This year, Benson, Inc., will produce 57,600 hot water heaters at its plant in Yuiee, Florida, in order to meet expected głobal demnand. To accomplish this, each laborer at the Yulee plant will work 160 hours per month. If the labor productivity at the plant is 0.15 hot water heaters per labor-hour, how many laborers are employed at the plant?
Q: Mariah Enterprises makes a variety of consumer electronic products. Its camera manufacturing plant…
A: Given that - The value of process output for Alpha = $150 per unit of product A and the value of…
Q: Al Maha company produces 500 units in a ten-hour day by ó workers who use 400 kilos of raw…
A: The labour productivity is in the next step
Q: , how many laborers are employed at the plant?
A: Productivity is ratio of output to the input. In other words productivity gives measure of output…
Q: The foundry has been regarded as one of the worst places to work in. The work at Grey Iron Foundry…
A: The management is the key factor in completion of the undertaken process. The management will manage…
Q: A seed company has a design capacity of 80 metric tonnes per day. It's effective capacity, However,…
A: Design capacity is 80 metric tonnes per day, effective capacity is 64 metric tonnes per day, and…
Q: A factory produces 60,000 potato bun each week and decided to buy an expensive machine for RM 13,000…
A: Current Output= 60,000 per week Productivity of existing machines= 195 buns Cost of New Machinery=…
Q: Suds and Duds Laundry washed and pressed the following num of dress shirts per week. Week Work Crew…
A: given,
Q: Martinez Company's relevant range of production is 7,500 units to 12,500 units. When it produces and…
A: To calculate the incremental manufacturing cost Martinez will incur, If it increases from 10000 to…
Q: Lake Charles Seafood makes 450 wooden packing boxes for fresh seafood per day, working in two…
A: Productivity = Output/Input Productivity for 10 hours shift : Output = 450 wooden books Input = 20…
Q: A company offers ID theft protection using leads obtained from client banks. Three employees work 40…
A:
Q: A factory produces 7,000 units of car replacement component per month which can be sold at the price…
A:
Q: A growing educational institute is planning to change its class session structure to enhance…
A:
Q: This year, Druehl, Inc., will produce 57,600hot water heaters at its plant in Delaware, in order to…
A: Given data: Output = 57600 units per year Labor time t = 160 hours per month = 160 × 12 = 1920 hours…
Q: A company has a factory that is designed so that it is most efficient (average unit cost is…
A: Capacity utilisation = Capacity Used/Best Operatiing Level * 100
Q: Manufacturing Direct Labor: Fixed or Variable?To retain skilled employees instead of letting them go…
A: Fixed Cost: Fixed costs are those cost which remains the same as the level of output. i.e. these…
Q: The weekly output of a production process is 446 units, material input is 2633 (in ft). Currently 9…
A: Given data Output = 446 unit at $157 per unit Material input = 2633 at $14 per running foot…
Q: An operation in a company produces 900 units in a ten-hour day. The units are produced by 6 workers…
A: Labor Productivity = Output unit / Input Labor Hours
Q: Sintok Machines (SM) produces cast bronze valves for use in offshore oil platforms. Currently, SM…
A: The question is related to labor productivity. Labor productivity means production per worker per…
Q: A company that processes fruits and vegetables is able to produce 1000 cases of canned peaches in 8…
A: Please refer next step for the answer
Q: A health‐check clinic has five employees and ‘processes’ 200 patients per week. Each employee works…
A: Labor productivity is the measurement of a worker’s output production in a given time period of a…
Q: A company manufactures a product using two machine cells. Each cell has a design capacity of 250…
A:
Q: An operation in a company produces 900 units in a ten-hour day. The units are produced by 6 workers…
A: Given, Output = 900 units Input = No. of workers = 6
Q: .Park Clean-Up Problem Your mathematics club has arranged to carn some extra money by cleaning up…
A: Suppose that the mathematics club has arranged to earn some extra money by cleaning up Carr Park.…
Q: The Banana Box plant produces 500 banana boxes in two 10-hour shifts. Due to higher demand, they…
A: The answer would be:
Q: A chair manufacturer who produces three different models ( A,B and C) has developed a master…
A: Given information Week No 1 2 3 4 5 A 200 0 200 0 100 B 0 0 0 200 100 C 100 300 100…
Q: Mack’s guitar fabrication shop produces low-cost, highly durable guitars for beginners. Typically,…
A:
Q: The company tuzen produces output of 4 lakhs and the various inputs used in it were - Human input…
A: Output = 4 lakhs Human Input = 20000 Rs Capital Input = 15000 Rs Material Input = 20000 Rs To be…
Q: Chuck Sox makes wooden boxes in which to ship motorcycles. Chuck and his three employees invest a…
A: GIven data as per the question : No. of working hours = 40. No. of boxes produced = 120.
Q: The senior management at Davis Watercraft would like to determine if it is possible to improve firm…
A: Given data, Model A B C Price $420 $320 $460 Material Cost $50 $30 $100 Weekly…
Q: An operation in a company produces 200 units in a ten-hour day. The units are produced by 10 workers…
A: Formula to be used; Productivity = Output/Input
Q: An operation in a company produces 200 units in a ten-hour day. The units are produced by 20 workers…
A: Labour productivity = Output/Input Where ; Output is units produced. Input is no. of labourers.
Q: Sweet Tooth Inc., a leading chocolatier, can produce 100 pounds of chocolate powder from 1000 pounds…
A: To determine the labour productivity, we would take the output pound value of the chocolate powder…
Q: This year the Druehl, Inc., will produce 57,600 hot water heaters at its plant in Delaware, in order…
A: Labor productivity is defined as how efficiently the lab
Q: Firm A operates 8 hours each day, producing 80 parts/hour. If productivity were increased 20%, how…
A: Given, Firm A operates 8 hours a day. Productivity = 80 parts/hour Productivity is increased by 20%
Q: A company that processes fruits and vegetables is able to produce 500 cases of canned peaches in 1.5…
A: Labour productivity is used to compute output relative to the input used to produce an item. It is…
Q: Alyssa’s Custom Cakes currently sells 5 birthday, 2 wedding, and 3 specialty cakes each month for…
A: a. Total revenue for the month:5 cakes ×$50 per cake = $ 2502 wedding cake ×$150 per cake = $ 3003…
Q: Sintok Machines (SM) produces cast bronze valves for use in offshore oil platforms. Currently, SM…
A: Below is the solution:-
Q: North South Bank employs several account officers, each working eight hours per day. The bank…
A: Working hours 8 per day No. of applications 30 per day Labor productivity 1.25 applications per…
Q: A health club has four employees who work on lead generation and each work 40 hours per week and has…
A: Productivity is the ability to manufacture the finished product and services more effectively and…
Q: A company has introduced a process improvement that reduces processing time for each unit, so that…
A: Explanation: old 55 units for 5 workers 5 x $13 = 65 material $15 x 55 = 825 overhead: 55 x 1.6 =…
Q: ALIBABA Ltd. is a firm in the area of Indah Permai. With standard equipment, the firm typically…
A: Small Introduction of Raw Materials The fundamental element of the processed or produced product is…
Q: The senior management at Davis Watercraft would like to determine if it is possible to improve firm…
A: a) Model A B C Price $420 $320 $460 Material Cost $50 $30 $100…
Q: For a duration of 6 weeks 19 workers in a factory were able to produce a total of 12,000 packages of…
A: Given information, Total Worker = 19 Duration = 6 weeks Total Production = 12000 Wages = 750…
Q: A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand…
A: Given, Weekly demand = 35 units Line operates for 7 hours per day and 5 days per week. Total…
Q: A company has been able to produce 235 crates by 5 workers in an 8-hour day. If the company hires…
A: No. of workers = (Total labour hours ) /8 hour per day 5 = x/ 8 x= 40 labour hours Initial…
Q: A manager faces peak (weekly) demand for one of her operations, but is not sure how long the peak…
A:
Q: A company that processes fruits and vegetables is able to produce 500 cases of canned peaches in 1.5…
A: Given- Quantity produced = 500 cases Labor hours = 1.5 hours Wages = 2 rial/hour
Q: This year, Druehl, Inc., will produce 57,600 hot water heaters at its plant in Delaware in order to…
A: Given information: Total water heaters per year (D) = 57,600 Hours worked per month (H) – 160 /…
Q: A company has a factory that is designed so that it is most efficient (average unit cost is…
A: Given, Actual output = 15,000 units Maximum possible outputs produced in October = 10,925 units
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- In December, General Motors produced 6,600 customizedvans at its plant in Detroit. The labor productivity at thisplant is known to have been 0.10 vans per labor-hour during thatmonth. 300 laborers were employed at the plant that month.a) How many hours did the average laborer work that month?b) If productivity can be increased to 0.11 vans per laborhour,how many hours would the average laborer work thatmonth?In December, General Motors produced 6,600 customized vans at its plant in Detroit. The labor productivity at this plant is known to have been 0.10 vans per labor hour during that month. 300 laborers were employed at the plant that month.a. How many hours did the average laborer work that month?b. if the productivity can be increased to 0.11 vans per labor hour, how many hours would the average laborer work that month?In December, General Motors produced 6,600 customized vans at its plant in Detroit. The labor productivity at this plant is known to have been 0.10 vans per labor-hour during that month. 300 laborers were employed at the plant that month. a. How many hours did the average laborer work that month? b. If productivity can be increased to 0.11 vans per labor-hour, how many hours would the average laborer work that month? Please show work. Thank you
- 1. A small furniture shop that focuses on making kitchen chairs produces 20,000 kitchen chairs annually. The shop is considering purchasing a new sanding machine; the machine will enable the workers to produce 30,000 chairs annually. Should the furniture shop proceed with the purchase of the new machine? a. Yes, the new machine would increase the labor productivity by 25%. b. Yes, the new machine would increase the labor productivity by 50%. c. No, the new machine would decrease the labor productivity by 50%. d. No, the new machine would increase the labor productivity by 25%. 2. Recently, Samsung released their latest flagship product, the S20. Which of the following best describes this technological development? a. General Purpose Technology b. New Invention c. Product Innovation d. Process Innovation 3. Moss is a casual video gamer. He is always curious on how do bots work in video games and how are they designed. Bots…Pak Andi is a director of a cake factory in the Bekasi area. To produce 900 cakes per day it takes the following things: Labor 300 hours per day @ $ 96 per hour Raw material 3 tons per day @ $ 2 per kg Energy $ 10,000 per day Capital cost $ 5,000 per day a. What is the labor productivity per labor-hour for the production of cakes at the factory?b. What is the multifactor productivity for cake production at the factory?c. If Mr. Andi wants to increase his production to 1,500 cakes per day without changingother variables, what is the productivity now?This year, Druehl, Inc., will produce 60,000 hot water heaters at its plant in Delaware, in order to meet expected global demand. To accomplish this, each laborer at the plant will work 160 hours per month. If the labor productivity at the plant is 0.25 hot water heaters per labor hour, how many laborers are employed at the plant?
- The manager of a crew that installs carpeting has tracked the crew’s output over the past severalweeks, obtaining these figures:Week Crew Size Yards Installed1 4 962 3 723 4 924 2 505 3 696 2 52Compute the labor productivity for each of the weeks. On the basis of your calculations, what canyou conclude about crew size and productivity?Mark Tuan, the Production Manager at MT Mills, can currently expect his operation to produce1000 square yards of fabric for each ton of raw cotton. Each ton of raw cotton requires 5 laborhours to process. He believes that he can buy a better-quality raw cotton, which will enable himto produce 1200 square yards per ton of raw cotton with the same labor hours.What will be the impact on productivity (measured in square yards per labor-hour) if hepurchases the higher quality raw cotton? You are required to calculate: a) Productivity for the current raw cotton? b) The new productivity if Mark Tuan use the new raw cotton. c) What is the percentage increase in productivity?If the insurance company can process 60 (10 percent) morepolicies per week, by what percentage will the productivitymeasure rise?2. Suppose the 8-hour day includes a 45-minute lunch. What isthe revised productivity measure, excluding lunch?3. If an employee is hired, what will be the weekly number ofpolicies processed if the productivity of five policies per houris maintained?4. Suppose that, during the summer, the company works for only 4days per week. What will be the weekly number of policies processed if the productivity of five policies per hour is maintained?
- A fast-food restaurant serves hamburgers, cheeseburgers, and chicken sandwiches. The restaurant counts a cheeseburger as equivalent to 1.25 hamburgers and chicken sandwiches as 0.8 hamburger. Current employment is i ve full-time employees who each work a 40-hour week. If the restaurant sold 700 hamburgers, 900 cheeseburgers, and 500 chicken sandwiches in one week, what is its productivity? What would its productivity have been if it had sold the same number of sandwiches (2,100), but the mix was 700 of each type?Mr. ichul is a Director of a pastry factory in Bandung. To produce 350 cakes per day it takes the following things Labor : 350 hours / day @ $5 / hourRaw Material : 2 ton / day @ $1 / kgEnergy : $2,000 / dayCapital Cost : $500 / day a. What is the labor productivity per labor-hour for cake production at the factory?b. What is the multifactor productivity for cake production at the factory?c. In order to meet the needs for Eid later, Mr. ichul wants to increase his production to500 more per day than the previous cake production without changing other variables, what is the productivity now?An air-conditioner factory makes three different types of air-conditioners: the ceiling type, the cassette type and the wall-mounted type. Weekly sales of each type are 2, 4 and 6 pieces, at a price of €350, €450, and €500 each, respectively. The ceiling typecan be assembled in 1.5 hours, the cassette type in 1 hour and thewall-mounted type in 45 minutes. Labour cost is €40 per hour andthe current factory’s multi factor productivity is 2.2. a) Calculate the average cost per air-conditioner based on cur-rent multifactor productivity b) Calculate labor productivity (in euro per hour) for each typeof air-conditionc) Where the company should focus its efforts, based (i) on thelabor productivity, and (ii) on average cost?