It is planned to build a geothermal power plant for electricity generation purposes. The subsoil water reaches temperatures close to 170 ° C while the ambient temperature is 20 ° C. Find the maximum efficiency that a geothermal plant could aspire to if installed in that location.

Principles of Heat Transfer (Activate Learning with these NEW titles from Engineering!)
8th Edition
ISBN:9781305387102
Author:Kreith, Frank; Manglik, Raj M.
Publisher:Kreith, Frank; Manglik, Raj M.
Chapter6: Forced Convection Over Exterior Surfaces
Section: Chapter Questions
Problem 6.8P
icon
Related questions
Question
Practice Pack
It is planned to build a geothermal power plant for electricity generation purposes. The subsoil water reaches temperatures close to 170 ° C while the ambient temperature is 20 ° C. Find the maximum efficiency that a geothermal plant could aspire to if installed in that location.
 
Ans: η=33.85%
 
 
 
 
 
 
 
Expert Solution
video

Learn your way

Includes step-by-step video

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Convection
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Heat Transfer (Activate Learning wi…
Principles of Heat Transfer (Activate Learning wi…
Mechanical Engineering
ISBN:
9781305387102
Author:
Kreith, Frank; Manglik, Raj M.
Publisher:
Cengage Learning