Items are submitted for inspection in lots of size 12000 using ANSI/ASQC Z1.4 (a.k.a. MIL-STD-105-E). The acceptable quality level is 2.5% nonconforming. General inspection level III and a single sampling plan are used. Normal inspection is initiated at the start of the inspection of lot 1. The inspection results for 24 consecutive lots are as follows: 9 10 11 12 20 8 24 20 225 22 22 22 12 21 23 24 Lot 1 2 3 4 5 Nonconforming 24 14 22 17 10 items Lot 13 14 15 Nonconforming 17 88 54 155 16 17 66 7 18 68 18 19 20 21 72 14 18 20 21 18 27 225 12 17 items a) Use the switching rules listed in the lecture notes to determine the sampling plans and the types of inspection used for lots 2, 6, 13, 20, 22 and 24. State whether each one of lots 1-24 should be accepted or rejected. State the type of inspection that will be used for lot 25. b) Draw the OC curve for the single sampling plan that will be used for lot 25.

Auditing: A Risk Based-Approach (MindTap Course List)
11th Edition
ISBN:9781337619455
Author:Karla M Johnstone, Audrey A. Gramling, Larry E. Rittenberg
Publisher:Karla M Johnstone, Audrey A. Gramling, Larry E. Rittenberg
Chapter8: Specialized Audit Tools: Attributes Sampling, Monetary Unit Sampling, And Data Analytics Tools
Section: Chapter Questions
Problem 27RQSC
icon
Related questions
Question
Items are submitted for inspection in lots of size 12000 using ANSI/ASQC Z1.4 (a.k.a.
MIL-STD-105-E). The acceptable quality level is 2.5% nonconforming. General
inspection level III and a single sampling plan are used. Normal inspection is initiated at
the start of the inspection of lot 1. The inspection results for 24 consecutive lots are as
follows:
9
10 11
12 20 8
24
20
225
22 22
22
12
21
23 24
Lot
1
2
3
4
5
Nonconforming 24
14
22
17
10
items
Lot
13
14 15
Nonconforming 17
88
54
155
16
17
66
7
18
68
18 19 20 21
72
14 18 20 21
18
27
225
12 17
items
a) Use the switching rules listed in the lecture notes to determine the sampling plans
and the types of inspection used for lots 2, 6, 13, 20, 22 and 24. State whether
each one of lots 1-24 should be accepted or rejected. State the type of inspection
that will be used for lot 25.
b) Draw the OC curve for the single sampling plan that will be used for lot 25.
Transcribed Image Text:Items are submitted for inspection in lots of size 12000 using ANSI/ASQC Z1.4 (a.k.a. MIL-STD-105-E). The acceptable quality level is 2.5% nonconforming. General inspection level III and a single sampling plan are used. Normal inspection is initiated at the start of the inspection of lot 1. The inspection results for 24 consecutive lots are as follows: 9 10 11 12 20 8 24 20 225 22 22 22 12 21 23 24 Lot 1 2 3 4 5 Nonconforming 24 14 22 17 10 items Lot 13 14 15 Nonconforming 17 88 54 155 16 17 66 7 18 68 18 19 20 21 72 14 18 20 21 18 27 225 12 17 items a) Use the switching rules listed in the lecture notes to determine the sampling plans and the types of inspection used for lots 2, 6, 13, 20, 22 and 24. State whether each one of lots 1-24 should be accepted or rejected. State the type of inspection that will be used for lot 25. b) Draw the OC curve for the single sampling plan that will be used for lot 25.
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Auditing: A Risk Based-Approach (MindTap Course L…
Auditing: A Risk Based-Approach (MindTap Course L…
Accounting
ISBN:
9781337619455
Author:
Karla M Johnstone, Audrey A. Gramling, Larry E. Rittenberg
Publisher:
Cengage Learning
Pkg Acc Infor Systems MS VISIO CD
Pkg Acc Infor Systems MS VISIO CD
Finance
ISBN:
9781133935940
Author:
Ulric J. Gelinas
Publisher:
CENGAGE L