Find the expected production in loose cubic meters (LCM) per hour of a large hydraulic excavator. Heaped bucket capacity is 2.05 m3. The material is sand and gravel with a bucket fill factor of 0.95. Job efficiency is 46 min/h. Average depth of cut is 2.5 m. Maximum depth of cut is 5.0 m and average swing is 90 degrees.

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter7: Seepage
Section: Chapter Questions
Problem 7.7CTP
icon
Related questions
Question
Find the expected production in loose cubic
meters (LCM) per hour of a large hydraulic
excavator. Heaped bucket capacity is 2.05 m3.
The material is sand and gravel with a bucket fill
factor of 0.95. Job efficiency is 46 min/h. Average
depth of cut is 2.5 m. Maximum depth of cut is
5.0 m and average swing is 90 degrees.
Transcribed Image Text:Find the expected production in loose cubic meters (LCM) per hour of a large hydraulic excavator. Heaped bucket capacity is 2.05 m3. The material is sand and gravel with a bucket fill factor of 0.95. Job efficiency is 46 min/h. Average depth of cut is 2.5 m. Maximum depth of cut is 5.0 m and average swing is 90 degrees.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Measuring sitework, excavation and piling
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning