Q2: A road embankment is 8 m wide and 200 m in length at the formation level, with a side slope of 1.5 Horizontal: 1 vertical. The embankment has arising gradient of 1 in 100 m. the ground levels at every 50 m along the center line are as in table 1. Take formation level of zero chainage is 166 m. Calculate the volume of earth work by Trapezoidal rule and Prismoidal rule. Table 1. Distance (m) 50 100 150 200 Ground RL(m) 164.5 165.2 166.8 167.0 167.2

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter13: Slope Stability
Section: Chapter Questions
Problem 13.28CTP
icon
Related questions
Question
A road embankment is § m wide and 200 m in length at che formation level, with a side slope of 1.5 Horizontal: 1 vertical. The embankment has arising gradient of 1 in 100 m. the ground levels at every 50 m along the center line are as in table 1. Take formation level of zero chainage is 166 m. Calculate the volume of earth work by Trapezoidal rule and Prismoidal rule. Distance (m) | 0 | 50 | 100 | 150 | 200 Ground RL(m) | 1645 1652 | 1668 | 1670 | 1672
Q2: A road embankment is 8 m wide and 200 m in length at the formation level, with a
side slope of 1.5 Horizontal: 1 vertical. The embankument has arising gradient of 1
in 100 m. the ground levels at every 50 m along the center line are as in table 1.
Take formation level of zero chainage is 166 m. Calculate the volume of earth
work by Trapezoidal rule and Prismoidal rule.
Table 1.
Distance (m)
50
100
150
200
Ground RL(m) 164.5 165.2 166.8
167.0
167.2
Transcribed Image Text:Q2: A road embankment is 8 m wide and 200 m in length at the formation level, with a side slope of 1.5 Horizontal: 1 vertical. The embankument has arising gradient of 1 in 100 m. the ground levels at every 50 m along the center line are as in table 1. Take formation level of zero chainage is 166 m. Calculate the volume of earth work by Trapezoidal rule and Prismoidal rule. Table 1. Distance (m) 50 100 150 200 Ground RL(m) 164.5 165.2 166.8 167.0 167.2
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Highway drainage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning