field measuring 45 m x 90 m is to be prepared using 1-m upland power tiller at a  speed of 3 kph. Assume 10% overlap between passings and 9 seconds turn around  each time at the end of each pass. Determine the actual field capacity when tilling is  done along the longer field direction.    Do not round off during computation, do not round your final answer, write all the decimals.  Use 745.7 w/ HP and G = 9.806 M/S

Principles of Foundation Engineering (MindTap Course List)
8th Edition
ISBN:9781305081550
Author:Braja M. Das
Publisher:Braja M. Das
Chapter14: Sheet-pile Walls
Section: Chapter Questions
Problem 14.9P
icon
Related questions
Question

A field measuring 45 m x 90 m is to be prepared using 1-m upland power tiller at a 
speed of 3 kph. Assume 10% overlap between passings and 9 seconds turn around 
each time at the end of each pass. Determine the actual field capacity when tilling is 
done along the longer field direction. 

 

Do not round off during computation, do not round your final answer, write all the decimals. 
Use 745.7 w/ HP and G = 9.806 M/S

Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Wind energy
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning