General contractor

Sort By:
Page 5 of 50 - About 500 essays
  • Better Essays

    The Procurement Structure Figure 1 Organization Flow Chart The delivery method chosen here is the Construction Manager at Risk. The explanation for selection of this method is given below: A strict time frame: The time frame alloted is an overall period of 2 years in which only 14 months is alloted for the construction processes. So CM at risk would be a better option since a construction manager can be appointed early on in the design phase and he can work closely with the client’s professional

    • 2289 Words
    • 10 Pages
    Better Essays
  • Better Essays

    (In Collaboration) Dieter Kienast Günther Vogt, Partnered with Charles Funke Associates Structural Engineering (General Contractor) Ove Arup & Partners Directors: John Hirst, Tony Marriott Fit–out Manager/ Sub-Contractor Interior PLC Project Manager: Steve Howe Furniture Consultant Jasper Morrison Steel Framework/ Sub-Contractor Rowen Structures Foundation Work/ Sub-contractor Birse Construction Grand Stairs True Brothers Kegsworth 1999 The number of personnel on the project had increased

    • 878 Words
    • 4 Pages
    Better Essays
  • Satisfactory Essays

    direction. 5. Challenges will be faced whatsoever in the fast paced & dynamic industry like construction. Being subcontractor, having known this fact and given I had a long term relation with a loyal general contractor, I would not strain our relation at the times of financial crunch for general contractor. If the bills are paid on time and as long as the client is happy, I would not mind getting delayed in the payment of my retainage. 6. There is a clear evidence form the information that even though

    • 858 Words
    • 4 Pages
    Satisfactory Essays
  • Decent Essays

    In early 1987, L & A Construction Company started building a bridge in Apalachicola Florida. As the general contractor, L & A subcontracted concrete delivery to Southern Concrete Services. The subcontract required Southern Concrete to obtain a performance bond. Southern received the bond from Fidelity & Deposit Company of Maryland, and started supplying the concrete that same year. According to the court, it is agreed “that Southern failed to provide sufficient concrete to L & A in a timely manner

    • 830 Words
    • 4 Pages
    Decent Essays
  • Better Essays

    Executive Summary The construction industry plays an integral role in the economies by providing infrastructure to all other industries. This report discusses the factors that are pertinent to establishing construction operations in the European market, with a main focus on Prime Constructions Company Ltd. The assessment of the markets is discussed with an entry mode proposed. Moreover, the supply chain the company would need to adopt as well as the innovation strategies and risks therein are also

    • 1759 Words
    • 8 Pages
    Better Essays
  • Good Essays

    Heartly House Charity Tree, December 2014, December 2015 Frederick, MD Initiated and organized holiday fundraiser for two consecutive years at MAXIMUS Federal Services and raised $1,200 in four weeks from gifts donated by employees. As part of my assignment while employed with Kearney & Company, P.C. (Kearney), I was assigned the responsibility of acting as a member on the prime contractor’s (MAXIMUS) Social Committee. As an active member of the committee, my colleagues and I were tasked with promoting

    • 1097 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Rybak Case Summary

    • 1034 Words
    • 5 Pages

    85 ORDER 1. The applicant’s claim against the First Respondent Greenhill Timbers Pty Ltd and the Third Respondent Wladyslaw Rybak trading as Rybak Services is dismissed. 2. As requested by the Applicant, Josef Peter Garbiec trading as Multi Design Floors shall at his own expense repair and/or replace the polished timber floor supplied by Multi Design Floors at the applicant’s premises at 39 Tennyson St, Elwood 3184 in accordance with the requirements of the expert report of Australian Timber Flooring

    • 1034 Words
    • 5 Pages
    Good Essays
  • Decent Essays

    Unit 5 P1

    • 1217 Words
    • 5 Pages

    Unit 5 – Construction Technology and Design in Construction and the Built Environment Task 1 (P1, P2, P3, M1 & D1) P1 Describe the factors that influence the design process There are a variety of different factors that influence the design process. The first one is the client’s needs and amount of money they have, the design has to suit the client’s needs so that the design meets what they like. Therefore the design will need to change to suit their needs. Their design needs to be suitable to the

    • 1217 Words
    • 5 Pages
    Decent Essays
  • Decent Essays

    QBCC has been issuing the list of ten most common defects each year in its annual report. Many of these issues have been repeating every year as the top ten common defects yet there has been little to non-research has been done, to identify the root cause of it and to minimise or eradicate them nor has QBCC provided any suggestion on how to eradicate them or to minimise them in their report. Table 9: Top ten defects approved by QBCC Top ten common defects (2011-2012) Top ten common defects (2012-2013)

    • 1122 Words
    • 5 Pages
    Decent Essays
  • Good Essays

    The design manager will coordinate the design consultants and the sub-contractors with design responsibility and will be the liaison between them and the PM. The planner will develop the construction programme and sequence with the PM and report site progress on a monthly basis to the contractor’s senior management team. The

    • 2181 Words
    • 9 Pages
    Good Essays