Table Q2(b) provides specific details location and parameters of a small hydropower plant and dam to be built in Parit Raja. By using the given informations, determine the best location to install the hydroelectric power plant. (i) Calculate the volumetric rate, Q at each location (ii) Determine the mass flow rate, m at each location using a water density of 1000kg/m³. (iii) Calculate the actual power at each location if operating efficiency is set to 91.4%

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

pls ans soon

Table Q2(b)
Average Water| Water Flow Cross
Cost of Dam
(RM)
Location
Water Head
(m)
Flow Rate
Sectional Area
(m/s)
2.1
(m²)
7.4
1.75
7,400,000
8,400,000
7,800,000
A
1.9
1.8
8.4
C
1.5
1.9
7.8
Transcribed Image Text:Table Q2(b) Average Water| Water Flow Cross Cost of Dam (RM) Location Water Head (m) Flow Rate Sectional Area (m/s) 2.1 (m²) 7.4 1.75 7,400,000 8,400,000 7,800,000 A 1.9 1.8 8.4 C 1.5 1.9 7.8
Table Q2(b) provides specific details location and parameters of a small hydropower
plant and dam to be built in Parit Raja. By using the given informations, determine the
best location to install the hydroelectric power plant.
(b)
(i) Calculate the volumetric rate, Q at each location
(ii) Determine the mass flow rate, m at each location using a water density of
1000kg/m³.
(iii) Calculate the actual power at each location if operating efficiency is set to 91.4%
(iv) Estimate the energy in kWh for 1 year operation for each location
(v) Assuming that 313 residents in Parit Raja consume an average of 6500 kWh
energy yearly, propose a suitable location for the dam based on cost and
performance.
Transcribed Image Text:Table Q2(b) provides specific details location and parameters of a small hydropower plant and dam to be built in Parit Raja. By using the given informations, determine the best location to install the hydroelectric power plant. (b) (i) Calculate the volumetric rate, Q at each location (ii) Determine the mass flow rate, m at each location using a water density of 1000kg/m³. (iii) Calculate the actual power at each location if operating efficiency is set to 91.4% (iv) Estimate the energy in kWh for 1 year operation for each location (v) Assuming that 313 residents in Parit Raja consume an average of 6500 kWh energy yearly, propose a suitable location for the dam based on cost and performance.
Expert Solution
steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Theories of Failure
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY