A: System capacity refers to the output produced by a system in a given time. Output depends on a…
Q: a. What is the utilization? (Round your answer to 3 decimal places.) Utilzation b. What is the…
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for…
Q: The following data pertain to operations at Quick Incorporated: Throughput time…
A: Throughput time is the total time taken to produce the product in the manufacturing process of…
Q: Additional Algo 5-6 Flow-Dependent Processing Times Two-types of student come to the career-services…
A: Scheduling with time-dependent processing times is concerned with scenarios where work processing…
Q: Capacity planning exercise A department works one eight hour shift, 250 days a year. How many…
A: Capacity planning is nothing but the process of evaluating the production capacity required by the…
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Takt time is described as the time or the rate at which products are needed to be manufactured in…
Q: A production line at V. J. Sugumaran's machine shophas three stations. The first station can process…
A: A Small Introduction about Bottleneck A bottleneck is a point of saturation in a supply chain (such…
Q: A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over…
A: Given- Restaurant Max capacity = 60 customers Output (Customer Serving) = 70 customers
Q: The Academic Computing Center has five trainers available in its computer labs to provide training…
A: Efficiency refers to the working capacity of an input. It is a measure that helps in determining the…
Q: Money Laundry has 22 washers and 34 dryers. All orders are first sent to wash and then to dry. It…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three subparts…
Q: What effect would decreasing arrival and service variability have on the effective capacity of…
A: Decreasing arrivals would mean that the servers in the system are idle for a part of the time. In a…
Q: snip
A: For any company in the market place, its main objective would be to satisfy customers and deliver…
Q: Cycle Time and Velocity, MCE Computador has a manufacturing plant in Des Moines that has the…
A: Theoretical Capability = 253,000 units Theoretical Capability = 253,000 units Actual Production=…
Q: At the Millbrook High School cafeteria, students proceed along a series of stations in asingle line:…
A: The right answer is alternative c. Due to inconstancy in processing times, both obstructing and…
Q: Compute the takt time for a system where the total time per shift is 420 minutes, there is one…
A: The answer is as below:
Q: What is the term used for the situation where a potential customer arrives at a service operation…
A: There are few instances when a potential customer reaches the service operation and if comes across…
Q: 1. PUP 48,213 UST 40,000 FEU 27,889 LRT2 200,000 passengers daily If 60% of PUP, 30% of UST, and 85%…
A: Given, PUP 48,213 UST 40,000 FEU 27,889 LRT2 200,000 passengers
Q: 'n a system with a single capacity 1 server with Random.Exponential(0.25) minutes inter-arrival time…
A: The Utilization Rate is the rate at which you use the all-out accessible season of your assets. It…
Q: A production line at V. J. Sugumaran’s machineshop has three stations. The first station can process…
A: Given that: Station 1 can process one unit in 10mins. Station 2 has two identical machines and can…
Q: It is election day and 1800 voters vote in their precinct’s library during the 10 hours thepolls are…
A: Inventory or stock is the products and materials that a business holds for a definitive objective of…
Q: T F Piggyback service is unique to air freight.
A: When dealing in the real world, an organization needs to prepare a back-up plan or should be aware…
Q: If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily…
A: Bottleneck cycle time is the longest time in the entire process. In the given question there are two…
Q: The Pullman Mfg., Inc. three-station work cell illustrated in the figure below has two machines at…
A: Note: - As we can answer only three subparts and you have not specified which three need to answer,…
Q: The site is scheduled to run from 8:00 am to 5:00 pm and has 9,000 citations today. You can start…
A: given, scheduled run = 8.00am to 5.00 pm citation = 9000 arriving rate = 1250 per hour
Q: Consider a production line with five stations. Station 1 can produce a unit in 9 minutes. Station 2…
A: Given data is
Q: Which service process structure typically involves work flows with steps that vary from one customer…
A: Service process structure is a type of structure that determines how inputs and output of a process…
Q: A work cell at Chris Ellis Commercial Laundryhas a workstation with two machines, and each unit…
A: Given Number of machines = 2 Production capacity of machine = 4 units/hour.
Q: Suppose Panini employs 1 worker at each step. a) Does Panini have enough capacity to fulfill the…
A: Given Details Grilled Vegetables Grilled Chicken Pastrami Demand per hour 25 9 12 Step…
Q: Party Apparel Inc. has 20 operators and work 8 hours a day, 5 days a week. They specialize in making…
A: Answer = 5
Q: Two workers who are responsible for10 milling machines Machines run on the average for 20 minutes,…
A: Given data: Number of workers = 2 = n Number of machines = 10 = K Average machine run time µ = 1/20…
Q: Consider an assembly line such as the burrito assembly line at Chipotle Mexican Grill. During slow…
A: Having many servers when the slow times would leave many servers to be unoccupied and free. Having a…
Q: Describe how the common tools for capacity planningsuch as waiting-line models, simulation, and…
A: A waiting line model is a mathematical approach that helps the manager to deal with the flow of…
Q: 1) Gala makeover is one of the popular beauty salons that the brides consider for their big day.…
A: Disclaimer- "Since you have asked multiple questions, we will solve the first question for you. If…
Q: Which operation is the bottleneck of this process? a. Stocking b. Pricing c. Spotting d. Shipping…
A: An operation that takes the maximum time to complete its task in a supply chain for a particular…
Q: alaxy Candy Company manufactures two popular candy bars, the Eclipse bar and the Nova bar. Both…
A: Given Information:
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Formula:
Q: a) The throughput time of the new work cell is minutes (enter your response as a whole number). b)…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: LaVilla is a village in the Italian Alps. Given its enormous popularity among Swiss, German,…
A: The answer is 150 skiers per day
Q: c) What is the cycle time corresponding to maximum throughput and actual throughput? d) Suppose that…
A: ANSWER IS GIVEN BELOW:
Q: Define Process Flow Time Reduction with example?
A: Flow-Time Reduction is getting each product, job, and process project completed sooner and faster in…
Q: A work system has five stages with processing times of of 6, 4, 2, 8, and 10 mins/unit. A product…
A: Given- A work system has five stages - Processing times for stages are 6, 4, 2, 8, and 10 mins/unit
Q: Explain why doubling the capacity of a bottleneck may not double the system capacity? Use a…
A: Answer: The limiting factor or a constraint is considered to be a 'Bottleneck' in a workstation…
Q: When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry…
A: Given information:Number of techs (N) = 3Operating time per day (H) = 8 hours…
Q: her line can produce a unit in 10 minutes. The bottleneck is station (just fill in a number in this…
A:
Q: Explain the importance of capacity planning in deciding on the no. Of police officers or fire trucks…
A: In simpler terms, supply chain can be characterized as workloads. It indicates that however much…
Q: Explain the reason why doubling the capacity of a bottleneck would not double the system capacity
A: To determine: the reason why doubling the capacity of a bottleneck would not double the system…
Q: Which operation is the bottleneck?
A: The bottleneck is a point at the production process where congestion occurs and limited capacity it…
Q: Required: Which segment is more efficient in terms of manufacturing efficiency? How can management…
A: Throughput time is the total time incurred in the production process to manufacture a product.
System capacity is based on: a) the bottleneck. b) throughput time. c) time of the fastest station. d) throughput time plus waiting time. c) none of the above. |
Step by step
Solved in 2 steps
- What is the answer to this question: The stylish hair salon has three stylists who provide services to women. After checking in with the receptionist, which takes an oaverage of 1min/customer, hair is washed and styled for 25 min on average, then payment takes 3 min. b) what i the average throughput time?Alpha Taxi and Hauling also plans to have cabs at a new rail station. The expected arrivalrate is 4.8 customers per hour, and the service rate (including return time to the rail station)is expected to be 1.5 per hour. How many cabs will be needed to achieve an average time inline of 20 minutes or less?Cycle Time and Velocity, MCE Computador has a manufacturing plant in Des Moines that has the theoretical capability to produce 253,000 laptops per quarter but currently produces 75,900 units. The conversion cost per quarter is $9,108,000. There are 63,250 production hours available within the plant per quarter. In addition to the processing minutes per unit used, the production of the laptops uses 8 minutes of move time, 22 minutes of wait time, and 5 minutes of rework time. (All work is done by cell workers.) Required: 1. Compute the theoretical and actual velocities (per hour) and the theoretical and actual cycle times (minutes per unit produced). If required, round to one decimal place. Theoretical Actual Velocity fill in the blank 1 laptops per hour fill in the blank 2 laptops per hour Cycle time fill in the blank 3 minutes per laptop fill in the blank 4 minutes per laptop 2. Compute the ideal and actual amounts of conversion cost assigned per laptop. If required,…
- RideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods with plenty of potential customers. With one lot, it has eight cars. Theinterarrival time of potential demand for this lot from its base of customers is 40 minutes.The average rental period is five hours. If a customer checks availability of vehicles in thislot online and finds that they are all rented for the desired time, the customer skips rentingand finds alternative arrangements. However, because customers pay a monthly fee tosubscribe to this service, RideShare does not want customers to be disappointed too often.a. What is the offered load?b. What is the implied utilization?c. What is the capacity of the process (rentals per hour)?d. What is the probability that all eight cars are rented at the same time?e. How many customers are served every hour?f. What is the utilization of the cars?g. How many cars should it have in this lot to ensure that it serves at least 90 percent ofdemand?Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. The table below provides demand data: Grilled Vegetables Grilled Chicken Pastrami Demand per hour 25 9 12 There are up to five steps in the process of making sandwiches listed below with activity times (if no activity time, then than step is not done for that sandwich). Only 50% of customers want their sandwich toasted, no matter which sandwich is ordered. Step Grilled Vegetables(in minutes) Grilled Chicken(in minutes) Pastrami(in minutes) Cut bread 1 1 1 Grill 1.2 1.2 Slice meat 2 Toast 1.2 1.2 1.2 Wrap 0.8 0.8 0.8 Suppose Panini employs 1 worker at each step. a) Does Panini have enough capacity to fulfill the current demand for sandwiches? (b) What is the current capacity cushion for Panini? (as a %) c) If demand for Pastramis increase with the percentage indicated below, how much additional workers should Panini hire (if any), and where…At the Millbrook High School cafeteria, students proceed along a series of stations in asingle line: (1) get tray and utensils, (2) choose food, (3) select beverage, (4) pay. Theschool is concerned that students are taking too long to get their meal. The school hasanalyzed the capacities of each of the four steps in isolation and found there exists sufficient capacity at each resource in isolation. Which of the following is most likely to becausing the congestion?a. The bottleneck is probably at the last station because capacity is reduced the mostwhen the bottleneck is at the end of the process.b. The implied utilization of the bottleneck is too low.c. Due to variability in processing times, both blocking and starving could be occurring.d. The process must be demand-constrained.e. The stations have similar utilizations.
- T F Piggyback service is unique to air freight.A work system has five stages with processing times of of 6, 4, 2, 8, and 10 mins/unit. A product must go through these stages in a sequantial order. What is the bottleneck capacity in units/hour? (Only enter a number, do not enter any units. Round your answer to the nearest whole number.Bobby, another enterprising barber, is thinking about advertising in the local newspaper since he is idle 45 percent of the time. Currently, customers arrive, on average, every 40 minutes. What does the arrival rate need to be for Bobby to be busy 85 percent of the time? Note: Round your intermediate calculations to 3 decimal places and final answer to 2 decimal places.
- Describe how the common tools for capacity planningsuch as waiting-line models, simulation, and decisiontrees assist in capacity decisions.A work cell at Chris Ellis Commercial Laundryhas a workstation with two machines, and each unit producedat the station needs to be processed by both of the machines.(The same unit cannot be worked on by both machines simultaneously.) Each machine has a production capacity of 4units per hour. What is the throughput time of the work cell?A production line at V. J. Sugumaran's machine shophas three stations. The first station can process a unit in I 0 minutes.The second station has two identical machines, each of whichcan process a unit in 12 minutes. (Each unit only needs to be processedon one of the two machines.) The third station can processa unit in 8 minutes. Which station is the bottleneck station?