Question 1: You have been assigned to design primary clarifiers for a wastewater treatment plant. The average flow rate of the wastewater is 256000 m3/day with a BOD5 of 120 mg/L and suspended solids concentration of 300 mg/L. The goal is to remove 35% BOD5 and 60% suspended solids in primary treatment. Determine the following: 1) The diameter of the primary clarifier for a surface overflow rate of 50 m3/m2-day.2) The detention time in the primary clarifier and the mass of solids removed in kg/day.Assume a depth of 4m

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
icon
Concept explainers
Question
Question 1: You have been assigned to design primary clarifiers for a wastewater treatment plant. The average flow rate of the wastewater is 256000 m3/day with a BOD5 of 120 mg/L and suspended solids concentration of 300 mg/L. The goal is to remove 35% BOD5 and 60% suspended solids in primary treatment. Determine the following: 1) The diameter of the primary clarifier for a surface overflow rate of 50 m3/m2-day.2) The detention time in the primary clarifier and the mass of solids removed in kg/day.Assume a depth of 4m.
Question 1: You have been assigned
to design primary clarifiers for a
wastewater treatment plant. The
average flow rate of the wastewater
is 25000 m3/day with a BOD5 of 120
mg/L and suspended solids
concentration of 300 mg/L. The goal
is to remove 35% BOD5 and 60%
suspended solids in primary
treatment. Determine the following:
1) The diameter of the primary
clarifier for a surface overflow rate of
50 m3/m2-day.2) The detention time
in the primary clarifier and the mass
of solids removed in kg/day.Assume a
depth of 4m.
Transcribed Image Text:Question 1: You have been assigned to design primary clarifiers for a wastewater treatment plant. The average flow rate of the wastewater is 25000 m3/day with a BOD5 of 120 mg/L and suspended solids concentration of 300 mg/L. The goal is to remove 35% BOD5 and 60% suspended solids in primary treatment. Determine the following: 1) The diameter of the primary clarifier for a surface overflow rate of 50 m3/m2-day.2) The detention time in the primary clarifier and the mass of solids removed in kg/day.Assume a depth of 4m.
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Integrated solid waste management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning