Order operating at 165 cy/hr has a 2.5-cy heaped capacity bucket and swings on a 1.00-min load cycle. The trucks have 15-cy capacity and a 30-dump + haul + return time. Assume 100% fill factor applies to the loader and 55-min work efficiency. Determine: 1. Balance number of trucks = ----- 2. If 8 trucks are used, ------ controls production 3. When 8 trucks are used, Truck Production (cy/hr) = ------

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 7RQ
icon
Related questions
Question

Order operating at 165 cy/hr has a 2.5-cy heaped capacity bucket and swings on a 1.00-min load cycle. The trucks have 15-cy capacity and a 30-dump + haul + return time. Assume 100% fill factor applies to the loader and 55-min work efficiency.
Determine:
1. Balance number of trucks = -----
2. If 8 trucks are used, ------ controls production
3. When 8 trucks are used, Truck Production (cy/hr) = ------

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,