The BEPZA authority decides to conduct a field compaction test by their own facilities. They already bought Ottawa sand, which is necessary for the field compaction test. However, the density is to be determined prior to its application, and hence, sand samples were sent to the geotechnical laboratory of CUET for the determination of density. The concerned staff of the laboratory has recorded the necessary data required for the determination of the density of the supplied soils, which is given in the following table: Trial Wt. of mould + dry soil (gm) Remarks 1 13471 2 13465 Wt. of mould (gm) = 10028.00 Dia of mould (cm)=16.3, 16.3, 16.3 Height of mould (cm)=10.2, 10.2, 10.2 3 13472 Determine the bulk and dry density of supplied Ottawa sand. Also, determine the void ratio of the

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
The BEPZA authority decides to conduct a field compaction test by their own facilities. They
already bought Ottawa sand, which is necessary for the field compaction test. However, the density
is to be determined prior to its application, and hence, sand samples were sent to the geotechnical
laboratory of CUET for the determination of density. The concerned staff of the laboratory has
recorded the necessary data required for the determination of the density of the supplied soils,
which is given in the following table:
Trial
Wt. of mould + dry soil (gm)
Remarks
1
13471
2
13465
Wt. of mould (gm) = 10028.00
Dia of mould (cm)=16.3, 16.3, 16.3
Height of mould (cm)=10.2, 10.2, 10.2
3
13472
Determine the bulk and dry density of supplied Ottawa sand. Also, determine the void ratio of the
soils.
Transcribed Image Text:The BEPZA authority decides to conduct a field compaction test by their own facilities. They already bought Ottawa sand, which is necessary for the field compaction test. However, the density is to be determined prior to its application, and hence, sand samples were sent to the geotechnical laboratory of CUET for the determination of density. The concerned staff of the laboratory has recorded the necessary data required for the determination of the density of the supplied soils, which is given in the following table: Trial Wt. of mould + dry soil (gm) Remarks 1 13471 2 13465 Wt. of mould (gm) = 10028.00 Dia of mould (cm)=16.3, 16.3, 16.3 Height of mould (cm)=10.2, 10.2, 10.2 3 13472 Determine the bulk and dry density of supplied Ottawa sand. Also, determine the void ratio of the soils.
Expert Solution
steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Reactions with Materials
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning