Problem 2: Consider divided multilane highway in V.A. Rufino near Ayala (fp = 0.90) that has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 3.3m lanes with a 1.5m right-side shoulder and a 1.5m left-side shoulder. The posted speed is 80.5 kph. Formerly there were 2.4 access points per km, but recent development by Makati City Central Business District has increased the number of access points to 7.2 per km. Before development, the peak-hour factor was 0.95 and the directional hourly volume was 2200 vehicles with 10% large trucks and buses and 3% recreational vehicles. After development, the peak-hour directional flow is 2600 vehicles with the same vehicle percentages and peak hour footor What is tho of boforo

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter9: Capacity And Level Of Service For Highway Segments
Section: Chapter Questions
Problem 8P
icon
Related questions
Question
Problem 2: Consider divided multilane highway in
V.A. Rufino near Ayala (fp = 0.90) that has four lanes
(two lanes in each direction) and is on rolling terrain.
The highway has 3.3m lanes with a 1.5m right-side
shoulder and a 1.5m left-side shoulder. The posted
speed is 80.5 kph. Formerly there were 2.4 access
points per km, but recent development by Makati City
Central Business District has increased the number
of access points to 7.2 per km. Before development,
the peak-hour factor was 0.95 and the directional
hourly volume was 2200 vehicles with 10% large
trucks and buses and 3% recreational vehicles. After
development, the peak-hour directional flow is 2600
vehicles with the same vehicle percentages and
peak-hour factor. What is the level of service before
and after the development of V.A. Rufino?
Transcribed Image Text:Problem 2: Consider divided multilane highway in V.A. Rufino near Ayala (fp = 0.90) that has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 3.3m lanes with a 1.5m right-side shoulder and a 1.5m left-side shoulder. The posted speed is 80.5 kph. Formerly there were 2.4 access points per km, but recent development by Makati City Central Business District has increased the number of access points to 7.2 per km. Before development, the peak-hour factor was 0.95 and the directional hourly volume was 2200 vehicles with 10% large trucks and buses and 3% recreational vehicles. After development, the peak-hour directional flow is 2600 vehicles with the same vehicle percentages and peak-hour factor. What is the level of service before and after the development of V.A. Rufino?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Intersection control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning