1.00 An initial exponentially smoothed forecast (F1) = 30.…
Q: The following table contains the demand from the last 10 months. Calculate the single exponential…
A: The general formula of exponential smoothing: forecast = actual demand of previous period…
Q: Explain in depth the conflicting issue associated with the use of all revenue generation models and…
A: Ecommerce is a platform that has gained a lot of popularity in recent years. Today, it has become…
Q: Exhausting Enterprises is an auto parts supplier that delivers ordered parts to neighboring…
A: Lead time = 2 days Average daily demand μ= 0.8 Average daily demand follows the Poisson…
Q: Great Harvest bakery distributes an average of 1,000 breads per day to local stores and restaurants.…
A: Safety stock is a stock that company hold and store for the emergency during shortage.
Q: What is online analytical processing (OLAP), and how is it used?
A: Online analytical processing or commonly known as OLAP , is a technology that would organize large…
Q: The materials handling manager of a manufacturing company is trying to forecast the cost of…
A: Given data is
Q: What are some instances of how project management and software project management are dissimilar?
A: Project management for software differs significantly from conventional project management in a few…
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 7 images
- Give typed full explanation In an M/D/2 system, a. the service time is exponentially distributed, b. the service time is a constant, c. the interarrival time is exponentially distributed, d. the interarrival time is a constantAmanda Fall is starting up a new house painting business, Fall Colors. She has been advertisingin the local newspaper for several months. Based on inquiries and informal surveys of the localhousing market, she anticipates that she will get painting jobs at the rate of four per week(Poisson distributed). Amanda has also determined that it will take a four-person team ofpainters an average of 0.7 week (exponentially distributed) for a typical painting job. Determine the number of teams of painters Amanda needs to hire so that customers will have to wait no longer than 2 weeks to get their houses painted.Please do not give solution in image formate thanku During the early morning hours, customers arrive at a branch post office at an average rate of 57 per hour (Poisson), while clerks can provide services at a rate of 19 per hour. If clerk cost is $50.14 per hour and customer waiting time represents a cost of $46 per hour, how many clerks can be justified on a cost basis a. 8 b. 4 c. 7 d. 6 e. 5
- During the early morning hours, customers arrive at a branch post office at an average rate of 45 per hour (Poisson), while clerks can handle transactions in an average time (exponential) of 4 minutes each. Find: (a) The average number of customers waiting for service if 5 clerks are used. (b) The minimum number of clerks needed to keep the average waiting time in the system to under 5 minutes. (c) If clerk cost is $40 per hour and customer waiting time represents a “cost” of $30 per hour, how many clerks can be justified on a cost basis? Please show work.11. Leo manages a receiving station for rice. Farmers deliver their loads of rice from 7 am to 7 pm. Leo can process them at a rate of 4.5 tons an hour, and on a heavy day, a total of 96 tons can be expected. The station has room to hold only 15 tons of rice in inventory prior to processing. Once this space is filled, the farmers’ trucks must wait to dump their contents. What is the throughput (flow) rate after 7 pm (in tons/hr)?From 3:00 P.M. to 8:00 P.M. the local Big-W Supermarket hasa steady arrival of customers. Customers finish shopping andarrive at the checkout area at the rate of 80 per hour (Poissondistributed). It is assumed that when customers arrive at thecash registers they will divide themselves relatively evenly sothat all the checkout lines are even. The average checkouttime at a register is seven minutes (exponentially distributed).The store manager’s service goal is for customers to be out ofthe store within 12 minutes (on average) after they completetheir shopping and arrive at the cash register. How many cashregisters must the store have open in order to achieve themanager’s service goal?
- The Waterfall Buffet in the lower level of the National ArtGallery serves food cafeteria-style daily to visitors andemployees. The buffet is self-service. From 7:00 A.M. to9:00 A.M. customers arrive at the buffet at a rate of eight perminute; from 9:00 A.M. to noon, at four per minute; fromnoon to 2:00, at 14 per minute; and from 2:00 P.M. to closing at 5:00 P.M., at eight per minute (Poisson distributed).All the customers take about the same amount of time toserve themselves and proceed to the buffet. Once a customer goes through the buffet, it takes an average of0.4 minute (exponentially distributed) to pay the cashier.The gallery does not want a customer to have to wait longerthan four minutes to pay. How many cashiers should beworking at each of the four times during the day?1. Calculate the average customer arrival rate and service rate per hour. 2. Calculate the probability of zero patients in the system (P0), probability of one patient (P1), and probability of two or more patients simultaneously arriving during the night shift. 3. Using a criterion that if the probability is greater than 1 percent, a backup OR team should be employed, make a recommendation to hospital administration. I'm not sure how to find the answers to the empty boxes.RideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods with plenty of potential customers. With one lot, it has eight cars. Theinterarrival time of potential demand for this lot from its base of customers is 40 minutes.The average rental period is five hours. If a customer checks availability of vehicles in thislot online and finds that they are all rented for the desired time, the customer skips rentingand finds alternative arrangements. However, because customers pay a monthly fee tosubscribe to this service, RideShare does not want customers to be disappointed too often.a. What is the offered load?b. What is the implied utilization?c. What is the capacity of the process (rentals per hour)?d. What is the probability that all eight cars are rented at the same time?e. How many customers are served every hour?f. What is the utilization of the cars?g. How many cars should it have in this lot to ensure that it serves at least 90 percent ofdemand?
- Agan Interior Design provides home and office decorating assistance to its customers. In normal operation, an average of 2.1 customers arrive each hour. One design consultant is available to answer customer questions and make product recommendations. Agan's management would like to evaluate two alternatives: Use one consultant with an average service time of 8 minutes per customer. Expand to two consultants, each of whom has an average service time of 10 minutes per customer. If the consultants are paid $18 per hour and the customer waiting time is valued at $26 per hour for waiting time prior to service, should Agan expand to the two-consultant system? - No What is the total cost for each scenario? Round your answers to the nearest cent. The total cost for the first scenario where there is one consultant with an average service time of 8 minutes per customer is $____________. The total cost for the second scenario where there are two consultants with an average service time of 10…Agan Interior Design provides home and office decorating assistance to its customers. In normal operation, an average of 2.6 customers arrive each hour. One design consultant is available to answer customer questions and make product recommendations. The consultant averages 10 minutes with each customer. (a) Compute the operating characteristics of the customer waiting line, assuming Poisson arrivals and exponential service times. (Round your answers to four decimal places. Report time in hours.) ?=?=Lq=L=Wq= hW= hPw= (b) Service goals dictate that an arriving customer should not wait for service more than an average of 5 minutes. Is this goal being met? (Round your answer to one decimal place.) Wq (in minutes) = min, which is than the desired wait time, so the goal met. What action do you recommend? (Select all that apply.) Increase the mean service rate.Decrease the mean service rate.There is no need to change the current operating parameters.Hire another…An M/M/4 system has an arrival rate of 15 customers per hour. Each server has a service rate of 7 customers per hour. What is the utilization factor for this system? (Round your answer to 3 decimal place.) If all servers are kept busy, how many services will be completed per hour? (Round your answer to the nearest whole number.)