Based on the following sensitivity report, how much should the firm be willing to pay for 160 more units of Resource_C? Variable Cells Final Objective Coefficient Allowable Allowable Cell Name Value Reduced Cost Increase Decrease $B$2 $B$3 $B$4 Product 1 -2 1E+30 Product 2 175 1E+30 Product_3 -1.5 9. 1.5 1E+30 Constraints Final Value Shadow Constraint R.H.Side Allowable Allowable Cell Name Price Increase Decrease $H$9 $H$10 $H$11 Resource A 100 1E+30 90 Resource B 525 800 1E+30 470 Resource C 700 1.77 700 180 78 (Round your answer to 2 decimal places.) Units of Resource C
Q: Dirac Manufacturers Co. plans to introduce a new type of shirt based on the following information:…
A: Selling price of shirt per unit (SP) = $ 57 Variable cost per unit (VC) = $18 Fixed cost = $7800…
Q: Yost-Perry Industries’ (YPI) senior management team wants to improve the profitability of the firm…
A: The theory of constraints recommends when the product was limited by the bottleneck, the best method…
Q: Mop and Broom Manufacturing is evaluating whetherto produce a new type of mop. Th e company is…
A:
Q: Which of the following are components of the compensation package for members of camera/drone PATS?…
A: Compensation package refers to the process combine the employee salary and fringe benefits by the…
Q: An urgent care clinic is staffed by two physicians who can each see four patients per hour. The…
A: a.
Q: 214 consider Problem 2.15 wVhere, in this case, each process is capable of rework. Given the…
A: Given, Process 1 3% 60% 2 5% 75% 3 7% 80%
Q: . After looking over the level production plan, David Griffin, vice president of manufacturing,…
A: Month Sales Forecast Sep 30,000 Oct 31,500 Nov…
Q: Mulungushi textiles during its peak days used to manufacture gowns on a produce-to-order basis. The…
A: Given data: Product Final assembly 1 2 3 4 5 6 A 25 200 150 200 250 150 250 B 30 100 200 350…
Q: Materials Management $12.00 per purchase order Chemical Processing $7.50 per metric ton…
A: Activity Activity rate Activity used Activity cost Materials management $12 per purchase order 4…
Q: During the upcoming year De Anza Co. expects the following data: Expected unit selling price is:…
A: Hi, we are supposed to answer one question at a time. Since you have not mentioned which question…
Q: Appraisal cost would be high so wait for Failure Cost? Human factors can never be underestimate…
A: "Since you have asked multiple questions, we will solve the first three sub-parts for you. To get…
Q: uggs-Off Corporation produces and sells a line of mosquito repellants that are sold usually all year…
A: PLEASE BE NOTED AS PER THE BARTLEBY POLICY I HAVE SOLVED THE FIRST THREE SUB-PARTS. Organizations…
Q: The president of HiU Enterprises, Terri Hill, projects the firm's aggregate demand requirements over…
A: Given table- Month Demand December 1600 January 1400 February 1600 March 1800 April…
Q: The BOM for product A is shown in Figure 11.45. The MPS forproduct A calls for 120 units to be…
A: Given: product A - 85 units (week 3), 100 units (week 6) product B - 180 units (week 5) Part C…
Q: The design capacity, effective capacity and efficiency for a car licensing operation are shown in…
A: This question is related to the topic-Production Management and this topic falls under the…
Q: The Sail-Sea is a boat manufacturer. The assembly location is available for production of 60 boats…
A:
Q: b) Samuel, production manager for an exercise equipment manufacturer, needs to schedule an order for…
A: Product structure representing the bill of materials in a hierarchical decomposition which helps to…
Q: Businesses routinely collect Business Process Data from these 2 types of systems: O a. CRM and CGI.…
A: Business processes are those activities which are regularly performed by the business, like…
Q: Table B shows a partially completed MPS record for ball Develop the MPS for ball Four customer…
A: Following is the MPS of ball: Formulas used:
Q: The school cafeteria can make pizza for approximately $0.30 per slice. The cost of the kitchen use…
A: Pizza's rate = $9 No. Of slices = 8 Per slice rate = 9/8 = $ 1.125 However the fixed cost per day is…
Q: Problem 225-17 (Algo) The M-N plant manufactures two different products: M and N. Selling prices and…
A: A Small Introduction of Supply Chain Management Supply Chain Management incorporates, arranges,…
Q: 9.17 Tailwind, Inc., produces high-quality but expensive craining shoes for runners. The Tailwind…
A: Here we have Ta=Total time availaible =400 minutes per dayDa=Daily production rate required= 62…
Q: An assembly line is to be designed to operate 7.5 hours per day and supply a steady demand of 300…
A: Given that - Demand = 300 units Operating time = 7.5 hours per day
Q: Sized Rite is trying to determine how best to produce itsnew line of shoes for expanded feet. Demand…
A: Given Process Fixed Cost ($) Variable Cost ($) A 20000 5 B 10000 10…
Q: Problem 7-13 (Algo) Owen Conner works part-time packaging software for a local distribution company…
A: The Breakeven Point is that level of sales at which there is no profit no loss. In other words it is…
Q: The Silver Star Bicycle Company will be manufacturing both men's and womer's models for its…
A: Based on the question, the variables will be as follows. X1 = Number of units of Men's model in…
Q: Your friends and you have decided to open a large restaurant in Ranchi. You plan to offer a complete…
A: A business required three common elements to conduct business operations i.e., finance, resources…
Q: Q.11 In 2021, SM Entertainment., had P900,000,000 of sales and it had P450,000,000 of fixed assets…
A: Total sales (amount) - 900,000,000 Fixed Assets - 450,000,000 Usage capacity - 70% Actual usage in…
Q: why Capacity Requirement Planning (CRP) is primarily used in MTO, and not used in MTS and ATO?
A: Capacity requirements planning is shortly called CRP and it is known as the plan which is helpful in…
Q: 40 & 42
A: Note: First question was answered. Kindly post another question seperatelyDetermine the option that…
Q: The production system design planning considers input requirements, conversion process and output.…
A: Capacity planning can be stated as the type of production planning that generally involves…
Q: Blazerauto inc is considering whether to produce a new line of car. The company estimates that the…
A: Break-even point is the point where production revenue and cost are equal to each other of products…
Q: XYZ makes two types of products using 4 machines for 8 hours each day. Product A visits machines 1,…
A:
Q: What is the breakeven point? What profit or loss can be anticipated with a demand of 3800 copies?…
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for…
Q: Determine the following items: h. labor efficiency variance i. actual variable overhead incurred…
A: ANSWER IS AS BELOW:
Q: Coleman Rich, Ltd., has received the followingorders:Period 1 2 3 4 5 6 7 8 9 10Order size 60 30 10…
A: Given Usable minutes in a week - 2250 minutes Each unit takes 65 minutes to complete
Q: Draw a detailed break-even chart. b) Compute the break-even point (i) in units; (ii) in dollars;…
A:
Q: The following processes - Tameka, Tamia, and Christian - have the following cost structure: Show…
A: a) As we can see, the most economical process for volume of 8000 units is Christian having $116000…
Q: What is capacity requirements planning? At what level of the priority planning process does itoccur?
A: Capacity requirements planning is a process of determining the resources that are required to meet…
Q: WAI uses two resources for each product that it builds: directlabor and machine time. From…
A: SOLUTION:
Q: What volume (units) of output would the two alternatives yield the same profit?…
A: Given data For proposal A Fixed cost = $50000 Variable cost = $12 Revenue = $20 For proposal B…
Q: What is the amount of inventory transferred out and remaining in ending work in process inventory?…
A: Process costing system that is applied where production of a product takes more than one process for…
Q: There is no alternative place inside plant premises to store the increased salt consumption. Also…
A: Before setting up any plant, the manufacturer has to plan certain things depending upon production…
Q: In aggregate planning decision variables, higher material costs are related with the decision…
A: Aggregate PlanningAggregate planning is helps in capacity to meet fluctuating demand at minimum…
Q: Mr. R is working from7:30 AM to 3:30PM including lunch break for 5 days every week in jewelry design…
A: Piece rate pay: The worker is paid per unit of creation in a piece-rate pay system. A person is…
Q: The trim line at PW is a small subassembly line that, along with other such lines, feeds into the…
A: THE ANSWER IS AS BELOW:
Q: How do the firms apply Expected Monetary Value (EMV) to Capacity Decisions?
A: Expected Monetary Value(EMV) is an integral part of risk management which basically shows the…
Q: Based on the following sensitivity report, what would be the impact of changing the constraint…
A: Given data: Sensitivity report To find: The impact of changing the constraint right hand side for…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Mt. Kinley is a strategy consulting firm that divides its consultants intothree classes: associates, managers, and partners. The firm has been stable in size for the last 20years, ignoring growth opportunities in the 90s, but also not suffering from a need to downsize inthe recession at the beginning of the 21st century. Specifically, there have been—and areexpected to be—200 associates, 60 managers, and 20 partners.The work environment at Mt. Kinley is rather competitive. After four years of working as anassociate, a consultant goes “either up or out”; that is, becomes a manager or is dismissed fromthe company. Similarly, after six years, a manager either becomes a partner or is dismissed. Thecompany recruits MBAs as associate consultants; no hires are made at the manager or partnerlevel. A partner stays with the company for another 10 years (a total of 20 years with thecompany).A. How many new MBA graduates does Mt. Kinley have to hire every year?B. What are the odds that a new hire…For each of these cases, on photo prepare for building a model by reading the full case and answering the following questions. 1. Explore the mess by answering the following questions: (a) What do we know? (b) What can we assume? (c) What could the results look like? (d) What information can be brought to bear? (e) What can we ask the client? (f) Are there any similar situations or problems? 2. Formulate one or more problem statementsKraft Bakeries introduced in 2019 a new line of frozen apple pie. For 2019, sales by quarter were asfollows: 11,000 units, 16,000 units, 15,000 units, and 20,000 units. Because of aggressive marketing and promotion, the company expects that sales for each quarter of 2020 will be 25% higher thanthe respective quarter in 2019. The selling price per unit in 2020 is expected to be $4. What are theexpected sales, in units and dollars, for the second quarter of 2020? For the third quarter of 2020?
- Suppose the military bureaucracy consistently misinforms Congress on the total costs of producing militaryhardware. Assume that it underestimates the actual costs and that the political representatives believethese estimates. Show how this is likely to cause a loss in efficiency. Show the efficient output of militaryhardware, the output desired by the military bureaucracy, and how the output chosen will differ from the efficient output even if Congress attempts toachieve efficiency. In your answer, assume that the military seeks to maximize the size of its budget.Elen Bright pondered how she could determine which decision had better performance. The luxury division, by meeting its financial targets, greatly added to the company’s overall financial health, and allowed TAP to report better results from the prior year. Turning by the economy division, she was satisfied with how they had positioned themselves to take advantage of anticipated growth in the economy segment, which contribute to TAP’s longterm financial performance.She sat back and thougt about her dilemma: “The more I look at the results, the more confused I become. I can’t decide which division has performed better.” Question: Diagnosis the problems in the balanced scorecard development process, that makes that gave confusing results.name tangible and intangible resource/capability and match each against the VRIN framework, clearly justify why any of the named tangible and intangible resource/capability qualifies to be a core competency?
- At the end of Avondale Industries’ fiscal year, the training and development office reviewed its budget and found that, due to the cancellation of two training programs, there were still funds left to spend. With just two weeks in which to spend the money, the training director put together a program to train employees who were transferring from the avionics division to the new adhesives and sealants division. The training was held but there was not enough time to consult with managers in the adhesives and sealants division to set learning objectives for the skills needed in the new division. A month later, the training director was asked to provide another training as the employees did not have the knowledge, skills, and abilities for their new jobs. Why is it important that a thorough analysis of training needs be conducted prior to holding a training program? Understanding the needs of the new division will help supervisors identify which employees need the training the most.…Brief Exercises 7-11 through 7-14 involve departmental cost allocation with two service departmentsand two production departments. Use the following information for these four exercises:Brief ExercisesPercentage Service Provided toDepartment Cost S1 S2 P1 P2Service 1 (S1) $ 30,000 0% 30% 35% 35%Service 2 (S2) 20,000 20 0 20 60Production 1 (P1) 100,000Production 2 (P2) 150,0007-13 What is the total cost in P1 and P2 and what is the amount of service department cost allocated to P1and P2 using the step method with S1 going first?Brief Exercises 7-11 through 7-14 involve departmental cost allocation with two service departmentsand two production departments. Use the following information for these four exercises:Brief ExercisesPercentage Service Provided toDepartment Cost S1 S2 P1 P2Service 1 (S1) $ 30,000 0% 30% 35% 35%Service 2 (S2) 20,000 20 0 20 60Production 1 (P1) 100,000Production 2 (P2) 150,0007-12 What is the total cost in P1 and P2 after allocation using the direct method?
- Your hospital has built a new freestanding facility that includes a 36-bed medical telemetry care unit. The patients and staff from the existing smaller units will be combine into the new unit. The current budget for each of these units is: unit a- average daily census 11.9 unit b- average daily census 22.0 unit a- acuity 1.6 unit b- acuity 1.85 unit a- workload 3.8 unit b-workload 3.6 unit a- productivity % 19.0 unit b- productivity % 16.5 the budgets of the two units will be combine with no changes. Calculate the budget for the new unit including the ADC, acuity, workload, hours per patient day (HPPD), shifts/24 hours, productivity factor and variable direct care full time equivalents.You have been asked to estimate the cost of 100 prefabricated structures to be sold to a local school district. Each structure provides 1,000 square feet offloor space, with 8-feet ceilings. In 1999, you produced 70 similar structures consistingof the same materials and having the same ceiling height, but each provided only 800square feet of floor space. The material cost for each structure was $25,000 in 1999, andthe cost capacity factor is 0.65. The cost index values for 1999 and 2006 are 200 and 289,respectively. The estimated manufacturing cost for the first 1,000-square-foot structureis $12,000. Assume a learning curve of 88% and use the cost of the 50th structure asyour standard time for estimating manufacturing cost. Estimate the total material costand the total manufacturing cost for the 100 prefabricated structures.Operation Research UPVOTE WILL BE GIVEN. Please answer in typewritten form. Please write a detailed solution and put some comments/explanations. Do not copy answers from Chegg or here in bartleby. A company produces two products, A and B. The sales volume for A is at least 80% of the total sales of both A and B. However, the company cannot sell more than 100 units of A per day. Both products use one raw material, of which the maximum daily availability is 240 lb. The usage rates of the raw material are 2 lb per unit of A and 4 lb per unit of B. The profit units for A and B are $20 and $50, respectively. Determine the optimal product mix for the company.