model requires: • 2000 ft of framing lumber • 6000 cubic feet of concrete • $4000 for advertising model requires: • 4000 ft of framing lumber • 6000 cubic feet of concrete • $6000 for advertising Contracts call for using at least 16000 ft of framing lumber, 36,000 cubic feet of concrete, and $30,000 worth of advertising. If construction cost for each Chelan shed is $40,000, and the construction cost for each Orondo shed is $30,000, how many of each model should be built to minimize construction costs? 1. The objective equation and constraints as inequalities. 2. A graph of the feasible region. Label each corner point labeled, or a list them. 3. The number of each model that should be build to minimize costs.

Algebra for College Students
10th Edition
ISBN:9781285195780
Author:Jerome E. Kaufmann, Karen L. Schwitters
Publisher:Jerome E. Kaufmann, Karen L. Schwitters
Chapter12: Algebra Of Matrices
Section12.CR: Review Problem Set
Problem 37CR
icon
Related questions
Question
model requires:
• 2000 ft of framing lumber
• 6000 cubic feet of concrete
• $4000 for advertising
model requires:
• 4000 ft of framing lumber
• 6000 cubic feet of concrete
• $6000 for advertising
Contracts call for using at least 16000 ft of framing
lumber, 36,000 cubic feet of concrete, and $30,000
worth of advertising. If construction cost for each
Chelan shed is $40,000, and the construction cost for
each Orondo shed is $30,000, how many of each
model should be built to minimize construction costs?
1. The objective equation and constraints as
inequalities.
2. A graph of the feasible region. Label each
corner point labeled, or a list them.
3. The number of each model that should be build
to minimize costs.
4. The minimum cost.
Transcribed Image Text:model requires: • 2000 ft of framing lumber • 6000 cubic feet of concrete • $4000 for advertising model requires: • 4000 ft of framing lumber • 6000 cubic feet of concrete • $6000 for advertising Contracts call for using at least 16000 ft of framing lumber, 36,000 cubic feet of concrete, and $30,000 worth of advertising. If construction cost for each Chelan shed is $40,000, and the construction cost for each Orondo shed is $30,000, how many of each model should be built to minimize construction costs? 1. The objective equation and constraints as inequalities. 2. A graph of the feasible region. Label each corner point labeled, or a list them. 3. The number of each model that should be build to minimize costs. 4. The minimum cost.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 1 images

Blurred answer
Recommended textbooks for you
Algebra for College Students
Algebra for College Students
Algebra
ISBN:
9781285195780
Author:
Jerome E. Kaufmann, Karen L. Schwitters
Publisher:
Cengage Learning
Linear Algebra: A Modern Introduction
Linear Algebra: A Modern Introduction
Algebra
ISBN:
9781285463247
Author:
David Poole
Publisher:
Cengage Learning
College Algebra
College Algebra
Algebra
ISBN:
9781337282291
Author:
Ron Larson
Publisher:
Cengage Learning
College Algebra (MindTap Course List)
College Algebra (MindTap Course List)
Algebra
ISBN:
9781305652231
Author:
R. David Gustafson, Jeff Hughes
Publisher:
Cengage Learning