Q.6 A power plant has a maximum demand of 120 MW, load factor of 85% and the capacity factor of 60%, then the plant utilization factor and plant capacity respectively are

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter6: Power Flows
Section: Chapter Questions
Problem 6.52P
icon
Related questions
icon
Concept explainers
Question
100%

Need both parts , correct answer only. Thanks

Q.6
A power plant has a maximum demand of
120 MW, load factor of 85% and the capacity
factor of 60%, then the plant utilization
factor and plant capacity respectively are
Transcribed Image Text:Q.6 A power plant has a maximum demand of 120 MW, load factor of 85% and the capacity factor of 60%, then the plant utilization factor and plant capacity respectively are
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Load flow analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning