Factory overhead (including an allowance of P300 for spoiled work) Josh Inc. has completed the Job 101, containing 2,200 shoes, during 2016 at Problem 10: Spoiled Goods the following unit costs: Direct materials Direct labor 2,000 1,000 1,300 Final inspection of Job 101 disclosed 200 spoiled shoes which were sold to a department for P400,000.
Q: SMALL COMPANY electric drills to the exact specifications of various customers. During April 2020,…
A: Job costing is a method of costing in which all costs are assigned and calculated on the basis of…
Q: ne 2021, at the following costs per pair: Materials, P80; Labor, P50; and Overhead (125% of direct…
A: ln cost accounting, the cost are allocated to the product to reach out at the profit. there can be…
Q: Tools Company manufactures electric drills to the exacting specifications of various customers.…
A: “Since you have asked multiple question, we will solve the first question for you. If you want any…
Q: Fee Co. had a production run of 8,000 pairs of slacks during the last week of June, at the following…
A: 1. Particulars Units Production Cost Production cost per unit: 8,000 904,000 Material 50…
Q: Toys World started and finished job number A26, a batch of 1000 cuddly koalas, during March 2020.…
A: a. To record the journal entries for Job A26 Working notes: Cost of goods sold= (5,826 ÷ 1,000) ×…
Q: Philantro Metal Shop, manufactures metal products that require casting, such as engine blocks,…
A: The question is related to determination of Selling price of good units if the spoilage is…
Q: 5. VVV Co. manufactures electric motor drills. During July 2020, Job 007 for the production of 600…
A: 1.Computation of total cost transferred to finished goods inventory: •Calculate the total…
Q: Items 15 and 16 are based on the following data: SOL COMPANY's Job 501 for the manufacturing of…
A: SOLUTION- SPOILAGE IS A WASTAGE OR LOSS OF MATERIAL THAT OCCURS DURING THE MANUFACTURING PROCESS.
Q: Guess Apparel completed 3,600 expensive bags during the 1st quarter of the current year. The…
A: In this Question, we have to calculate the amount of bill to the customer and the gross profit on…
Q: A manufacturing Company started 1,500 units in process on the job order #2003. The prime cost placed…
A: Cost of production represents the cost incurred by the company in the production process of the…
Q: Blue Co.'s Job 405 for the manufacture of 2,200 wagons was completed during August at the unit costs…
A: Here in this question, we are required to calculate unit cost of goods. When spoilage loss…
Q: Big Company manufactures electric drills to the exact specifications of various customers. During…
A: Total Original costs = Total cost per unit x no. of units = P30 x 1100 units = P33,000
Q: Required: a) Prepare journal entries to record the incurrence of production costs, completion of job…
A: Given information is: Toys World started and finished job number A26, a batch of 1,000 cuddly…
Q: Swifty Manufacturing produces industrial light fixtures. For the year, management estimated that…
A: Percent of cost of goods sold before adjustment of overapplied overhead =…
Q: V Company completed 375 units of customized jewelry. The product cost per unit:…
A: Total sales revenue = Sales revenue of spoiled goods + Sales revenue
Q: Factory overhead, included P10 allowance for spoilage 180 Final inspection revealed that 600 bags…
A: The cost of production includes all the costs that are incurred while producing a particular good…
Q: SitChairwn Company manufactures chairs to the exacting specifications of various customers. During…
A: It is assumed that all these were normal losses.
Q: 1. Big Company manufactures electric drills to the exact specifications of various customers. During…
A: Total Original costs = Total cost per unit x no. of units = P30 x 1100 units = P33,000
Q: Google Co. completed 3,600 expensive ladies bags during the last quarter of the current year. The…
A: Billing Price: After subtracting any trade discounts and quantity discounts from the list price, the…
Q: Zozibini Company completed 5,000 units of customized souvenir items.…
A: Units that are not sold remain in ending inventory.
Q: Toys World started and finished job number A26, a batch of 1,000 cuddly koalas, during March 2020.…
A: a. journal entries to record the incurrence of production costs, completion of job…
Q: Job 456 manufactured 12,000 units that were completed in February at unit costs presented as…
A:
Q: What is the unit cost of the goods transferred to storeroom if the rework costs are charged to the…
A:
Q: A job order for 500 units of children's party gievaways were processed with costs P80,000 and…
A: Factory Overhead cost = Direct labor x 50% = 30000 x 50% = 15000
Q: The manager at Rainbow International prepares a Cost of Quality report to report the following…
A: Every business wants to improve its process with effectiveness and efficiency. This is due to…
Q: ProInc, has completed the Job 101, containing 2,200 shoes, during 2016 at the following unit costs:…
A: Introduction In job costing if there is an spoilage which is normal then such spoilage is commonly…
Q: A job order for 500 units of children's party giveaways were processed with costs of P80,000 and…
A: Introduction: Cost of goods sold: Cost of goods sold can be defined as the production cost incurred…
Q: C Company has underapplied factory overhead of P45,000 for the year ended December 31, 2008. Before…
A: Total of appropriate inventories and cost of goods sold = Work in process + Finished goods + Cost of…
Q: For numbers 6 to 8 Best Curtains, Inc. spent P350,400 including applied overhead on a job order of…
A: The sale proceeds of defective goods reduces the total cost of manufacture.
Q: Toys World started and finished job number A26, a batch of 1,000 cuddly koalas, during March 2020.…
A: Job costing includes the aggregation of the expenses of materials, overhead and labor for a…
Q: Determine the overhead application rate for 2010. b. Determine the cost for Job #B316 in 2010. c.…
A: “Since you have posted a question with many sub-parts, we will solve three sub-parts for you. To get…
Q: Jack Company's production report for Job #901 showed that 5 vehicle parts out of 100 vehicle parts…
A: Job costing is a method of costing that is designed to keep a track of the cost, of individual…
Q: Big Company manufactures electric drills to the exact specifications of various customers. During…
A: Job costing is a method of costing in which all costs are assigned and calculated on the basis of…
Q: ABC Company manufactures chairs to the exacting specifications of various customers. During January…
A: Defective cost are reworked and sold as normal units so it should be included in net total units…
Q: How much is the amount charged to factory overhead control?
A: P 315000 will be charged to Factory Overhead Control.
Q: Harper Company's Job 301 for the manufacture of 2,200 T-shirts was completec during August 2014 at…
A: SOLUTION- SPOILAGE IS A UNUSABLE MATERIAL THAT IS PRODUCED AS A PART OF THE MANUFACTURING PROCESS.
Q: NIKE Inc. has completed the Job 101, containing 1,100 shoes, during 2016 at the following unit cost:…
A: Job costing, instead of operation costing, would be a way to record the costs of a production job. A…
Q: Assume that the defective goods were charged to all jobs, what is the cost ransferred to finish…
A: Overhead means the cost incurred indirect in factory for the production of goods. Job costing means…
Q: Legacy Company completed 200 units of customized jewelry. The product cost per unit:…
A: Manufacturing overhead: It is the indirect cost incurred as a part of manufacturing the products.…
Q: Luke Co. completed 3,600 expensive ladies bags during the last quarter of the current year. The…
A: As multiple independent questions are posted, the solution for the first question would be provided.…
Q: Direct Labor 180 Factory overhead, included P10 allowance for spoilage 180 Final inspection…
A: Cost of production(COP) refers to material, labours and overheads incurred during production.
Q: During August of the current year, Job 067 for 2,000 handsaws was completed at the following cost…
A: Internal failure costs : Internal failure costs are costs that are caused by products or services…
Q: GYM Machine Shop manufactures jacks equipment. One order comes from Muscle, Inc. for 2,000 jacks,…
A: GYM Machine shop manufactures jacks equipment. One order comes from Muscle Inc. = 2000 jacks Cost…
Q: ABC Company’s Job 123 for the manufacture of 2,000 bags was completed during June 2022 at the…
A: Total manufacturing costs of a job includes direct material costs, direct labour costs and factory…
Q: Direct materials Direct labor Applied factory overhead P10 8 12 P30 Total Final inspection of Job…
A: Total Original costs = Total cost per unit x no. of units = P30 x 1100 units = P33,000
Q: Toys World started and finished job number A26, a batch of 1,000 cuddly koalas, during March…
A: A journal entry is the recording of financial transactions in books of the business entity. It…
Q: Toys World started and finished job number A26, a batch of 1,000 cuddly koalas, during March 2020.…
A: 1. Following are the journal entries:
Q: Pineapple Corporation manufactures custom-made bags. The following data pertains to Job PA8: Direct…
A: Solution Predetermined overhead rate = Estimated overhead / Estimated direct labor hours = $125,000…
1. What is the unit cost of shoes produced on Job 101 if spoilage loss is common to all jobs?
2. What is the unit cost of shoes produced on Job 101 if spoilage loss is charged to specific Job 101?
Step by step
Solved in 2 steps
- Spoiled work Roger Company manufactures tennis clothing. During the month, the company cut and assembled 8,000 skirts. One hundred of the skirts did not meet specifications and were considered seconds. Seconds are sold for 9.95 per skirt, whereas first-quality skirts sell for 39.95. During the month, Work in Process was charged 108,000: 36,000 for materials, 48,000 for labor, and 24,000 for factory overhead. Record the entries to first charge production costs for the period and to then record the loss due to spoiled work, under each of the following conditions: a. The loss due to spoiled work is spread over all jobs in the department. b. The loss due to spoiled work is charged to the specific job because it is a special order.Harper Company’s Job 301 for the manufacture of 2,200 t-shirts was completed during August 2020 at the following unit costs: Direct materials P 20.00 Direct labor 18.00 Factory overhead (includes an allowance of P1 for spoiled work) 18.00 P 56.00 Final inspection of Job 301 discloses 200 spoiled t-shirts which were sold to a jobber for P6,000. Assume that spoilage loss is charged to all production during August. What would be the unit cost of the goods produced on Job 301? Assume that spoilage loss is attributable to exacting specification of Job 301 and is charged to this specific job. What would be the unit cost of the goods produced on Job 301?NIKE Inc. has completed the Job 101, containing 1,100 shoes, during 2016 at the following unit cost:Direct materials 2,000Direct labor 1,000Factory overhead (including an allowance of P300 for spoiled work) 1,300 Final inspection of Job 101 disclosed 100 spoiled shoes which were sold to a department for P200,000.1. What is the unit cost of good shoes produced on Job 101 if spoilage loss is charged to allproduction?A. 4,000B. 4,100C. 4,400D. 4,3002. What is the unit cost of good shoes produced on Job 101 if spoilage loss is charged to specificJob 101?A. 4,300B. 4,000C. 4,500D. 4,200
- Big Company manufactures electric drills to the exact specifications of various customers. During April 2020, Job 403 for the production of 1,100 units was completed at the following costs per unit: Direct materials P10 Direct Labor 8 Applied factory overhead 12 Total P30 Final inspection of Job 403 disclosed 59 defective units and 100 spoiled units. The defective units were reworded at a total cost of P500., and the spoiled units were sold to an employee for P1,500. What would be the unit cost of the good units produced on Job 403?Simar Company’s Job 888 manufactured 13,750 units that were completed in February at unit costs presented as follows: Direct materials P300 Direct labor 270 Factory overhead (includes an allowance of P15 Spoiled work) 270Final inspection of Job 888 disclosed 1,250 spoiled units, which were sold for P225,000.What would be the unit cost of good units if the spoilage loss is attributable to exacting specifications of Job 004?Samar Company’s Job 888 manufactured 13,750 units that were completed in February at unit costs presented as follows: Direct materials P300 Direct labor 270 Factory overhead (includes an allowance of P15 Spoiled work) 270Final inspection of Job 888 disclosed 1,250 spoiled units, which were sold for P225,000.What would be the unit cost of good units if the spoilage loss is attributable to exacting specifications of Job 004? a. 840 b. 889.50 c. 825 d. 862.50
- SMALL COMPANY electric drills to the exact specifications of various customers. During April 2020, Job 403 for the production of 1,100 units was completed at the following costs per unit: Direct materials P10Direct labor 8Applied factory overhead 12Total P30 The final inspection of Job 403 disclosed 59 defective units and 100 spoiled units. The defective units were reworded at a total cost of P500, and the spoiled units were sold to an employee for P1,500. If the spoilage is attributable to Job 202 only, what is the unit selling price of the good units? (round off to the nearest centavo)ABC Company’s Job 123 for the manufacture of 2,000 bags was completed during June 2022 at the following unit costs:· Direct Materials, P20· Direct Labor, P18· Overhead (including allowance of P1 for spoiled work), P18 Final inspection of Job 123 disclosed 100 spoiled bags which were sold to an online store for P1,985. Determine the total cost of completed units.Big Company manufactures electric drills to the exact specifications of various customers. During April 2020, Job 403 for the production of 1,100 units was completed at the following costs per unit: Direct materials 10 Direct labor 8 Applied factory overhead 12 Total 32 Final inspection of Job 403 disclosed 59 defective units and 100 spoiled units. The defective units were reworded at a total cost of P500, and the spoiled units were sold to an employee for P1,500. If the spoilage is attributable to Job 202 only, what is the unit selling price of the good units? (round off to the nearest centavo) Big Company manufactures electric drills to the exact specifications of various customers. During April 2020, Job 403 for the production of 1,100 units was completed at the following costs per unit: Direct materials 10 Direct labor 8 Applied…
- Big Company manufactures electric drills to the exact specifications of various customers. During April 2020, Job 403 for the production of 1,100 units was completed at the following costs per unit: Direct materials 10 Direct labor 8 Applied factory overhead 12 Total 32 Final inspection of Job 403 disclosed 59 defective units and 100 spoiled units. The defective units were reworded at a total cost of P500, and the spoiled units were sold to an employee for P1,500. If the spoilage is attributable to Job 202 only, what is the unit selling price of the good units? (round off to the nearest centavo)Zea Company’s Job 888 manufactured 13,750 units that were completed in February at unit costs presented as follows: Direct materials $300 Direct labor 270 Factory overhead (includes an allowance of P15 Spoiled work) 270Final inspection of Job 888 disclosed 1,250 spoiled units, which were sold for $225,000.What would be the unit cost of good units if the spoilage loss is attributable to exacting specifications of Job 004?Integrity Company’s Job 1088 manufactured 13,750 units that were completed in February at unit costs presented as follows:Direct materials- P300Direct labor- 270Factory overhead (includes an allowance of P15 spoiled work)- P270Final inspection of Job 1088 disclosed 1,250 spoiled units, which were sold for P225,000.What would be the unit selling price if the spoilage is attributable to exacting specifications of Job 1088 and the entity maintain a gross profit of 50%?