Q: Find the expected production in loose cubic meters (LCM) per hour of a large hydraulic excavator.…
A: given data: sand and gravel soil Bucket fill factor(F)=0.95 average depth of cut=2.5 m maximum depth…
Q: Situation 1 Given spot levels determine the total amount of trucks with capacity of 20 cubic meters…
A:
Q: The Following are the data of a simple summit mass haul diagram. STATION MASS ORDINATE (m³) 0+000…
A:
Q: Given the following Mass-Haul Diagram: Mass Diagram 5000 4000 3,500 3000 2,100 6.0 2,100 7.0 2000…
A:
Q: A project to move packed earth requires you to decide whether to use a dozer/scraper operation or…
A: Write the expression to calculate the bucket volume Bucket Volume= (Headed bucket capacity)*(Fill…
Q: Manov Steel Inc. has a rolling mill that produces sheet steel with a nominal thickness of 0.125…
A:
Q: Discuss Compression Index (e-log-p Model)
A: The slope of the linear portion of the pressure-voids ratio curve is represented using the…
Q: 1.5 1.7 2.3 3.0 2.5 1.4 2.0 1.0 1.1 2.6 1.8 2.0 3.2 1.4 0.9
A: ASKED: To determine the number of trucks (of given capacity) required to fill the given grid. Given,…
Q: The waterline section of a barge is as shown. X1 X2 centroid Am 1B.C m 4.D m a) Calculate the total…
A:
Q: Each of the four silos seen in the figure has an empty weight of 30MN, and can hold up to 105 MN of…
A: Number of Silos = 4 Empty Weight of Silo = 30 MN Capacity to hold grain = 105 MN Weight of the Mat =…
Q: cite literature that discusses the use of weir in field application
A: Weir- A weir is a tiny dam that spans a body of water like a river. We utilise them to aid in the…
Q: The grading works of a proposed road shows the following data. Free haul distance = 50m Cost of…
A: Given data, L.E.H = 450 m Free haul distance = 50 m 1 station = 20 m Cost of haul = 0.25 per meter…
Q: Q 2/ classify the $tames below and determime ' bhe D,e.f A A cp=?
A:
Q: Determine mass diagram ordinates given is the net fill and cut volumes and calculate overhaul…
A: Solution: Given data: The net fills and cut volumes are given: The free haul distance=250 m
Q: Calculate the cost per cubic yard to move earth for a project that plans to use a back-hoe and…
A: Calculate the number of bucket loads as follows: Calculate the bucket volume by using the formula:…
Q: F.H.D = 500 m, shrinkage factor = 0.9, Draw a mass-haul Diagram & determine the over haul distance…
A: To determine the over haul distance
Q: E. Determine the productivity of (3 c-yd) shovel when the height swing factor (0.97), fill factor…
A: Solution: Given: Size of the bucket, Q = 3 cubic yard Bucket fill factor, k = 95 % = 0.95 Earth…
Q: the excavation works include Select one: a. filling works b. cutting works c. disposal d. all the…
A: Excavation work includes
Q: Determine the gradability of a crawler tractor p
A:
Q: Observations indicate that an excavator carries an average bucket load of 2.3 LCM per cycle. The…
A: Excavator is a vehicle which is commonly used in construction and it is useful to move big objects.…
Q: Explain what the mass haul diagram is all about
A: Readers can see a graphical orientation of the items transported with a mass haul diagram. The graph…
Q: 3 B K 1. Complete the arrow diagram shown, find the total project duration and 3 E 12 H define the…
A: The given arrow diagram is completed as shown below.
Q: The mass ordinates at the initial point ( sta 0+000) of a mass diagram is 50 cu m ,and at the last…
A: Solution
Q: 1- Plot the mass diagram and the profile schematic. 2-Calculate the total overhaul earthwork cost if…
A: Introduction- Excavation is the process of removing clay or rocks from its native place. The placing…
Q: The ff data represents a single summit mass diagram of a proposed expansion of the Tolosa…
A:
Q: Calculate the total operation time for this construction activity if the volume of soil to be…
A: The values given in the question are as follows: Volume of dense soil=8 m3 Volume of soil with…
Q: disposal site. Find the haul-speed constants a and b and the round-trip haul time for a site that is…
A: The basic haul-speed equation is given by y=xa+bx and this is the equation of a rectangular…
Q: In calculating the time require for a haul unit to make one complete cycle, it is customary to break…
A:
Q: Given the following Mass-Haul Diagram: Mass Diagram 5000 4000 3,500 3000 2,100 6.0 2,100 7.0 2000…
A: The given values are as folows,The limit of free haul…
Q: It is determined that a 5-m width-of-cut combine is traveling 1.5-m/s. In one minute’s time 50 kg of…
A: Field capacity of the machine is defined as the ratio of the area harvested in hectare per unit time…
Q: If the free haul area is between 4+30 and 14+30, what is the average haul distance (ft) for the net…
A: Given data- Free Haul Area between 4+30 and 14+30 Volume section between 2+60 and 3+00 To Find-…
Q: A truck will haul an average load of 15 cy, heaped capacity (LCY) per load. Using the swell factor…
A: given data: Average haul load by the truck = 15 cy Swell factor for sand = 15% Swell…
Q: . Find the cost of transporting
A: Volume and cost of transporting
Q: 1. Transportation and moving How many 5-ton LCY dump trucks will it take to support a wheel loader…
A: "Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: An excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of…
A: Given, Loading time = 2 min 30 sec = 2.5 min Hauling + Dumping + Return time = 25 min
Q: a) 200 -ton , nominal rating crawler-mounted crane with 180 ft of boom has a radius of 60 ft what is…
A: Given data:- Boom length(L)=180 ft Radius(R)=60 ft We know that- Lifting capacity of…
Q: Discuss in your own words with the help of diagram, the load transfer mechanism in skin…
A:
Q: Question 1: Estimate the approximate output of a bulldozer for the following conditions: - Swell,…
A:
Q: A 3-ha field was plowed using a 15-cm wide animal-drawn plow at 4 kph and field efficiency of 75%.…
A: Speed = 4 kph = 4000 mph Width of plow = 15 CM = 0.15 m Effective field capacity = 0.15 x 4000 x…
Q: what is profitable haul analysis
A: Mass haul diagram A mass haul diagram provides viewers with a graphical representation of the…
Q: 5. The earthworks data of a proposed highway shown on the tabulated data. Length of economic haul -…
A: Given, Free haul distance=50 m Length of economic haul=450 m The stationing of limits of economic…
Q: . Briefly describe the following: - 1. Under what conditions would you prefer borrowing new material…
A: for highways embankment maximum dry density depends upon following factors 1.void ratio 2.…
Q: A mass haul diagram shows a free-haul distance of 50 m, cost of excavation of Php 6.00/m³ and a…
A: Solution: Given: Free haul distance = 50 m Cost of excavation = 6/m3 Price of over haul = 0.10/m3
Q: Determine the balanced hauls and indicate the direction of haul for the mass diagram showR below.…
A: Given data- Mr =41400 KN/m26.0×103 Psisubbase Mr =93,150 KN/m2 13.5×103 Psi…
Q: How do you prefer a ‘tracked drive’ system than a ‘tired drive’ system for an excavator?
A: There are six things to consider when choosing between a tracked and wheeled or tired excavators :…
Q: A field measuring 45 m X 90 m is to be prepared using a 1-m upland power tiller at a speed of 3 kph.…
A: Field measuring = 45x90m Upland power tiller or width = w = 1m Speed = S = 3kph Time = 9sec
Q: Prob.2. Estimate the output per hour in bank volume of a power shovel of 0.76 m' сарасity excavating…
A: Given, Bulked volume = 150m³/hr Factor = 0.88 Swell factor= 1.3 Angle of Swing= 150°
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- underwhat condition would you preferborrowing new materials from a borrow pit for highwayembankmentA project to move packed earth requires you to decide whether to usea dozer/scraper operation or excavator/truck operation. Determinethe most economical operation based on the dozer/scraper operationestimated at $1.25/cy. All equipment carries a rated heaped capacity, hasa fill factor of 100%, and works 45-min hours. Excavator costs $95/hr(including operator), cycle time is 0.28 min, and bucket heaped capacityis 5.0 cy. Truck costs $150/hr.(including operator), dump time is 0.5 min(maneuver, dump, turn), heaped capacity is 31.7 cy, and 12 trucks areavailable for the project.Hauling equipment operates in one directionfrom A to B to C and finally to D. Section Load Length (ft) Speed (mph) A full 3000 9B full 2500 17C empty 3000 36D empty 3000 16An excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations?
- Given the following information, determine the cost of excavation, the number of loads required toremove the material and how many days it will take to complete the job.o 5225m3 of material is to be excavatedo Equipment cost is $280/houro Operator cost is $55/houro Equipment can remove 55m3/houro Assume 20% swell in soil when excavated for removal off siteo Trucks can carry 10m3o Work 10hr daysA hydraulic excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations? complete solutionIn a certain portion of a road construction, the following data were taken; Cost of haul = P30 per cu. m per station Cost of borrow = P360 per cu. m. Using a free haul distance of 60m, A) Compute the length of the Economical Haul. B) Calculate the Cost of Excavation.
- Don't copy and paste from Internet what is profitable haul analysis please explain it in detail thank youThe mass ordinates at the initial point ( sta 0+000) of a mass diagram is 50 cu m ,and at the last station (0+280) is - 200 cu m .If the length of economical haul is plotted horizontally to intersect the ( summit ) the mass diagram at a point having a mass ordinate of 120 cu m .The length of economical haul is 250 m long, compute the volume of borrowSolve this ! Explain the eqations used
- Briefly discuss the advantages of preloading methods?An excavator bucket has a heaped capacity of 6.2 CY and a bucket fill factor of 0.85. What is the bucket capacity?a. 5.35 CY b. 6.1 CY c. 7.3 CY d. 5.27 CYWhat is the approximate optimum hourly production rate for a wheeled backhoe filling hauling units? Struck capacity for the bucket is 6 loose cubic feet and the bucket fill factor is 110%,. The cycle time is 2 minutes, the soil type is moist loam with a 25% swell factor.