In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80 percent of effective output. What design capacity would be needed to achieve an actual output of eight jobs per week?
Q: - What will the process capacity be, if one additional worker was added to the bottle process…
A: Process capacity indicating the maximum production capability of a process, if the management ready…
Q: If a plant has an effective capacity of 6,400 and an efficiency of 88%, then its actual (planned)…
A: Given data is Effective capacity = 6400 Efficeincy = 88%=0.88
Q: In a service process such as the checkout counter in a discount store, a good target for capacity…
A: Answer given below:
Q: e) How much total idle time is present each cycle? f ) What is the efficiency of the assembly line…
A: Below is the solution
Q: A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two…
A: The Break-even point for each unit is calculated by the following formula. Ans 1: Given data for…
Q: A product line manufacturing shoes has five stations in series whose individual capacities per shift…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: Explain Capacity Planning Concepts with an example?
A: Capacity planning is defined as a method of measuring the capacity of planning so that the firm can…
Q: A process currently services an average of 50 customers perday. Observations in recent weeks show…
A: Capacity requirement is the one which dealt with the amount of services or information which could…
Q: A manufacturing shop is designed to operate most efficiently at an output of 550 units per day In…
A: A product is a tangible substance that is offered in the market to satisfy the desire or requirement…
Q: NorSal Trondheim operates a salmon processing facility where fish are purchased from local sources…
A: Note: - Since we answer up to 3 subparts, we will answer questions 1,2 and 3. Please resubmit the…
Q: A computer repair service has a design capacity of 80 repairs per day. Its effective capacity,…
A: Design capacity (DC) = 80 repairs per day Effective capacity (EC) = 64 repairs per day Output per…
Q: If a plant has an effective capacity of 6,500 andan efficiency of 88%, what is the actual (planned)…
A: A product is a tangible substance that is offered in the market to satisfy the desire or requirement…
Q: me, how does capacity analysis react?
A: There is a limit to how much can be produced in a given day in manufacturing and industrial…
Q: Collins Little Company has a staff of 4 employees, each working 8 hours per day at a rate of…
A: a) Determine the labor productivity with the old system:
Q: Dr. Gulakowicz is an orthodontist. She estimates that adding two new chairs will increase fixed…
A: Given data Increased fixed cost = $147000 Expected additional revenue brought by the patient =…
Q: If a workstation can produce 1000 units in 100 hours and the actual workstation efficiency is only…
A: If , the workstation can produce 1000 units in 100 hours, then the standard output rate for 2000…
Q: Manager must decide how many machines of a certain type to purchase. Each machine can process 100…
A: The Break-even point is the point at which the production cost and production revenue are equal for…
Q: A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two…
A: The break-even analysis helps businesses in decision-making in the following ways: Helps in…
Q: In a short essay, Suppose that you are opening a new restaurant. Describe the capacity analysis of…
A: Capacity Analysis is the way toward recognizing the accessible capacity with regards to your…
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For…
A: The manager is the person who is accountable for all the things that are happening in the…
Q: In an essay, suppose you are opening up an an Applesbee's restaurant. describe the capacity…
A: While these things are significant, there is one basic factor missing from this rundown which…
Q: A newly opened bed-and-breakfast projects the following: Monthly fixed costs Variable cost per…
A: Break-even analysis helps in determining the minimum levels of sales which is required to cover the…
Q: The manager of a car wash must decide whether to have one or two wash lines. One line will mean a…
A:
Q: a. Determine each alternative’s break-even point in units. (Round your answer to the nearest whole…
A: Alternative A:Annual Fixed Cost = $ 39,000Variable Cost = $ 10Revenue = $ 15 Alternative B:Annual…
Q: If a plant has an effective capacity of 6,400 and an efficiency of 88%, then its actual (planned)…
A: Effective capacity is the maximum measure of work that an association is capable of finishing in a…
Q: How do the concepts of capacity planning and scalability apply?
A: Capacity planning and scalability are important concepts in modern IT management, and knowing the…
Q: Describe in what ways does technology have an impact on capacity planning ?
A: The planning step is the process of forecasting required industrial production based on expected…
Q: If the firm operates 10 hours per day, 5 days per week, what is the weekly capacity of this work…
A: Weekly available time = 600 Minutes (10 hours) * 5 days = 3000…
Q: You have been asked to put together a capacity plan for a critical operation at the Surefoot Sandal…
A: Formula:
Q: The following diagram describes a service process where customers go through through either of two…
A: The lowest capacity is Operation 2, which is 10 per hour when compared operation 1, 2, and 3. The…
Q: An assembly line is to be designed for a product whosecompletion requires 21 minutes of work. The…
A: The correct option is C. No, it will fall short even with a perfectly balanced line. Assembly line…
Q: A process currently services an average of 50 customers per day. Observations in recent weeks show…
A: Consider the capacity requirement as X. Management wants to have a capacity cushion of 5%. Thus, the…
Q: Your company just purchased a CNC Router and the engineering design specs clearly state that the…
A: Utilization rate is the ratio of actual capacity to the installed capacity.
Q: A manager must decide between two machines. The manager will take into account each machine's…
A: Given: Projected operating time of machine A = 140 hours Projected operating time of machine B = 70…
Q: A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two…
A: Given data is Annual fixed costs of A = $39000 Annual fixed costs of B = $21000 Variable costs for…
Q: A manager has to decide how much to buy a certain type Each machine can handle 100 customer services…
A: Given data, Fixed cost for one machine = $ 2000 per day For two machines = $ 3800 per day Variable…
Q: Two different manufacturing processes are being considered formaking a new product. The first…
A: Process 1 (less capital intensive): Fixed Cost = $46,400 Variable Cost = $720 per unit Process 2:…
Q: A manufacturing shop is designed to operate most efficiently at an output of 550 units per day. In…
A: Capacity utilization rate is nothing but the process of calculating the percentage of the potential…
Q: Dr. Gulakowicz is an orthodontist. She estimates that adding two new chairs will increase fixed…
A: Fixed cost is the total cost that does not change with the change of production process of the…
Q: A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand…
A: Given, Weekly demand = 35 units Line operates for 7 hours per day and 5 days per week. Total…
Q: In an essay, suppose you are opening up an an Applebee's restaurant. describe short and long term…
A: Capacity is the greatest measure of work a bookkeeping practice is equipped for finishing in a given…
Q: A copy center in an office building prepares bound reports for two clients. The center makes…
A: Given information, Client X Annual Demand = 2000 Standard processing time = 0.5 Average lot size…
Q: a. Determine the break-even point for each range. h. If estimated demand is 90 to 120 customers per…
A: The breakeven point is the level of production where the costs of production are equal to the…
Q: In a service process such as the checkout counter in a discount store, what is a good target percent…
A: Companies must plan their capacities by considering the relationship between the quality of service…
Q: A process currently services an average of 61 customers perday. Observations in recent weeks show…
A: Current Average Customers per day= 61 customer Current Utilization = 90% Current Capacity Cushion=…
Q: What issues are important when changing capacity levels?
A: Determining the right capacity for different business units is essential for a company as it helps…
Q: Dr. Gulakowicz is an orthodontist. She estimates that adding two new chairs will increase fixed…
A: Break even point can be calculated as Break even = (fixed cost)/(selling price - variable cost)
In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80 percent of effective output. What design capacity would be needed to achieve an actual output of eight jobs per week?
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 1 images
- In a job shop, effective capacity is only 50 percent of design capacity, and actual output is80 percent of effective output. What design capacity would be needed to achieve an actual output c eight jobs per week?A small firm intends to increase the capacity of a bottleneck operation by adding a new machine.Two alternatives, A and B, have been identified, and the associated costs and revenues have beenestimated. Annual fixed costs would be $40,000 for A and $30,000 for B; variable costs per unitwould be $10 for A and $11 for B; and revenue per unit would be $15.b. At what volume of output would the two alternatives yield the same profit?A process currently services an average of 52 customers per day. Observations in recent weeks show that its utilization is about 90 percent, allowing for just a 10 percent capacity cushion. If demand is expected to be 85 percent of the current level in five years and management wants to have a capacity cushion of just 6 percent, what capacity requirement should be planned?
- A small firm intends to increase the capacity of a bottleneck operation by adding a new machine.Two alternatives, A and B, have been identified, and the associated costs and revenues have beenestimated. Annual fixed costs would be $40,000 for A and $30,000 for B; variable costs per unitwould be $10 for A and $11 for B; and revenue per unit would be $15.c. If expected annual demand is 12,000 units, which alternative would yield the higher profit?In a job shop, effective capacity is only 43 percent of design capacity, and actual output is 71 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs = (round to whole number)b. The Effective Capacity needed to achieve the required actual job outputs = (round to whole number)A process currently services an average of 50 customers per day. Observations in recent weeks show that its utilization is about 90 percent, allowing for just a 10 percent capacity cushion. If demand is expected to be 75 percent of the current level in five years and management wants to have acapacity cushion of just 5 percent, what capacity requirement should be planned?
- Dev A restaurant earns $3,950 in sales from 64 guests for Monday’s dinner. Four (4) back-of-the-house employees work the full three-hour dinner shift that night. What is the back-of-the-house team’s sales per person-hour rate? What is the back-of-the-house team’s covers per person-hour rate?A process currently services an average of 55 customers per day. Observations in recent weeks show that its utilization is about 90 percent, allowing for just a 10 percent capacity cushion. If demand is expected to be 85 percent of the current level in five years and management wants to have a capacity cushion of just 5 percent, what capacity requirement should be planned? Part 2 The needed capacity requirement is enter your response here customers per day. (Enter your response rounded up to the next whole number.)A process currently services an average of 61 customers per day. Observations in recent weeks show that its utilization is about 90 percent, allowing for just a 10 percent capacity cushion. If demand is expected to be 70 percent of the current level in five years and management wants to have a capacity cushion of just 5 percent, what capacity requirement should be planned? The needed capacity requirement is nothing customers per day. (Enter your response rounded up to the next whole number.)
- If a workstation can produce 1000 units in 100 hours and the actual workstation efficiency is only at 85%, what will be the approximate actual hours needed if the demand is 2,000 units?A small firm intends to increase the capacity of a bottleneck operation for producing a product by adding a new machine. Two alternatives, A and B, have been identified and the associated costs and revenues have been estimated. Annual fixed costs would be $30000 for A and $25,000 for B; variable costs per unit would be $10 for A and $12 for B; and the revenue per unit would be $25. i. Find the total cost functions for alternatives A and B, and the revenue function ii. Draw both the total cost functions and the revenue function in the same figure. iii. Find the break-even point for the alternatives A and B and show it in the figure iv. Is there any volume of output at which both the alternatives yield the same profit? If so, show it in the figure. If not, identify the volume of output at which the alternatives are indifferentA process currently services an average of 50 customers perday. Observations in recent weeks show that its utilizationis about 90 percent, allowing for just a 10 percent capac-ity cushion. If demand is expected to be 75 percent of thecurrent level in five years and management wants to have acapacity cushion of just 5 percent, what capacity requirementshould be planned?