Q:1) Determine the hourly production rate (pc/hr) for each operation; Machine 1 Machine 2 Machine 3 Machine 4 Machine 5 Machine 6 Q:2) Determine the average manufacturing lead time (hr)
Q: How can sustainable operations methods be planned? What procedure?
A: A backup is a copy of a system's data, and a recovery is the ability to restore the data backup to…
Q: 11. A manager must decide which type of machine to buy, A, B, or C. Machine costs are as follows:…
A: The period of time between a client placing an order and the firm fulfilling it is known as the…
Q: Explain the requirement of a focused work Center or factory to be appropriate
A: To be determined: the requirement of a focused work Center or factory to be appropriate
Q: How can the Resources be deployed to Achieve Customer Requirement?
A: Quality Function Deployment (QFD) is a process and set of tools for quickly identifying and…
Q: Explain the term "balanced scorecard" in a few words. What does it have to do with a business's…
A: Businesses utilize strategic management planning mechanisms to decide precisely where their…
Q: A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two…
A: The Break-even point for each unit is calculated by the following formula. Ans 1: Given data for…
Q: A). A product is currently made in a process-focused shop, where fixed costs are $9,000 per year and…
A: Break even point is the point at which the total production cost and total revenue of the company…
Q: Is there a difference between capacity planning strategy and capacity planning technique in…
A: The process of determining the resources required by manufacturers to meet demand for their products…
Q: Laredo Leather Company manufactures high-quality leather goods. The company's profits have declined…
A: 1) To find equivalent units for material and conversion. According to the given data,
Q: Collins Title Insurance Ltd. wants to evaluate its labor and multifactor productivity…
A: Here, we could see that both the labour productivity and multifactor productivity data are needed to…
Q: How often should a company develop and rei ne the operations and supply chain strategy?
A: А strаtegy is а generаl рlаn tо асhieve оne оr mоre lоng-term оr оverаll gоаls under…
Q: Productivity and Strategy; Manufacturing To maintain profit growth, several manufacturing companies…
A: The term productivity refers to the output of production relative to the inputs. It is a technique…
Q: What is the anticipated production?
A: Dear Student Here is your Step By Step Solution: Number of Process Lines: 3 Operating days: 7…
Q: Choose either the 4-star option or the 5-star option and evaluate your choice of option based on a…
A: At first, the above case study should be written in different headings. It's very long to read.
Q: Choose either the 4-star option or the 5-star option and evaluate your choice of option based on a…
A: The SWOT analysis was evolved in 1960 at Stanford Research Institute with the motive to help…
Q: Do not round intermediate calculations. Round your answers to three decimal places. MSE: MAD:…
A: Forecasting is the process of predicting future events based on previous or historic data and…
Q: A process currently services an average of 41 customers per day. Observations in recent weeks show…
A: Given data: Average customers per day = 41 Current utilisation = 90% = 0.90 The management wants a…
Q: Identify the competitive advantage of the hotel (for your option) would be and whether it would be…
A: Hotel Competitive Advantage Simply put, a hotel (or any company really) has a competitive advantage…
Q: Do you see a difference in operations in manufacturing and services
A: Operations are the set of activities that are concerned with designing and controlling the…
Q: Given the following data, can an order for 40 more units for delivery in week 5 beaccepted? If not,…
A: Solution The following table shows the ATP for each week - Week 1 2 3 4 5 6 7 8 Customer…
Q: An operations area task performed in a restaurant is: Select one: a. Calculate the profit and loss…
A: The daily activities of a corporation involved in producing and selling its product, generating…
Q: A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two…
A: Let us assume the level at which same profit is X for two alternative yields Now Profit for…
Q: Define the feasibility in terms of operational, technical, financial, and scheduling aspects
A: A feasibility study is nothing but an analysis that takes all the aspects appropriate to the project…
Q: What are the steps to follow in capacity management?
A: Capacity is the ability to store, produce, or achieve. In any organization, capacity is termed as…
Q: What are the objectives of capacity management?
A: The process of managing the various resources within an organization and further deals with the…
Q: A small firm intends to increase the capacity of a bottleneck operation for producing a product by…
A: Given: Fixed cost A = $30000 Fixed cost B = $25,000 Unit variable cost A = $10 Unit variable cost B…
Q: a. Determine each alternative’s break-even point in units. (Round your answer to the nearest whole…
A: Alternative A:Annual Fixed Cost = $ 39,000Variable Cost = $ 10Revenue = $ 15 Alternative B:Annual…
Q: Describe in what ways does technology have an impact on capacity planning ?
A: The planning step is the process of forecasting required industrial production based on expected…
Q: tion alternatives b) What cash flows will be taken into account to evaluate the alternatives.…
A: Possible alternate solution or step which need to be taken by organisation is to gradually replacing…
Q: At Symbiotech, the output of a process is valued at $30 per unit. The cost of labor is $70 per hour…
A: Given - Units produced = 2,300 unitsLabor ($) = 14,500Material ($) = 22,700 Overhead ($) = 10,270…
Q: A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two…
A: Given data is Annual fixed costs of A = $39000 Annual fixed costs of B = $21000 Variable costs for…
Q: Explain Capacity Flexibility and its strategies?
A: The capability of any business to reduce or raise their manufacture capacity liable on the market…
Q: Mr. Adjorlolo is the newly employed Operations Manager for Dunu Foods Limited, a food processing,…
A: Below are the six Steps that are followed by Mr. Adjorlolo is the newly employed to make sure that…
Q: Amy Xia's plant is designed to produce 8,000 hammers per day but is limited to making 6,000 hammers…
A: given, Actual output = 6,000 hammers per day Design capacity = 8,000 hammers per day
Q: hich are the reason for formulating and implementing a operation and supply chain strategy?
A: THE ANSWER IS AS BELOW:
Q: Explain what capacity management is and why it is strategically important.
A: The capacity management refers to the process of ensuring an organization escalates its production…
Q: ew equipment, it was possible to transfer one of the workers to another department, and equipment…
A: The answer is as below:
Q: A manager must decide which type of machine to buy, A, B, or C. Machine costs are а. Machine Cost…
A: a) The number of machines at any annual demand can be determined using following formula: Number of…
Q: How does the capacity analysis respond when numerous different processes are running at the same…
A: Concept Introduction Capacity Analysis concept in turn is useful to negotiate any required changes…
Q: What are the effects of trade-offs for operations improvement and how does it relate to efficient…
A: The trade-off principle states that if there is an improvement in one place then a considerable…
Q: In December, RMO Manufacturing had Actual Output of 100 units. Its Effective Capacity dropped to…
A: Given, DESIGN CAPACITY = 200 UNITSEFFECTIVE CAPACITY = 120 UNITSACTUAL CAPACITY = 100 UNITS
Please refer image and answer below both question with explanation:
Q:1) Determine the hourly production rate (pc/hr) for each operation;
Machine 1
Machine 2
Machine 3
Machine 4
Machine 5
Machine 6
Q:2) Determine the average manufacturing lead time (hr)
Step by step
Solved in 2 steps with 6 images
- Mack’s guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically, out of the 100 guitars that begin production each month, only 80 percent are considered good enough to sell. The other 20 percent are scrapped due to quality problems that are identified after they have completed the production process. Each guitar sells for $300. Because some of the production process is automated, each guitar only requires 10 labor hours. Labor is paid at $10/hour, materials cost is $40/guitar, and overhead is $2,000. a) Calculate the labor and multifactor productivities. b) After some study, the operations manager recommends 3 options to improve the company’s multifactor productivity: (1) increase the sales price by 10 percent, (2) improve quality so that only 10 percent are defective, or (3) reduce labor, material, and overhead costs by 10 percent. Which option has the greatest impact on the multifactor productivity measure?Consider the following batch flow process consisting of three process steps performed by three machines. What is the capacity of the process given the following information? Batch size = 50 parts Step 1 - Processing Time = 1 minute/part; Setup time = 20 minutes Step 2 - Processing Time = 2 minute/part; Setup time = no setup Step 3 - Processing Time = 1.5 minute/part; Setup time = no setupFurniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 9 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works independently on his/her own chair. Assume inventory buffers are allowed between each station. Station Staffing Processing time (hours per chair per worker) Stripping 3 2.5 Priming 2 1.5 Painting 3 1.75 Inspection 1 0.8 A truck loaded with 10 chairs arrives. How many hours will it take them to complete these 10 chairs?(The accuracy should be of two digits after the decimal places.)
- H4. A manufacturing process consists of three processes. Step 1 requires 4 minutes per unit, step 2 requires 6 minutes per unit, and step 3 requires 7 minutes per unit. 20% of units that complete the third step require rework, which means those units must start the process over at step 2 (processing times are the same for units being reworked) and rework is always successful. Demand at the shop is 0.4 units per minute. What is the capacity of the shop (in units per minute)?Consider the following batch flow process consisting of three process steps performed by three machines. What is the capacity of the process given the following information? Batch size = 50 parts Step 1 - Processing Time = 1 minute/part; Setup time = 20 minutes Step 2 - Processing Time = 2 minute/part; Setup time = no setup Step 3 - Processing Time = 1.5 minute/part; Setup time = no setup Your answer provided to me was 1.881 parts per minute (which also equals 112.8 parts per hour). I understand how you arrived at such answer. However, per my professor's answer key, states an answer of 30 units per hours (which could be wrong and I want to confirm), but my question is - is there any way the answer could be 30 units per hour? Thank you!XOX Corporation's management keeps track of the time it takes to process orders. During the most recent month, the following average times were recorded per order Wait time 15. 6 Inspection time 0.8 Process time 1.6 Move time 0.7 Queue time 3. 9 1. Percentage of manufacturing cycle time spent on non-value-added activities 2. Compute the delivery cycle time in days
- A lathe is used to process an automobile part. The processing time per part is 4 minutes. After producing 140 units of the part, the lathe requires a 46 minute maintenance process. Demand for the part is 11 units per hour. What is the maximum inventory of a part (in units)?Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. Demand (sandwiches per hour) are Grilled Vegetables = 25, Grilled Chicken = 15, and Pastrami = 10. There are up to five steps in the process of making sandwiches, listed below with processing times. Step Grilled Vegetables Grilled Chicken Pastrami 0.75 minutes 0.75 minutes 0.75 minutes 0.75 minutes 1.4 minutes 1.4 minutes - - - - 3 minutes 3 minutes 2 minutes 2 minutes 2 minutes 2 minutes 0.5 minutes 0.5 minutes 0.5 minutes 0.5 minutes Only 50 percent of customers want their sandwich toasted, no matter which sandwich is ordered. Suppose Panini employs 1 worker at each step. Instructions: Round all answers to 1 decimal place. What is the implied utilization of each of the five steps in this process? Cut ____% Grill ____% Slice ____% Toast…. Aquatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A computer numerically controlled (CNC) machine drills into the block to make the metal “frame” of the housing. Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in the treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly takes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute setup time before the production of a batch can begin. a. If the CNC machine produces 14 housings between setups, what would be its capacity (in housings per hour)? b. Assuming the process is supply-constrained, what is the utilization (as a number between 0 and 1) of the CNC machine if it operates in batches of 14 housings? c. Assuming…
- What is OEE and also calculate the OEE from the given data in below table Items Data Shift Length 8 Hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsPlease can u answer this true and false 1. The design capacity is often lower than the effective capacity. 2. To improve efficiency firms should train employees and correct quality problems. 3. Mass Customization processes are low volume and low variety 4. Process Strategies have long-term effects on efficiency and production flexibility 5. Continuous processes are high volume but a low variety of products. 6. Modules are parts or components of a product previously prepared, often in a continuous process. 7. Effective capacity is the number of units a facility can hold, receive, store, or produce ha pers 8. Utilization is the theoretical maximum output of a system in a given period under idea conctionsA bank recently finished construction of a new building in the downtown business district. You have been asked to help them arrange the various departments of its check processing division to minimize the workflow (Summation LxD) in its operations. The movement of checks between departments is shown in the table below. Department 4 (the check distribution department) must be in the room with the elevator. Only lateral movement is allowed (no diagonal movement allowed) from the center of one department to the center of the destination department. Each department is 50 feet x 50 feet. What is the Summation LxD of the recommended layout? 10,640 feet 15,960 feet 26,600 feet 38,800 feet None of the above Which of the potential layouts shown above should be recommended to the bank management? (Below is the potential layouts) Layout A Layout B Layout C Layout D None of the above