The following annual data are from a 160 MW steam turbine-generator plant. Gross generation is 780,000 MWH, net generation is 723,000 MWH, operating hours is 7,730, average load is 99.67 MW, and maximum peak load is 160 MW. Determine the load factor

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.28MCQ: The total instantaneous power delivered by a three-phase generator under balanced operating...
icon
Related questions
Question
The following annual data are from a 160 MW steam turbine-generator plant. Gross generation is 780,000 MWH, net generation is 723,000 MWH, operating hours is 7,730, average load is 99.67 MW, and maximum peak load is 160 MW. Determine the load factor
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning